Telangana Chief Minister A. Revanth Reddy inaugurated the ₹620-crore Chanchalguda–Santoshnagar steel flyover in Hyderabad on Thursday, September 3, 2026. The new 3.2-kilometre elevated corridor introduces a major north-south connection through the city’s south-eastern suburbs, allowing commuters to bypass heavy surface congestion at critical junctions. During the opening, the Chief Minister also outlined an extensive infrastructure roadmap for the Old City, including new metro extensions and a cable bridge over Mir Alam Tank.
| Detail | Info |
|---|---|
| Project Cost | ₹620 crore |
| Flyover Length | Approximately 3.2 km (3.32 km in engineering reports) |
| Configuration | Four lanes, elevated steel structure |
| Key Connections | Chanchalguda Printing Press to Santoshnagar |
| Proposed Infrastructure | 3-km Mir Alam Tank cable bridge, Gowliguda–Chandrayanagutta Metro |
| Inauguration Date | September 3, 2026 |
CM Revanth Reddy Opens 3.2-Km Chanchalguda Elevated Corridor
The four-lane steel flyover connects the Chanchalguda Printing Press area directly with Santoshnagar. According to project reports, the corridor is engineered to carry through-traffic above busy surface-level intersections, specifically targeting the severe congestion points at Central Jail crossroads, Saidabad, and IS Sadan.
At the inauguration ceremony, Chief Minister Reddy described Hyderabad’s Old City as the “original city” and instructed state officials to fast-track pending development requests. Beyond the flyover, Reddy sanctioned a ₹25-crore allocation for a local college following a formal request from Hyderabad MP and AIMIM chief Asaduddin Owaisi.
The ₹620-crore project stands as one of the most substantial recent capital investments in south Hyderabad’s road infrastructure, designed to streamline daily mobility for thousands of vehicles travelling toward the city’s southern and eastern fringes.
Impact on Commuters and South Hyderabad Real Estate
Daily commuters travelling between Chanchalguda, Saidabad, IS Sadan, Santoshnagar, Champapet, and surrounding south Hyderabad locations are the immediate beneficiaries of the newly opened route. By separating elevated through-traffic from local street traffic, the flyover is expected to significantly reduce travel delays during peak hours.
Residents and commercial property owners along the approach roads may experience improved accessibility. However, homebuyers and investors evaluating the area’s property market should note that traffic patterns, neighborhood entry points, and local street congestion could shift as traffic operations stabilise. Buyers looking into newly announced residential buildings nearby are advised to verify Telangana RERA Approved Projects to ensure developer compliance before making financial commitments.
Old City Metro Extensions and Mir Alam Tank Plans
In addition to opening the flyover, the Chief Minister announced major future mobility projects focused on the Old City. The centerpiece is the planned metro rail connection between Gowliguda and Chandrayanagutta. Reddy publicly committed that this crucial transit link would be completed before the next Assembly elections.
Furthermore, the state government outlined a wider metro network extension toward several southern suburbs, including routes linking Nagole, LB Nagar, Bandlaguda, Rajendranagar, and Shamshabad. Reddy also confirmed proposals for a scenic 3-kilometre cable bridge across Mir Alam Tank. Investors looking to acquire plots along these proposed transit corridors should conduct a thorough Bhu Bharati Land Search to confirm clear titles ahead of any potential land appreciation.
“We may have differences in political opinion, but no one should question Asaduddin Owaisi’s patriotism.”
Political Claims Over Old City Infrastructure Foundations
The inauguration highlighted ongoing political dynamics surrounding urban development in south Hyderabad. Speaking at the event, Hyderabad MP Asaduddin Owaisi expressed gratitude to the Chief Minister for the new project announcements. Owaisi clarified that his party’s cooperation was extended to Reddy personally, rather than to the Congress party as a whole.
Owaisi also noted the project’s history, claiming that the foundation stone for the steel flyover was laid during the tenure of the previous BRS government, but actual construction only gained momentum after Reddy released the necessary funds. This remains an attributed political statement regarding the project’s timeline.
Tracking the Gowliguda–Chandrayanagutta Metro Timeline
With the flyover now operational, public and investor attention will shift toward the execution of the newly announced transit plans. The immediate watchpoints will be the formal cabinet approvals, funding allocations, and tender releases for the Gowliguda–Chandrayanagutta metro line.
Because the Chief Minister has tied the metro completion to the next Assembly-election cycle, the state administration will need to advance rapidly through land acquisition and detailed engineering reports over the coming months.
Reality Check
While the flyover provides a near-term mobility boost, its broader real-estate impact will depend heavily on efficient approach-road management and the successful redistribution of traffic. Furthermore, the Gowliguda–Chandrayanagutta metro and the Mir Alam Tank cable bridge are currently proposed future works, not operational infrastructure. Relying on these unbuilt projects for immediate property appreciation or investment returns carries risks, as timelines and final alignments are subject to change.
Analysis
The ₹620-crore opening is a tangible, verified infrastructure milestone that strengthens links across south Hyderabad. However, claims of a complete and immediate transformation of the Old City’s property market remain premature. Genuine uplift in commercial and residential property values will only materialise when reliable last-mile connectivity is established, traffic bottlenecks are proven to be eliminated rather than just relocated, and subsequent phases of the metro network enter active construction.
Frequently Asked Questions
When was the Chanchalguda–Santoshnagar flyover inaugurated?
Telangana Chief Minister A. Revanth Reddy inaugurated the newly built elevated corridor on Thursday, September 3, 2026.
How much did the steel flyover cost?
According to official reports, the four-lane infrastructure project was completed at an estimated cost of ₹620 crore.
How long is the new elevated corridor?
The flyover is a four-lane structure approximately 3.2 kilometres long, with some engineering reports citing a precise length of 3.32 km.
Which specific areas does the flyover connect?
It links the Chanchalguda Printing Press area directly with Santoshnagar. It is designed to ease traffic movement through Saidabad, IS Sadan, and the surrounding neighborhoods in south Hyderabad.
What other Old City projects were announced?
The Chief Minister announced the future Gowliguda–Chandrayanagutta metro connection, further extensions toward Nagole, LB Nagar, Bandlaguda, Rajendranagar, and Shamshabad, and proposed a 3-kilometre cable bridge across Mir Alam Tank.
Is the proposed Old City metro already completed?
No. The metro connection was announced as a future project. The Chief Minister stated that the Gowliguda–Chandrayanagutta line would be completed before the next Assembly elections.
Stay Ahead on Hyderabad Real Estate
Get daily property news, price trends and verified listings.
Follow us on WhatsApp or download the BigProperty App for instant alerts.


