{"id":18947,"date":"2024-09-14T16:12:12","date_gmt":"2024-09-14T10:42:12","guid":{"rendered":"https:\/\/blog.bigproperty.in\/?p=18947"},"modified":"2024-09-14T16:12:13","modified_gmt":"2024-09-14T10:42:13","slug":"bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more","status":"publish","type":"post","link":"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/","title":{"rendered":"Bengaluru SubUrban Rail Project: Complete Guide to Stations, Corridors &amp; more"},"content":{"rendered":"<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_81 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #000000;color:#000000\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #000000;color:#000000\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#Overview_of_the_Bengaluru_Suburban_Rail_Project\" >Overview of the Bengaluru Suburban Rail Project<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#Key_Details\" >Key Details<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#Corridor_1_Sampige_Line\" >Corridor 1: Sampige Line<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#Corridor_2_Mallige_Line\" >Corridor 2: Mallige Line<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#Corridor_3_Parijaata_Line\" >Corridor 3: Parijaata Line<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#Corridor_4_Kanaka_Line\" >Corridor 4: Kanaka Line<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#Bengaluru_SubUrban_rail_project_Route_Map\" >Bengaluru SubUrban rail project Route Map<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#Bengaluru_SubUrban_Rail_Project_Status\" >Bengaluru SubUrban Rail Project Status:<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#1_Sampige_Line\" >1.&nbsp;Sampige Line<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#2_Mallige_Line\" >2.&nbsp;Mallige Line<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#3_Parijaata_Line\" >3.&nbsp;Parijaata Line<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#4_Kanaka_Line\" >4.&nbsp;Kanaka Line<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#Bengaluru_Suburban_Rail_Project_Funded_by\" >Bengaluru Suburban Rail Project Funded by:<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#Government_Funding\" >Government Funding<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#External_Loans\" >External Loans<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#Project_Financing\" >Project Financing<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#Land_Monetization\" >Land Monetization<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#Benefits_of_the_Bengaluru_Suburban_Rail_Project\" >Benefits of the Bengaluru Suburban Rail Project<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-19\" href=\"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#1_Reduced_Traffic_Congestion\" >1.&nbsp;Reduced Traffic Congestion<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-20\" href=\"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#2_Improved_Connectivity\" >2.&nbsp;Improved Connectivity<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-21\" href=\"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#3_Environmental_Impact\" >3.&nbsp;Environmental Impact<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-22\" href=\"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#4_Economic_Growth\" >4.&nbsp;Economic Growth<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-23\" href=\"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#5_Integrated_Transport_Solutions\" >5.&nbsp;Integrated Transport Solutions<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-24\" href=\"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#Unique_Facilities_of_the_Bengaluru_Suburban_Rail_Project\" >Unique Facilities of the Bengaluru Suburban Rail Project<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-25\" href=\"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#Bengaluru_SubUrban_Rail_Automated_Fare_Collection_SystemAFC\" >Bengaluru SubUrban Rail Automated Fare Collection System(AFC):<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-26\" href=\"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#Key_Components_of_the_AFC_System\" >Key Components of the AFC System<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-27\" href=\"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#How_the_AFC_System_Works\" >How the AFC System Works<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-28\" href=\"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#Benefits_of_the_AFC_System\" >Benefits of the AFC System<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-29\" href=\"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#Suggested_Articles\" >Suggested Articles:<\/a><\/li><\/ul><\/nav><\/div>\n\n<p>The Bengaluru Suburban Rail Project (BSRP) is a transformative infrastructure initiative aimed at revolutionizing public transport in the bustling city of Bengaluru, India. This ambitious project, which has been in the planning stages since 1983, aims to provide a reliable and efficient commuter rail system that connects the city with its suburbs, significantly easing traffic congestion and enhancing the overall quality of life for residents.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Overview_of_the_Bengaluru_Suburban_Rail_Project\"><\/span><strong>Overview of the Bengaluru Suburban Rail Project<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The BSRP is designed to cover a total length of&nbsp;<strong>149.348 kilometers<\/strong>&nbsp;and will consist of&nbsp;<strong>four main corridors<\/strong>. The project aims to serve approximately&nbsp;<strong>9.84 lakh passengers daily<\/strong>&nbsp;upon completion, providing an affordable and eco-friendly alternative to road transport.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img decoding=\"async\" width=\"500\" height=\"330\" src=\"https:\/\/bigproperty.in\/blog\/\/wp-content\/uploads\/2024\/09\/b7d9cc574fa8d6ca99a9daf3bc54e4ed.jpg\" alt=\"suburban rail bengaluru\" class=\"wp-image-18951\" style=\"width:588px;height:auto\" srcset=\"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/09\/b7d9cc574fa8d6ca99a9daf3bc54e4ed.jpg 500w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/09\/b7d9cc574fa8d6ca99a9daf3bc54e4ed-300x198.jpg 300w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/figure>\n\n\n\n<p class=\"has-small-font-size\">source: railjournal<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Key_Details\"><\/span><strong>Key Details<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Total Length<\/strong>: 149.348 km<\/li>\n\n\n\n<li><strong>Number of Stations<\/strong>: 64 planned stations<\/li>\n\n\n\n<li><strong>Estimated Cost<\/strong>: \u20b915,767 crore (approximately $2 billion)<\/li>\n\n\n\n<li><strong>Completion Target<\/strong>: December 2026 for two corridors, with full completion expected by 2028<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Corridor_1_Sampige_Line\"><\/span><strong>Corridor 1: Sampige Line<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Route<\/strong>: KSR Bengaluru \u2013 Yelahanka \u2013 Devanahalli<\/li>\n\n\n\n<li><strong>Length<\/strong>: 41.478 km<\/li>\n\n\n\n<li><strong>Type<\/strong>:\n<ul class=\"wp-block-list\">\n<li>Elevated: 19.22 km<\/li>\n\n\n\n<li>At-Grade: 22.278 km<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>Depot<\/strong>: Akkupet Depot<\/li>\n\n\n\n<li><strong>Number of Stations<\/strong>: 15 (8 elevated &amp; 7 at-grade)<\/li>\n\n\n\n<li><strong>Station Names<\/strong>:<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th><strong>Station Name<\/strong><\/th><th><strong>Type<\/strong><\/th><\/tr><\/thead><tbody><tr><td>KSR Bengaluru City<\/td><td>Interchange<\/td><\/tr><tr><td>Srirampura<\/td><td>Future<\/td><\/tr><tr><td>Malleswaram<\/td><td>At-Grade<\/td><\/tr><tr><td>Yesvantpur<\/td><td>Interchange<\/td><\/tr><tr><td>Muthyal Nagar<\/td><td>At-Grade<\/td><\/tr><tr><td>Lottegollahalli<\/td><td>Interchange<\/td><\/tr><tr><td>Kodigehalli<\/td><td>At-Grade<\/td><\/tr><tr><td>Judicial Layout<\/td><td>At-Grade<\/td><\/tr><tr><td>Yelahanka<\/td><td>At-Grade<\/td><\/tr><tr><td>Nitte Meenakshi<\/td><td>At-Grade<\/td><\/tr><tr><td>Bettahalasoor<\/td><td>At-Grade<\/td><\/tr><tr><td>Doddajala<\/td><td>At-Grade<\/td><\/tr><tr><td>Airport Trumpet<\/td><td>At-Grade<\/td><\/tr><tr><td>Airport Terminal<\/td><td>At-Grade<\/td><\/tr><tr><td>Airport KIADB<\/td><td>At-Grade<\/td><\/tr><tr><td>Devanahalli<\/td><td>At-Grade<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><em>Note: A suburban rail link is proposed to Bengaluru International Airport in this corridor.<\/em><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Corridor_2_Mallige_Line\"><\/span><strong>Corridor 2: Mallige Line<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Route<\/strong>: Baiyyappanahalli Terminal \u2013 Chikkabanavara<\/li>\n\n\n\n<li><strong>Length<\/strong>: 24.866 km<\/li>\n\n\n\n<li><strong>Type<\/strong>:\n<ul class=\"wp-block-list\">\n<li>Elevated: 7.723 km<\/li>\n\n\n\n<li>At-Grade: 17.143 km<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>Depot<\/strong>: Jalahalli Depot<\/li>\n\n\n\n<li><strong>Number of Stations<\/strong>: 14 (6 elevated &amp; 8 at-grade)<\/li>\n\n\n\n<li><strong>Station Names<\/strong>:<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th><strong>Station Name<\/strong><\/th><th><strong>Type<\/strong><\/th><\/tr><\/thead><tbody><tr><td>Chikka Banavara<\/td><td>At-Grade<\/td><\/tr><tr><td>Myadarahalli<\/td><td>At-Grade<\/td><\/tr><tr><td>Shettyhalli<\/td><td>At-Grade<\/td><\/tr><tr><td>Jalahalli (future)<\/td><td>Future<\/td><\/tr><tr><td>Yesvantpur (interchange)<\/td><td>Interchange<\/td><\/tr><tr><td>Lottegollahalli (interchange)<\/td><td>Interchange<\/td><\/tr><tr><td>Hebbal<\/td><td>At-Grade<\/td><\/tr><tr><td>Kanaka Nagar<\/td><td>At-Grade<\/td><\/tr><tr><td>Nagawara<\/td><td>At-Grade<\/td><\/tr><tr><td>Kaveri Nagar (future)<\/td><td>Future<\/td><\/tr><tr><td>Banaswadi<\/td><td>At-Grade<\/td><\/tr><tr><td>Seva Nagar<\/td><td>At-Grade<\/td><\/tr><tr><td>Kasturi Nagar<\/td><td>At-Grade<\/td><\/tr><tr><td>Baiyapanahalli (interchange)<\/td><td>Interchange<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Corridor_3_Parijaata_Line\"><\/span><strong>Corridor 3: Parijaata Line<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Route<\/strong>: Kengeri \u2013 Whitefield<\/li>\n\n\n\n<li><strong>Length<\/strong>: 35.52 km<\/li>\n\n\n\n<li><strong>Type<\/strong>:\n<ul class=\"wp-block-list\">\n<li>Elevated: 10.40 km<\/li>\n\n\n\n<li>At-Grade: 25.12 km<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>Number of Stations<\/strong>: 14 (4 elevated &amp; 10 at-grade)<\/li>\n\n\n\n<li><strong>Station Names<\/strong>:<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th><strong>Station Name<\/strong><\/th><th><strong>Type<\/strong><\/th><\/tr><\/thead><tbody><tr><td>Kengeri<\/td><td>At-Grade<\/td><\/tr><tr><td>RV College (future)<\/td><td>Future<\/td><\/tr><tr><td>Jnanabharati<\/td><td>At-Grade<\/td><\/tr><tr><td>Nayandahalli<\/td><td>At-Grade<\/td><\/tr><tr><td>Krishnadevaraya<\/td><td>At-Grade<\/td><\/tr><tr><td>Jagjeevanram Nagar<\/td><td>At-Grade<\/td><\/tr><tr><td>KSR Bengaluru City (interchange)<\/td><td><strong>Interchange<\/strong><\/td><\/tr><tr><td>Kumara Park<\/td><td>At-Grade<\/td><\/tr><tr><td>Bengaluru Cantt<\/td><td>At-Grade<\/td><\/tr><tr><td>Bengaluru East<\/td><td>At-Grade<\/td><\/tr><tr><td>Baiyapannahalli<\/td><td>At-Grade<\/td><\/tr><tr><td>Krishnarajapura<\/td><td>At-Grade<\/td><\/tr><tr><td>Hoodi<\/td><td>At-Grade<\/td><\/tr><tr><td>Whitefield<\/td><td>At-Grade<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Corridor_4_Kanaka_Line\"><\/span><strong>Corridor 4: Kanaka Line<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Route<\/strong>: Heelalige \u2013 Rajanukunte<\/li>\n\n\n\n<li><strong>Length<\/strong>: 46.285 km<\/li>\n\n\n\n<li><strong>Type<\/strong>:\n<ul class=\"wp-block-list\">\n<li>Elevated: 8.96 km<\/li>\n\n\n\n<li>At-Grade: 37.92 km<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>Depot<\/strong>: Silkboard Depot<\/li>\n\n\n\n<li><strong>Number of Stations<\/strong>: 19 (4 elevated &amp; 15 at-grade)<\/li>\n\n\n\n<li><strong>Station Names<\/strong>:<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th><strong>Station Name<\/strong><\/th><th><strong>Type<\/strong><\/th><\/tr><\/thead><tbody><tr><td>Rajanukunte<\/td><td>At-Grade<\/td><\/tr><tr><td>Muddana Halli<\/td><td>At-Grade<\/td><\/tr><tr><td>Yelahanka<\/td><td><strong>Interchange<\/strong><\/td><\/tr><tr><td>Jakkur<\/td><td>At-Grade<\/td><\/tr><tr><td>Hegde Nagar<\/td><td>At-Grade<\/td><\/tr><tr><td>Thanisandra<\/td><td>At-Grade<\/td><\/tr><tr><td>Hennur<\/td><td>At-Grade<\/td><\/tr><tr><td>Horamavu<\/td><td>At-Grade<\/td><\/tr><tr><td>Channasandra<\/td><td>At-Grade<\/td><\/tr><tr><td>Benniganahalli<\/td><td><strong>Interchange<\/strong><\/td><\/tr><tr><td>Kagadaspura<\/td><td>At-Grade<\/td><\/tr><tr><td>Doddanekundi<\/td><td>At-Grade<\/td><\/tr><tr><td>Marathahalli<\/td><td>At-Grade<\/td><\/tr><tr><td>Belandur Road<\/td><td>At-Grade<\/td><\/tr><tr><td>Carmelaram<\/td><td>At-Grade<\/td><\/tr><tr><td>Ambedkar Nagar<\/td><td>At-Grade<\/td><\/tr><tr><td>Huskur<\/td><td>At-Grade<\/td><\/tr><tr><td>Singena Agrahara<\/td><td>Future<\/td><\/tr><tr><td>Bommasandra<\/td><td>Future<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><em>Note: Five stations will serve as interchange stations across the corridors, enhancing connectivity and accessibility for commuters<\/em><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Also read:<mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\"> <\/mark><a href=\"https:\/\/bigproperty.in\/blog\/\/bengaluru-twin-tube-tunnels-latest-insights-cost-major-corridors-2024\/\"><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">Bengaluru Twin Tube Tunnels: Latest Insights, Cost &amp; Major Corridors 2024<\/mark><\/a><\/h3>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Bengaluru_SubUrban_rail_project_Route_Map\"><\/span><strong>Bengaluru SubUrban rail project Route Map<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img decoding=\"async\" width=\"801\" height=\"1024\" src=\"https:\/\/bigproperty.in\/blog\/\/wp-content\/uploads\/2024\/09\/BengaluruSuburbanRailRouteMap-801x1024.jpg\" alt=\"\" class=\"wp-image-18948\" style=\"width:758px;height:auto\" srcset=\"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/09\/BengaluruSuburbanRailRouteMap-801x1024.jpg 801w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/09\/BengaluruSuburbanRailRouteMap-235x300.jpg 235w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/09\/BengaluruSuburbanRailRouteMap-768x981.jpg 768w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/09\/BengaluruSuburbanRailRouteMap-696x889.jpg 696w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/09\/BengaluruSuburbanRailRouteMap-329x420.jpg 329w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/09\/BengaluruSuburbanRailRouteMap.jpg 900w\" sizes=\"(max-width: 801px) 100vw, 801px\" \/><\/figure>\n\n\n\n<p class=\"has-small-font-size\">source: themetrorailguy<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Bengaluru_SubUrban_Rail_Project_Status\"><\/span><strong>Bengaluru SubUrban Rail Project Status<\/strong>:<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Current Status of Corridors<\/strong><\/h3>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"1_Sampige_Line\"><\/span>1.&nbsp;<strong>Sampige Line<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Route<\/strong>: KSR Bengaluru \u2013 Yelahanka \u2013 Devanahalli<\/li>\n\n\n\n<li><strong>Length<\/strong>: 41.478 km<\/li>\n\n\n\n<li><strong>Status<\/strong>: A revised alignment plan has been submitted for approval. Tenders for the KSR Bengaluru City to Yelahanka section are expected to be opened on October 9, 2024. The line will include a direct link to Kempegowda International Airport.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"2_Mallige_Line\"><\/span>2.&nbsp;<strong>Mallige Line<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Route<\/strong>: Baiyyappanahalli \u2013 Chikkabanavara<\/li>\n\n\n\n<li><strong>Length<\/strong>: 24.866 km<\/li>\n\n\n\n<li><strong>Status<\/strong>: The civil works contract was awarded to\u00a0<strong>Larsen &amp; Toubro<\/strong>\u00a0in August 2022. The project has achieved 28% physical progress and is expected to complete the priority section from Chikkabanavara to Yeshwantpur by December 2025.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"3_Parijaata_Line\"><\/span>3.&nbsp;<strong>Parijaata Line<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Route<\/strong>: Kengeri \u2013 Whitefield<\/li>\n\n\n\n<li><strong>Length<\/strong>: 35.52 km<\/li>\n\n\n\n<li><strong>Status<\/strong>: The alignment plan is awaiting approval. Discussions are ongoing regarding shared tracks for part of the route.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"4_Kanaka_Line\"><\/span>4.&nbsp;<strong>Kanaka Line<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Route<\/strong>: Heelalige \u2013 Rajanukunte<\/li>\n\n\n\n<li><strong>Length<\/strong>: 46.285 km<\/li>\n\n\n\n<li><strong>Status<\/strong>: The civil works contract was awarded to\u00a0<strong>L&amp;T<\/strong>\u00a0in 2023, with pre-construction activities currently underway.<\/li>\n<\/ul>\n\n\n\n<p>Also read:<mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\"> <\/mark><a href=\"https:\/\/bigproperty.in\/blog\/\/bengaluru-twin-tube-tunnels-latest-insights-cost-major-corridors-2024\/\"><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">Bengaluru Twin Tube Tunnels: Latest Insights, Cost &amp; Major Corridors 2024<\/mark><\/a><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Bengaluru_Suburban_Rail_Project_Funded_by\"><\/span><strong>Bengaluru Suburban Rail Project Funded by<\/strong>:<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The Bengaluru Suburban Rail Project (BSRP) is being funded through a combination of sources:<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Government_Funding\"><\/span><strong>Government Funding<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The central government is providing 20% of the equity for the project.<\/li>\n\n\n\n<li>The state government of Karnataka is also contributing 20% of the equity.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"External_Loans\"><\/span><strong>External Loans<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The project is being funded by external assistance for up to 60% of the total cost.<\/li>\n\n\n\n<li>In December 2023, the German investment bank KfW signed an MoU for a \u20ac500 million (Rs 4,552 crore) loan for the project.<\/li>\n\n\n\n<li>In June 2024, the European Investment Bank (EIB) signed an MoU for a \u20ac300 million loan.<\/li>\n\n\n\n<li>Together, the \u20ac800 million (Rs 7,104 crore) loan from KfW and EIB covers 60% of the total project cost of Rs 15,767 crore.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Project_Financing\"><\/span><strong>Project Financing<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The remaining 40% of the project cost will be covered through a combination of state and central government equity.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Land_Monetization\"><\/span><strong>Land Monetization<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Land monetization is also being explored as a source of funding for the project.<\/li>\n<\/ul>\n\n\n\n<p>The funding mix of 20% equity each from the central and state governments, 60% external loans, and the remaining 20% through project financing and land monetization aims to make the BSRP financially viable and sustainable in the long run<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Benefits_of_the_Bengaluru_Suburban_Rail_Project\"><\/span><strong>Benefits of the Bengaluru Suburban Rail Project<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The BSRP is expected to offer numerous benefits to commuters and the city as a whole:<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"1_Reduced_Traffic_Congestion\"><\/span>1.&nbsp;<strong>Reduced Traffic Congestion<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>With the capacity to carry nearly&nbsp;<strong>10 lakh passengers daily<\/strong>, the suburban rail system will significantly alleviate road traffic, particularly during peak hours.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"2_Improved_Connectivity\"><\/span>2.&nbsp;<strong>Improved Connectivity<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The project will connect various key residential and commercial areas across the city, making it easier for residents to access employment opportunities and amenities.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"3_Environmental_Impact\"><\/span>3.&nbsp;<strong>Environmental Impact<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>By promoting the use of public transport, the BSRP will contribute to reduced carbon emissions and lower air pollution levels in Bengaluru.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"4_Economic_Growth\"><\/span>4.&nbsp;<strong>Economic Growth<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The construction and operation of the suburban rail system are expected to create jobs and stimulate economic activity in the surrounding areas, contributing to the overall growth of the city.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"5_Integrated_Transport_Solutions\"><\/span>5.&nbsp;<strong>Integrated Transport Solutions<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The design includes provisions for seamless transfers between different modes of transport, enhancing the overall commuting experience for users<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Unique_Facilities_of_the_Bengaluru_Suburban_Rail_Project\"><\/span><strong>Unique Facilities of the Bengaluru Suburban Rail Project<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>1. Integrated Commercial Hubs<\/strong><\/h3>\n\n\n\n<p>Many stations within the BSRP will be designed as&nbsp;<strong>integrated commercial hubs<\/strong>. These hubs will not only serve as transit points but will also house shopping, dining, and recreational facilities, allowing commuters to engage in various activities before or after their journeys. This design aims to create a vibrant atmosphere around the stations, contributing to the local economy.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>2. Intermodal Integration<\/strong><\/h3>\n\n\n\n<p>The BSRP will feature&nbsp;<strong>intermodal integration hubs<\/strong>&nbsp;at various stations, facilitating seamless transitions between different modes of transport. Commuters will be able to switch easily between the suburban rail, metro trains, public buses, and other transport services, mirroring the efficient systems found in European cities. This integration will enhance the overall commuting experience and reduce travel time.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>3. Automated Fare Collection<\/strong><\/h3>\n\n\n\n<p>To streamline the travel process, the project will implement an&nbsp;<strong>automated fare collection system<\/strong>. This technology will allow for quick and efficient ticketing, minimizing queues and wait times at stations. Additionally,&nbsp;<strong>platform screen doors<\/strong>&nbsp;will be installed to enhance safety and improve passenger flow.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>4. Modern Rolling Stock<\/strong><\/h3>\n\n\n\n<p>The BSRP plans to utilize&nbsp;<strong>modern Metro Train sets (EMU)<\/strong>, specifically the RS 13 series used in the Delhi Metro, which are manufactured locally by BEML in Bangalore. These trains will provide a comfortable and efficient travel experience, equipped with features that cater to the needs of daily commuters.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>5. Last-Mile Connectivity Solutions<\/strong><\/h3>\n\n\n\n<p>To ensure that commuters can reach their final destinations easily, the BSRP will incorporate&nbsp;<strong>last-mile connectivity solutions<\/strong>. This includes&nbsp;<strong>Public Bicycle Sharing (PBS)<\/strong>&nbsp;and&nbsp;<strong>Shared Micro-Mobility Systems<\/strong>, which will provide options for commuters to travel short distances after disembarking from the train.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>6. Smart Station Hubs<\/strong><\/h3>\n\n\n\n<p>All 57 stations in the project will be transformed into&nbsp;<strong>Smart Station Hubs<\/strong>. These hubs will be multi-storey facilities that support various businesses, including retail, hospitality, and co-working spaces. They will be designed to optimize the use of air space for commercial activities while ensuring easy access to different transport modes.<\/p>\n\n\n\n<p><strong>Also read:<mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\"> <\/mark><a href=\"https:\/\/bigproperty.in\/blog\/\/bengaluru-twin-tube-tunnels-latest-insights-cost-major-corridors-2024\/\"><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">Bengaluru Twin Tube Tunnels: Latest Insights, Cost &amp; Major Corridors 2024<\/mark><\/a><\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Bengaluru_SubUrban_Rail_Automated_Fare_Collection_SystemAFC\"><\/span><strong>Bengaluru SubUrban Rail Automated Fare Collection System(AFC):<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Overview of the Automated Fare Collection System<\/strong><\/h3>\n\n\n\n<p>The AFC system is a modern solution that automates the ticketing process for public transportation, making it more efficient and user-friendly. It comprises several key components that work together to facilitate seamless fare collection.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Key_Components_of_the_AFC_System\"><\/span><strong>Key Components of the AFC System<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Automatic Gate Machines (AGM)<\/strong>: These gates will allow passengers to enter and exit the station by validating their tickets or smart cards. The gates will open automatically for valid entries, ensuring smooth passenger flow, especially during peak hours.<\/li>\n\n\n\n<li><strong>Ticket Vending Machines (TVM)<\/strong>: These self-service machines will enable passengers to purchase tickets or top-up their smart cards. They will accept various payment methods, including cash, cards, and mobile payments, making the ticket purchasing process convenient.<\/li>\n\n\n\n<li><strong>Ticket Checking Machines (TCM)<\/strong>: Positioned at entry and exit points, these machines will validate the tickets or smart cards. They will ensure that passengers have paid the correct fare before allowing access to the platform.<\/li>\n\n\n\n<li><strong>Mobile Ticketing<\/strong>: The AFC system will support mobile ticketing options, allowing passengers to purchase and store tickets on their smartphones. This feature will promote contactless travel and reduce the need for physical tickets.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"How_the_AFC_System_Works\"><\/span><strong>How the AFC System Works<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Purchase of Tickets<\/strong>: Passengers can buy tickets through TVMs or mobile applications. The system will support various payment methods, including contactless options like Near Field Communication (NFC) and EMV (Europay, MasterCard, and Visa) cards.<\/li>\n\n\n\n<li><strong>Entry to the Station<\/strong>: Upon arriving at the station, passengers will approach the automatic gates. They will tap their smart cards or scan QR codes at the gate. The AFC system will validate the ticket against the centralized database, checking for sufficient balance or validity.<\/li>\n\n\n\n<li><strong>Exit from the Station<\/strong>: After completing their journey, passengers will again use the automatic gates to exit. The system will calculate the fare based on the entry and exit points, deducting the appropriate amount from the passenger&#8217;s balance.<\/li>\n\n\n\n<li><strong>Real-Time Data Collection<\/strong>: The AFC system will continuously collect and transmit data regarding passenger flow and fare collection to a central system. This data will be used for analytics, helping transport authorities optimize operations and improve service delivery.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Benefits_of_the_AFC_System\"><\/span><strong>Benefits of the AFC System<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Reduced Queues<\/strong>: The automated nature of the fare collection process will minimize wait times at stations, especially during peak hours, allowing for a smoother commuter experience.<\/li>\n\n\n\n<li><strong>Enhanced Security<\/strong>: The AFC system will incorporate security features such as encryption for payment transactions, ensuring safe and secure fare collection.<\/li>\n\n\n\n<li><strong>Integration with Other Transport Modes<\/strong>: The AFC system is designed to integrate with other public transport systems, enabling a unified ticketing experience across different modes of transport, such as buses and metro services.<\/li>\n\n\n\n<li><strong>User-Friendly Experience<\/strong>: With options for mobile ticketing and self-service machines, the AFC system aims to provide a more convenient and accessible fare collection method for all passengers.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Frequently Asked Questions:<\/strong><\/h3>\n\n\n\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-1726307362933\"><strong class=\"schema-faq-question\">1.\u00a0<strong>What is the Bengaluru Suburban Rail Project?<\/strong><\/strong> <p class=\"schema-faq-answer\">The Bengaluru Suburban Rail Project (BSRP) is an infrastructure initiative aimed at developing a commuter rail network in the Bangalore Metropolitan Region to alleviate traffic congestion and improve public transportation efficiency.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1726307372153\"><strong class=\"schema-faq-question\">2.\u00a0<strong>How long is the BSRP, and how many stations will it have?<\/strong><\/strong> <p class=\"schema-faq-answer\">The BSRP will span approximately\u00a0<strong>149.348 km<\/strong>\u00a0and will feature a total of\u00a0<strong>64 stations<\/strong>\u00a0across four main corridors.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1726307386756\"><strong class=\"schema-faq-question\">3.\u00a0<strong>What are the four corridors of the BSRP?<\/strong><\/strong> <p class=\"schema-faq-answer\">The four corridors are:<strong>Sampige Line<\/strong>: KSR Bengaluru \u2013 Yelahanka \u2013 Devanahalli<br\/><strong>Mallige Line<\/strong>: Baiyyappanahalli Terminal \u2013 Chikkabanavara<br\/><strong>Parijaata Line<\/strong>: Kengeri \u2013 Whitefield<br\/><strong>Kanaka Line<\/strong>: Heelalige \u2013 Rajanukunte<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1726307407274\"><strong class=\"schema-faq-question\">4. <strong>How will the automated fare collection system work?<\/strong><\/strong> <p class=\"schema-faq-answer\">The automated fare collection system will include ticket vending machines, automatic gate machines, and mobile ticketing options to streamline the ticketing process, reduce queues, and enhance the overall commuter experience.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1726307455539\"><strong class=\"schema-faq-question\">5. <strong>When is the expected completion date for the BSRP?<\/strong><\/strong> <p class=\"schema-faq-answer\">The entire project is targeted for completion by\u00a0<strong>December 2027<\/strong>, with the first two corridors expected to be operational by\u00a0<strong>December 2026<\/strong>.<\/p> <\/div> <\/div>\n\n\n\n<div class=\"wp-block-buttons has-custom-font-size has-medium-font-size is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-vivid-red-background-color has-background wp-element-button\" href=\"https:\/\/whatsapp.com\/channel\/0029VaAUFkA9sBIBNO1s1u1V\"><strong><em> WhatsApp channel<\/em><\/strong><\/a><\/div>\n\n\n\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-white-color has-vivid-green-cyan-background-color has-text-color has-background has-link-color wp-element-button\" href=\"https:\/\/play.google.com\/store\/apps\/details?id=bigproperty.in&amp;pcampaignid=web_share\"><strong><em>Download our App<\/em><\/strong><\/a><\/div>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Suggested_Articles\"><\/span><strong>Suggested Articles:<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><a href=\"https:\/\/bigproperty.in\/blog\/\/bengaluru-twin-tube-tunnels-latest-insights-cost-major-corridors-2024\/\">Bengaluru Twin Tube Tunnels: Latest Insights, Cost &amp; Major Corridors 2024<\/a><\/p>\n\n\n\n<p><a href=\"https:\/\/bigproperty.in\/blog\/\/bengaluru-skydeck-project-a-comprehensive-guide-to-the-250-meter-tower\/\">17 Elevated Corridor Bangalore : A Comprehensive Guide to the projec<\/a><\/p>\n\n\n\n<p><a href=\"https:\/\/bigproperty.in\/blog\/\/bengaluru-double-decker-flyover-stations-route-and-latest-news\/\">Bengaluru Double Decker Flyover: Stations, Route and Latest news<\/a><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Bengaluru Suburban Rail Project (BSRP) is a transformative infrastructure initiative aimed at revolutionizing public transport in the bustling city of Bengaluru, India. This ambitious project, which has been in the planning stages since 1983, aims to provide a reliable and efficient commuter rail system that connects the city with its suburbs, significantly easing traffic [&hellip;]<\/p>\n","protected":false},"author":14,"featured_media":18952,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2829,7333],"tags":[10708,10707,10711,10710,10714,10712,10709,10713],"class_list":{"0":"post-18947","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-bangalore","8":"category-city-news","9":"tag-bengaluru-rail-project","10":"tag-bengaluru-suburban-rail","11":"tag-bengaluru-suburban-rail-automated-fare-collection","12":"tag-bengaluru-suburban-rail-project-completion-timeline","13":"tag-bengaluru-suburban-rail-project-corridors","14":"tag-bengaluru-suburban-rail-project-route-map","15":"tag-bengaluru-suburban-rail-project-station-list","16":"tag-bengaluru-suburban-rail-project-status"},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Bengaluru Suburban Rail Project: Stations, Corridors,Timeline<\/title>\n<meta name=\"description\" content=\"Bengaluru Suburban Rail Project, including its corridors, stations, funding, and the impact construction progress, funding sources,\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Bengaluru Suburban Rail Project: Stations, Corridors,Timeline\" \/>\n<meta property=\"og:description\" content=\"Bengaluru Suburban Rail Project, including its corridors, stations, funding, and the impact construction progress, funding sources,\" \/>\n<meta property=\"og:url\" content=\"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/\" \/>\n<meta property=\"og:site_name\" content=\"indias Real estate latest News Updates\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/bigpropertyofficial\/\" \/>\n<meta property=\"article:published_time\" content=\"2024-09-14T10:42:12+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-09-14T10:42:13+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/09\/Bengaluru-SubUrban-Rial-project.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"628\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"naveen kumar\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\\\/\"},\"author\":{\"name\":\"naveen kumar\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#\\\/schema\\\/person\\\/6961956d5ce4bdd0d29261cab0092595\"},\"headline\":\"Bengaluru SubUrban Rail Project: Complete Guide to Stations, Corridors &amp; more\",\"datePublished\":\"2024-09-14T10:42:12+00:00\",\"dateModified\":\"2024-09-14T10:42:13+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\\\/\"},\"wordCount\":1989,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Bengaluru-SubUrban-Rial-project.png\",\"keywords\":[\"Bengaluru rail project\",\"Bengaluru Suburban Rail\",\"Bengaluru Suburban Rail automated fare collection\",\"Bengaluru Suburban Rail Project completion timeline\",\"Bengaluru Suburban Rail project corridors\",\"Bengaluru Suburban Rail project route map\",\"Bengaluru Suburban Rail Project station list\",\"Bengaluru Suburban Rail project status\"],\"articleSection\":[\"Bangalore\",\"city news\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\\\/#respond\"]}]},{\"@type\":[\"WebPage\",\"FAQPage\"],\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\\\/\",\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\\\/\",\"name\":\"Bengaluru Suburban Rail Project: Stations, Corridors,Timeline\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Bengaluru-SubUrban-Rial-project.png\",\"datePublished\":\"2024-09-14T10:42:12+00:00\",\"dateModified\":\"2024-09-14T10:42:13+00:00\",\"description\":\"Bengaluru Suburban Rail Project, including its corridors, stations, funding, and the impact construction progress, funding sources,\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\\\/#breadcrumb\"},\"mainEntity\":[{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\\\/#faq-question-1726307362933\"},{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\\\/#faq-question-1726307372153\"},{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\\\/#faq-question-1726307386756\"},{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\\\/#faq-question-1726307407274\"},{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\\\/#faq-question-1726307455539\"}],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\\\/#primaryimage\",\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Bengaluru-SubUrban-Rial-project.png\",\"contentUrl\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Bengaluru-SubUrban-Rial-project.png\",\"width\":1200,\"height\":628},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Bengaluru SubUrban Rail Project: Complete Guide to Stations, Corridors &amp; more\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/\",\"name\":\"India's Real Estate Property Site Buy Sell rent properties portal\",\"description\":\"real estate news updates property portal\",\"publisher\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#organization\",\"name\":\"BIG PROPERTY\",\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/10\\\/BIG-PROPERTY-designed-by-sbvrgroups.in-fotter.png\",\"contentUrl\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/10\\\/BIG-PROPERTY-designed-by-sbvrgroups.in-fotter.png\",\"width\":138,\"height\":50,\"caption\":\"BIG PROPERTY\"},\"image\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/bigpropertyofficial\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#\\\/schema\\\/person\\\/6961956d5ce4bdd0d29261cab0092595\",\"name\":\"naveen kumar\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/litespeed\\\/avatar\\\/001703a6f3e9c492911002baf4ba2f0c.jpg?ver=1776483266\",\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/litespeed\\\/avatar\\\/001703a6f3e9c492911002baf4ba2f0c.jpg?ver=1776483266\",\"contentUrl\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/litespeed\\\/avatar\\\/001703a6f3e9c492911002baf4ba2f0c.jpg?ver=1776483266\",\"caption\":\"naveen kumar\"},\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/author\\\/naveen\\\/\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\\\/#faq-question-1726307362933\",\"position\":1,\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\\\/#faq-question-1726307362933\",\"name\":\"1.\u00a0What is the Bengaluru Suburban Rail Project?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The Bengaluru Suburban Rail Project (BSRP) is an infrastructure initiative aimed at developing a commuter rail network in the Bangalore Metropolitan Region to alleviate traffic congestion and improve public transportation efficiency.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\\\/#faq-question-1726307372153\",\"position\":2,\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\\\/#faq-question-1726307372153\",\"name\":\"2.\u00a0How long is the BSRP, and how many stations will it have?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The BSRP will span approximately\u00a0<strong>149.348 km<\\\/strong>\u00a0and will feature a total of\u00a0<strong>64 stations<\\\/strong>\u00a0across four main corridors.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\\\/#faq-question-1726307386756\",\"position\":3,\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\\\/#faq-question-1726307386756\",\"name\":\"3.\u00a0What are the four corridors of the BSRP?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The four corridors are:<strong>Sampige Line<\\\/strong>: KSR Bengaluru \u2013 Yelahanka \u2013 Devanahalli<br\\\/><strong>Mallige Line<\\\/strong>: Baiyyappanahalli Terminal \u2013 Chikkabanavara<br\\\/><strong>Parijaata Line<\\\/strong>: Kengeri \u2013 Whitefield<br\\\/><strong>Kanaka Line<\\\/strong>: Heelalige \u2013 Rajanukunte\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\\\/#faq-question-1726307407274\",\"position\":4,\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\\\/#faq-question-1726307407274\",\"name\":\"4. How will the automated fare collection system work?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The automated fare collection system will include ticket vending machines, automatic gate machines, and mobile ticketing options to streamline the ticketing process, reduce queues, and enhance the overall commuter experience.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\\\/#faq-question-1726307455539\",\"position\":5,\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\\\/#faq-question-1726307455539\",\"name\":\"5. When is the expected completion date for the BSRP?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The entire project is targeted for completion by\u00a0<strong>December 2027<\\\/strong>, with the first two corridors expected to be operational by\u00a0<strong>December 2026<\\\/strong>.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Bengaluru Suburban Rail Project: Stations, Corridors,Timeline","description":"Bengaluru Suburban Rail Project, including its corridors, stations, funding, and the impact construction progress, funding sources,","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/","og_locale":"en_US","og_type":"article","og_title":"Bengaluru Suburban Rail Project: Stations, Corridors,Timeline","og_description":"Bengaluru Suburban Rail Project, including its corridors, stations, funding, and the impact construction progress, funding sources,","og_url":"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/","og_site_name":"indias Real estate latest News Updates","article_publisher":"https:\/\/www.facebook.com\/bigpropertyofficial\/","article_published_time":"2024-09-14T10:42:12+00:00","article_modified_time":"2024-09-14T10:42:13+00:00","og_image":[{"width":1200,"height":628,"url":"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/09\/Bengaluru-SubUrban-Rial-project.png","type":"image\/png"}],"author":"naveen kumar","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#article","isPartOf":{"@id":"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/"},"author":{"name":"naveen kumar","@id":"https:\/\/bigproperty.in\/blog\/#\/schema\/person\/6961956d5ce4bdd0d29261cab0092595"},"headline":"Bengaluru SubUrban Rail Project: Complete Guide to Stations, Corridors &amp; more","datePublished":"2024-09-14T10:42:12+00:00","dateModified":"2024-09-14T10:42:13+00:00","mainEntityOfPage":{"@id":"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/"},"wordCount":1989,"commentCount":0,"publisher":{"@id":"https:\/\/bigproperty.in\/blog\/#organization"},"image":{"@id":"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#primaryimage"},"thumbnailUrl":"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/09\/Bengaluru-SubUrban-Rial-project.png","keywords":["Bengaluru rail project","Bengaluru Suburban Rail","Bengaluru Suburban Rail automated fare collection","Bengaluru Suburban Rail Project completion timeline","Bengaluru Suburban Rail project corridors","Bengaluru Suburban Rail project route map","Bengaluru Suburban Rail Project station list","Bengaluru Suburban Rail project status"],"articleSection":["Bangalore","city news"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#respond"]}]},{"@type":["WebPage","FAQPage"],"@id":"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/","url":"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/","name":"Bengaluru Suburban Rail Project: Stations, Corridors,Timeline","isPartOf":{"@id":"https:\/\/bigproperty.in\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#primaryimage"},"image":{"@id":"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#primaryimage"},"thumbnailUrl":"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/09\/Bengaluru-SubUrban-Rial-project.png","datePublished":"2024-09-14T10:42:12+00:00","dateModified":"2024-09-14T10:42:13+00:00","description":"Bengaluru Suburban Rail Project, including its corridors, stations, funding, and the impact construction progress, funding sources,","breadcrumb":{"@id":"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#breadcrumb"},"mainEntity":[{"@id":"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#faq-question-1726307362933"},{"@id":"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#faq-question-1726307372153"},{"@id":"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#faq-question-1726307386756"},{"@id":"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#faq-question-1726307407274"},{"@id":"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#faq-question-1726307455539"}],"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#primaryimage","url":"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/09\/Bengaluru-SubUrban-Rial-project.png","contentUrl":"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/09\/Bengaluru-SubUrban-Rial-project.png","width":1200,"height":628},{"@type":"BreadcrumbList","@id":"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/bigproperty.in\/blog\/"},{"@type":"ListItem","position":2,"name":"Bengaluru SubUrban Rail Project: Complete Guide to Stations, Corridors &amp; more"}]},{"@type":"WebSite","@id":"https:\/\/bigproperty.in\/blog\/#website","url":"https:\/\/bigproperty.in\/blog\/","name":"India's Real Estate Property Site Buy Sell rent properties portal","description":"real estate news updates property portal","publisher":{"@id":"https:\/\/bigproperty.in\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/bigproperty.in\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/bigproperty.in\/blog\/#organization","name":"BIG PROPERTY","url":"https:\/\/bigproperty.in\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/bigproperty.in\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2020\/10\/BIG-PROPERTY-designed-by-sbvrgroups.in-fotter.png","contentUrl":"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2020\/10\/BIG-PROPERTY-designed-by-sbvrgroups.in-fotter.png","width":138,"height":50,"caption":"BIG PROPERTY"},"image":{"@id":"https:\/\/bigproperty.in\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/bigpropertyofficial\/"]},{"@type":"Person","@id":"https:\/\/bigproperty.in\/blog\/#\/schema\/person\/6961956d5ce4bdd0d29261cab0092595","name":"naveen kumar","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/bigproperty.in\/blog\/wp-content\/litespeed\/avatar\/001703a6f3e9c492911002baf4ba2f0c.jpg?ver=1776483266","url":"https:\/\/bigproperty.in\/blog\/wp-content\/litespeed\/avatar\/001703a6f3e9c492911002baf4ba2f0c.jpg?ver=1776483266","contentUrl":"https:\/\/bigproperty.in\/blog\/wp-content\/litespeed\/avatar\/001703a6f3e9c492911002baf4ba2f0c.jpg?ver=1776483266","caption":"naveen kumar"},"url":"https:\/\/bigproperty.in\/blog\/author\/naveen\/"},{"@type":"Question","@id":"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#faq-question-1726307362933","position":1,"url":"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#faq-question-1726307362933","name":"1.\u00a0What is the Bengaluru Suburban Rail Project?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The Bengaluru Suburban Rail Project (BSRP) is an infrastructure initiative aimed at developing a commuter rail network in the Bangalore Metropolitan Region to alleviate traffic congestion and improve public transportation efficiency.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#faq-question-1726307372153","position":2,"url":"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#faq-question-1726307372153","name":"2.\u00a0How long is the BSRP, and how many stations will it have?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The BSRP will span approximately\u00a0<strong>149.348 km<\/strong>\u00a0and will feature a total of\u00a0<strong>64 stations<\/strong>\u00a0across four main corridors.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#faq-question-1726307386756","position":3,"url":"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#faq-question-1726307386756","name":"3.\u00a0What are the four corridors of the BSRP?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The four corridors are:<strong>Sampige Line<\/strong>: KSR Bengaluru \u2013 Yelahanka \u2013 Devanahalli<br\/><strong>Mallige Line<\/strong>: Baiyyappanahalli Terminal \u2013 Chikkabanavara<br\/><strong>Parijaata Line<\/strong>: Kengeri \u2013 Whitefield<br\/><strong>Kanaka Line<\/strong>: Heelalige \u2013 Rajanukunte","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#faq-question-1726307407274","position":4,"url":"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#faq-question-1726307407274","name":"4. How will the automated fare collection system work?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The automated fare collection system will include ticket vending machines, automatic gate machines, and mobile ticketing options to streamline the ticketing process, reduce queues, and enhance the overall commuter experience.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#faq-question-1726307455539","position":5,"url":"https:\/\/bigproperty.in\/blog\/bengaluru-suburban-rail-project-complete-guide-to-stations-corridors-more\/#faq-question-1726307455539","name":"5. When is the expected completion date for the BSRP?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The entire project is targeted for completion by\u00a0<strong>December 2027<\/strong>, with the first two corridors expected to be operational by\u00a0<strong>December 2026<\/strong>.","inLanguage":"en-US"},"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/posts\/18947","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/comments?post=18947"}],"version-history":[{"count":3,"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/posts\/18947\/revisions"}],"predecessor-version":[{"id":18954,"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/posts\/18947\/revisions\/18954"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/media\/18952"}],"wp:attachment":[{"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/media?parent=18947"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/categories?post=18947"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/tags?post=18947"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}