{"id":17635,"date":"2024-08-05T13:07:01","date_gmt":"2024-08-05T07:37:01","guid":{"rendered":"https:\/\/blog.bigproperty.in\/?p=17635"},"modified":"2024-08-05T13:12:25","modified_gmt":"2024-08-05T07:42:25","slug":"bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact","status":"publish","type":"post","link":"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/","title":{"rendered":"Bangalore Metro Phase-3: Exploring the New Elevated Lines and Their Impact"},"content":{"rendered":"<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_81 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #000000;color:#000000\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #000000;color:#000000\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#Bangalore_Metro_Phase_3_Project\" >Bangalore Metro Phase 3 Project:<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#Project_Development_Timeline\" >Project Development Timeline<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#Construction_Schedule\" >Construction Schedule<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#Cost_and_Deadline\" >Cost and Deadline<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#Phase_3_Lines_Finalized\" >Phase 3 Lines (Finalized)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#Silver_Line_Kadabagare_%E2%80%93_Hosahalli\" >Silver Line: Kadabagare \u2013 Hosahalli<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#Namma_Metro_Phase-3_Route_Map\" >Namma Metro Phase-3 Route Map:<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#The_finalized_Phase_3_lines\" >The finalized Phase 3 lines:<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#Project_Scope_and_Coverage\" >Project Scope and Coverage<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#First_Corridor\" >First Corridor:<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#Second_Corridor\" >Second Corridor:<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#Government_Initiatives_and_Approvals\" >Government Initiatives and Approvals<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#Bengaluru_Metro_Phase-3_Detailed_Overview\" >Bengaluru Metro Phase-3: Detailed Overview<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#Project_Timeline_and_Cost\" >Project Timeline and Cost<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#Current_Metro_Network\" >Current Metro Network<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#Phase-3_Details\" >Phase-3 Details<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#Project_History\" >Project History:<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#Expected_Construction_Timeline\" >Expected Construction Timeline:<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-19\" href=\"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#Silver_Line_Kadabagare_%E2%80%93_Hosahalli-2\" >Silver Line: Kadabagare \u2013 Hosahalli<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-20\" href=\"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#Old_Plans_Lines_Not_Being_Built\" >Old Plans (Lines Not Being Built)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-21\" href=\"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#The_old_metro_line_proposals_that_are_not_currently_being_built\" >The old metro line proposals that are not currently being built:<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-22\" href=\"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#Phase_3_Route_Maps_and_Tenders\" >Phase 3 Route Maps and Tenders<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-23\" href=\"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#Current_Status_and_Future_Prospects\" >Current Status and Future Prospects<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-24\" href=\"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#Project_Financing\" >Project Financing:<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-25\" href=\"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#Conclusion\" >Conclusion:<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-26\" href=\"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#Frequently_Asked_Questions\" >Frequently Asked Questions:<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-27\" href=\"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#Suggested_Articles\" >Suggested Articles:<\/a><\/li><\/ul><\/nav><\/div>\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Bangalore_Metro_Phase_3_Project\"><\/span><strong>Bangalore Metro Phase 3 Project<\/strong>:<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong>Bangalore Metro Phase 3 <\/strong>initiative is in the proposal stage, featuring two planned elevated routes that span a total of 44.65 kilometers across western Bengaluru, and Karnataka. This project is pending final approval from the Central Government Cabinet.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Project_Development_Timeline\"><\/span><strong>Project Development Timeline<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The Phase 3 project has been under consideration since 2015, with a comprehensive analysis of 105.55 kilometers of potential routes. Feasibility studies, conducted by RITES and Bangalore Metro Rail Corporation Limited (BMRCL) in 2016, laid the groundwork. The Karnataka state government approved the development of the detailed project report (DPR) in February 2018, and RITES was tasked with the project in July 2020.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Construction_Schedule\"><\/span><strong>Construction Schedule<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The construction of Phase 3, encompassing two main lines, is projected to commence in 2026 and completed by the early 2030s. An additional 37-kilometer corridor connecting Hebbal and Sarjapura is planned under Phase 3A.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Cost_and_Deadline\"><\/span><strong>Cost and Deadline<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Estimated Cost:<\/strong> \u20b915,611 crore (pending final route approval)<\/li>\n\n\n\n<li><strong>Current Deadline:<\/strong> Not finalized<\/li>\n\n\n\n<li><strong>Projected Completion:<\/strong> 2032, contingent on Central Government approval in 2024<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Phase_3_Lines_Finalized\"><\/span><strong>Phase 3 Lines (Finalized)<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong>Orange Line: JP Nagar Fourth Phase &#8211; Kempapura<\/strong><\/p>\n\n\n\n<p><strong>Length:<\/strong> 32.15 km<\/p>\n\n\n\n<p><strong>Type:<\/strong> Elevated<\/p>\n\n\n\n<p><strong>Number of Stations:<\/strong> 22<\/p>\n\n\n\n<p><strong>Stations:<\/strong> Kempapura, Hebbal, Nagashetty Halli, BEL Circle, Muthyalanagar, Peenya, Kanteerava Nagar, Freedom Fighter\u2019s Colony, Chowdeshwari Nagar, Sumanahalli Cross, BDA Complex Nagarbhavi, Papireddy Palya, Vinayaka Layout, Nagarbhavi Circle, Mysuru Road, Dwaraka Nagar, Hosakerehalli, Kamakya Junction, Kadirenahalli, JP Nagar, JP Nagar 5th Phase, JP Nagar 4th Phase<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Silver_Line_Kadabagare_%E2%80%93_Hosahalli\"><\/span><strong>Silver Line: Kadabagare \u2013 Hosahalli<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong>Length:<\/strong> 12.5 km<\/p>\n\n\n\n<p><strong>Type:<\/strong> Elevated<\/p>\n\n\n\n<p><strong>Number of Stations:<\/strong> 9<\/p>\n\n\n\n<p><strong>Stations:<\/strong> Kadabagare, Kamath Layout, Byadarahalli, Herohalli, Anjana Nagar, Sumanahalli Cross, Kamakshi Palya, KHB Colony, Hosahalli<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Namma_Metro_Phase-3_Route_Map\"><\/span><strong>Namma Metro Phase-3 Route Map:<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong><img decoding=\"async\" src=\"https:\/\/lh7-rt.googleusercontent.com\/docsz\/AD_4nXdPtJXHK0C8ZzEbIaI9VQzeyT40Of6dpV_FEk5xsYkkiGeBm49kmE1G-i3hB5Twhdh4Yg0grxdIMEL5yilXOsWA1C3aMs_NPma2M2vqwMW7CCWGNtMHNUa6Vk0GM3NRExrm53iWmunv_M5IWVZOOTpSEAEe?key=TX_mKsBuqtOV-E_Y1E1h1g\" style=\"width: 9000px\"><\/strong><\/p>\n\n\n\n<p class=\"has-small-font-size\">Source: Themetrorailguy<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<p><strong>Also Read: <a href=\"https:\/\/bigproperty.in\/blog\/\/bangalore-metro-phase-2-complete-guide-to-routes-costs-stations-expansion\/\"><mark style=\"background-color:#ffffff\" class=\"has-inline-color has-vivid-red-color\">Bangalore Metro Phase 2: Complete Guide to Routes, Costs, stations &amp; Expansion<\/mark><\/a><\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"The_finalized_Phase_3_lines\"><\/span><strong> The finalized Phase 3 lines:<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th><strong>Line<\/strong><\/th><th><strong>Length<\/strong><\/th><th><strong>Type<\/strong><\/th><th><strong>Number of Stations<\/strong><\/th><th><strong>Stations<\/strong><\/th><\/tr><\/thead><tbody><tr><td><strong>Orange Line<\/strong><\/td><td>32.15 km<\/td><td>Elevated<\/td><td>22<\/td><td>Kempapura, Hebbal, Nagashetty Halli, BEL Circle, Muthyalanagar, Peenya, Kanteerava Nagar, Freedom Fighter\u2019s Colony, Chowdeshwari Nagar, Sumanahalli Cross, BDA Complex Nagarbhavi, Papireddy Palya, Vinayaka Layout, Nagarbhavi Circle, Mysuru Road, Dwaraka Nagar, Hosakerehalli, Kamakya Junction, Kadirenahalli, JP Nagar, JP Nagar 5th Phase, JP Nagar 4th Phase<\/td><\/tr><tr><td><strong>Silver Line<\/strong><\/td><td>12.5 km<\/td><td>Elevated<\/td><td>9<\/td><td>Kadabagare, Kamath Layout, Byadarahalli, Herohalli, Anjana Nagar, Sumanahalli Cross, Kamakshi Palya, KHB Colony, Hosahalli<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Project_Scope_and_Coverage\"><\/span><strong>Project Scope and Coverage<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong>Total Length and Stations<\/strong><\/p>\n\n\n\n<p><strong>Total Length:<\/strong> 44.65 km of elevated corridors.<\/p>\n\n\n\n<p><strong>Total Stations:<\/strong> 31 metro stations.<\/p>\n\n\n\n<p><strong>Corridors:<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"First_Corridor\"><\/span><strong>First Corridor:<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong>Length:<\/strong> 32.15 km along the western side of Outer Ring Road.<\/p>\n\n\n\n<p><strong>Route:<\/strong> Connects J P Nagar&#8217;s fourth phase to Kempapura.<\/p>\n\n\n\n<p><strong>Stations:<\/strong> 22 stations that will link to the Airport Line.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Second_Corridor\"><\/span><strong>Second Corridor:<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong>Length:<\/strong> 12.5 km from Hosahalli to Kadabgere on Magadi Road.<\/p>\n\n\n\n<p><strong>Stations:<\/strong> 9 stations.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Government_Initiatives_and_Approvals\"><\/span><strong>Government Initiatives and Approvals<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The state government has empowered the <strong><a href=\"https:\/\/bigproperty.in\/blog\/\/bangalore-metro-route-gree-pink-yellow-blue-purple-and-orange-line-timings-stations-2024\/\"><mark style=\"background-color:#ffffff\" class=\"has-inline-color has-luminous-vivid-orange-color\">Bangalore Metro<\/mark><\/a> Rail<\/strong> Corporation Limited (BMRCL) to commence the tendering process for the project. However, a new proposal to integrate double-decker flyovers into all upcoming Metro projects is causing some delays.<\/p>\n\n\n\n<p>A senior BMRCL official noted that the Public Investment Board&#8217;s previous approval was followed by the Finance Ministry&#8217;s consent. Recently, the Centre&#8217;s Urban Development Department presented a comprehensive overview of Phase 3 to the Prime Minister&#8217;s Office to expedite cabinet clearance.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Bengaluru_Metro_Phase-3_Detailed_Overview\"><\/span><strong>Bengaluru Metro Phase-3: Detailed Overview<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th><strong>Aspect<\/strong><\/th><th><strong>Details<\/strong><\/th><\/tr><\/thead><tbody><tr><td><strong>Project Approval<\/strong><\/td><td>Green light given by Union Finance Ministry. Final endorsement pending from the cabinet.<\/td><\/tr><tr><td><strong>Total Length<\/strong><\/td><td>44.65 km of elevated corridors.<\/td><\/tr><tr><td><strong>Total Stations<\/strong><\/td><td>31 metro stations.<\/td><\/tr><tr><td><strong>Corridors<\/strong><\/td><td>1. <strong>First Corridor<\/strong>: 32.15 km, J P Nagar Fourth Phase to Kempapura, 22 stations, connecting to Airport Line.<\/td><\/tr><tr><td><\/td><td>2. <strong>Second Corridor<\/strong>: 12.5 km, Hosahalli to Kadabgere, 9 stations.<\/td><\/tr><tr><td><strong>Government Initiatives<\/strong><\/td><td>Tenders and updates are available on BMRCL website.<\/td><\/tr><tr><td><strong>Project Timeline<\/strong><\/td><td>Construction is expected to start in 2026 and complete by the early 2030s.<\/td><\/tr><tr><td><strong>Passenger Capacity<\/strong><\/td><td>Expected to carry 9.12 lakh passengers daily by 2051.<\/td><\/tr><tr><td><strong>Project Cost<\/strong><\/td><td>BMRCL is authorized to start tendering. New proposal for double-decker flyovers causing delays. PIB and Finance Ministry approvals secured.<\/td><\/tr><tr><td><strong>Current Metro Network<\/strong><\/td><td>Spans 73.81 km, second-longest in India after Delhi Metro. Operational corridors: East-West and North-South.<\/td><\/tr><tr><td><strong>Phase-3 Details<\/strong><\/td><td>The revised cost of Rs 15,611 crore. Initial approval at Rs 16,328 crore, reduced following revisions.<\/td><\/tr><tr><td><strong>Project History<\/strong><\/td><td>&#8211; Feasibility studies by RITES and BMRCL in 2016.<\/td><\/tr><tr><td><\/td><td>Spans 73.81 km, the second-longest in India after Delhi Metro. Operational corridors: East-West and North-South.<\/td><\/tr><tr><td><strong>Phase 3A<\/strong><\/td><td>Additional 37 km corridor connecting Hebbal and Sarjapura.<\/td><\/tr><tr><td><strong>Phase 3 Lines (Finalized)<\/strong><\/td><td><strong>Orange Line<\/strong>: JP Nagar Fourth Phase to Kempapura, 32.15 km, 22 stations.<\/td><\/tr><tr><td><\/td><td><strong>Silver Line<\/strong>: Kadabagare to Hosahalli, 12.5 km, 9 stations.<\/td><\/tr><tr><td><strong>Old Plans (Not Being Built)<\/strong><\/td><td>Carmelaram to Yelahanka (37 km), Marathahalli to Hosakerehalli (21 km), Silkboard to KR Puram \u2013 Hebbal, Nagavara to Airport (23 km).<\/td><\/tr><tr><td><strong>Phase 3 Route Maps and Tenders<\/strong><\/td><td>State government is to bear 80% of the cost.<\/td><\/tr><tr><td><strong>Current Status<\/strong><\/td><td>PIB approval received; awaiting final Cabinet clearance.<\/td><\/tr><tr><td><strong>Project Financing<\/strong><\/td><td>The state government is to bear 80% of the cost.<\/td><\/tr><tr><td><strong>Completion Estimate<\/strong><\/td><td>2032 (if approved by the Central Government in 2024).<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Project_Timeline_and_Cost\"><\/span><strong>Project Timeline and Cost<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong>Deadline:<\/strong><\/p>\n\n\n\n<p><strong>Project Completion:<\/strong> 2028.<\/p>\n\n\n\n<p><strong>Passenger Capacity:<\/strong> Expected to carry an average of 9.12 lakh passengers daily by 2051.<\/p>\n\n\n\n<p><strong>Cost:<\/strong><\/p>\n\n\n\n<p><strong>Revised Cost:<\/strong> Rs 15,611 crore.<\/p>\n\n\n\n<p><strong>Approval Date:<\/strong> Approved by the state government in March 2023.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<p><strong>Also Read: <a href=\"https:\/\/bigproperty.in\/blog\/\/yeshwanthpur-metro-station-in-bangalore-your-ultimate-guide\/\"><mark style=\"background-color:#ffffff\" class=\"has-inline-color has-vivid-red-color\">Yeshwanthpur Metro Station in Bangalore: Your Ultimate Guide<\/mark><\/a><\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Current_Metro_Network\"><\/span><strong>Current Metro Network<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong>Network Coverage:<\/strong><\/p>\n\n\n\n<p><strong>Current Span:<\/strong> 73.81 km, making it India&#8217;s second-longest operational network after Delhi Metro.<\/p>\n\n\n\n<p><strong>Operational Corridors:<\/strong> East-West Corridor and North-South Corridor.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Phase-3_Details\"><\/span><strong>Phase-3 Details<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong>Overview:<\/strong> The<strong> Namma Metro Phase 3<\/strong> project is currently in the proposal stage, awaiting the Central Government Cabinet\u2019s approval. The project includes two elevated routes totaling 44.65 km planned in western <strong>Bengaluru metro phase 3<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Project_History\"><\/span><strong>Project History:<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong>Pre-feasibility and Techno-economic Feasibility Studies:<\/strong> Conducted by RITES and BMRCL in 2016.<\/p>\n\n\n\n<p><strong>State Government Approval:<\/strong> Preparation of the detailed project report (DPR) approved in February 2018, and assigned to RITES in July 2020.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Expected_Construction_Timeline\"><\/span><strong>Expected Construction Timeline:<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong>Start:<\/strong> 2026.<\/p>\n\n\n\n<p><strong>Completion:<\/strong> Early 2030s.<\/p>\n\n\n\n<p><strong>Additional Projects:<\/strong><\/p>\n\n\n\n<p><strong>Phase 3A:<\/strong> A 37 km new corridor connecting Hebbal and Sarjapura.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Phase 3 Lines (Finalized)<\/strong><\/h3>\n\n\n\n<p><strong>Orange Line: JP Nagar Fourth Phase &#8211; Kempapura<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Silver_Line_Kadabagare_%E2%80%93_Hosahalli-2\"><\/span><strong>Silver Line: Kadabagare \u2013 Hosahalli<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong>Length:<\/strong> 12.5 km.<\/p>\n\n\n\n<p><strong>Type:<\/strong> Elevated.<\/p>\n\n\n\n<p><strong>Number of Stations:<\/strong> 9.<\/p>\n\n\n\n<p>Kadabagare, Kamath Layout, Hosahalli, Byadarahalli, Sumanahalli Cross, Anjana Nagar, Kamakshi Palya, and KHB Colony are the names of the stations.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<p><strong>Also Read: <a href=\"https:\/\/bigproperty.in\/blog\/\/bangalore-metro-pink-line-phases-routemap-latest-updates\/\"><mark style=\"background-color:#ffffff\" class=\"has-inline-color has-vivid-red-color\">Bangalore Metro Pink Line: Phases, Routemap &amp; Latest Updates<\/mark><\/a><\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Old_Plans_Lines_Not_Being_Built\"><\/span><strong>Old Plans (Lines Not Being Built)<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Various metro route proposals have been announced over the last decade. These might be included or built in later phases:<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"The_old_metro_line_proposals_that_are_not_currently_being_built\"><\/span><strong>The old metro line proposals that are not currently being built:<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Proposed Line<\/th><th>Length<\/th><\/tr><\/thead><tbody><tr><td>Carmelaram \u2013 Yelahanka<\/td><td>37 km<\/td><\/tr><tr><td>Marathahalli \u2013 Hosakerehalli<\/td><td>21 km<\/td><\/tr><tr><td>Silkboard \u2013 KR Puram \u2013 Hebbal<\/td><td>&#8211;<\/td><\/tr><tr><td>Nagavara \u2013 Airport<\/td><td>23 km<\/td><\/tr><tr><td>JP Nagar to K R Puram via Hebbal<\/td><td>&#8211;<\/td><\/tr><tr><td>Magadi Road Toll Gate to Kadabagere<\/td><td>&#8211;<\/td><\/tr><tr><td>Gottigere to Basavapura<\/td><td>&#8211;<\/td><\/tr><tr><td>RK Hegde Nagar to Aerospace Park<\/td><td>&#8211;<\/td><\/tr><tr><td>Kogilu Cross to Rajanukunte<\/td><td>&#8211;<\/td><\/tr><tr><td>Bommasandra to Attibele<\/td><td>&#8211;<\/td><\/tr><tr><td>Iblur to Carmelaram<\/td><td>&#8211;<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Phase_3_Route_Maps_and_Tenders\"><\/span><strong>Phase 3 Route Maps and Tenders<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>When they become available, Bangalore Metro (BMRCL) Phase 3 tenders can be seen on the BMRCL website. Updates on Phase 3\u2019s progress, tender notices, bidders, and contracts are covered regularly.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Current_Status_and_Future_Prospects\"><\/span><strong>Current Status and Future Prospects<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong>PIB Approval:<\/strong> The Public Investment Board (PIB) has approved the project, which is a major boost to <strong>Bengaluru Metro Phase 3<\/strong>.. This marks a crucial step before the final cabinet approval, expected soon.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Project_Financing\"><\/span><strong>Project Financing:<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>State Government Contribution:<\/strong> The state government has decided to bear 80% of the project cost.<\/li>\n\n\n\n<li><strong>Initial Approval:<\/strong> Approved at Rs 16,328 crore in November 2022, with subsequent revisions lowering the cost.<\/li>\n<\/ul>\n\n\n\n<p><strong>Deadline:<\/strong> The<strong> Namma metro phase 3<\/strong> is expected to carry an average of 9.12 lakh passengers daily by 2051. The PIB is a nodal body under the finance ministry that examines the feasibility of investment plans proposed by various ministries of the Central government.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Conclusion\"><\/span><strong>Conclusion<\/strong>:<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The approval of the Bengaluru <strong>Namma Metro Phase-3<\/strong> project is a pivotal step in enhancing the city&#8217;s urban transit system. With an investment of Rs 15,611 crore, the project will add 44.65 km of elevated corridors and 31 new stations, significantly improving connectivity. The two main corridors will link J P Nagar&#8217;s fourth phase to Kempapura and Hosahalli to Kadabgere, integrating with existing lines.<\/p>\n\n\n\n<p>Despite delays due to new double-decker flyover proposals, the BMRCL has been authorized to begin tendering. Set for completion by 2028, Phase 3 is expected to carry 9.12 lakh passengers daily by 2051, promising to reduce traffic congestion and boost economic growth. This project marks a crucial development in Bengaluru&#8217;s public transportation, aiming to enhance mobility and improve residents&#8217; quality of life.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Frequently_Asked_Questions\"><\/span><strong>Frequently Asked Questions:<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-1722839913150\"><strong class=\"schema-faq-question\">Q1.<strong>What is the total length of Bengaluru Metro Phase-3?<\/strong><\/strong> <p class=\"schema-faq-answer\">The total length of Bengaluru Metro Phase-3 is 44.65 km, covering two elevated corridors.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1722839951749\"><strong class=\"schema-faq-question\">Q2.<strong>How many stations are planned for Bengaluru Metro Phase-3?<\/strong><\/strong> <p class=\"schema-faq-answer\">There are 31 stations planned for Bengaluru Metro Phase-3.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1722839974137\"><strong class=\"schema-faq-question\">Q3.<strong>What are the key corridors in Bangalore metro phase 3?<\/strong><\/strong> <p class=\"schema-faq-answer\">The key corridors are from J P Nagar&#8217;s fourth phase to Kempapura (32.15 km) and from Hosahalli to Kadabgere on Magadi Road (12.5 km).<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1722839995654\"><strong class=\"schema-faq-question\">Q4.<strong>When is Bengaluru Metro Phase-3 expected to be completed?<\/strong><\/strong> <p class=\"schema-faq-answer\">The project is expected to be completed by 2028.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1722840017837\"><strong class=\"schema-faq-question\">Q5.<strong>What is the estimated cost of Bengaluru Metro Phase-3?<\/strong><\/strong> <p class=\"schema-faq-answer\">The estimated cost of Bengaluru Metro Phase-3 is Rs 15,611 crore.<\/p> <\/div> <\/div>\n\n\n\n<div class=\"wp-block-buttons has-custom-font-size has-medium-font-size is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-vivid-red-background-color has-background wp-element-button\" href=\"https:\/\/whatsapp.com\/channel\/0029VaAUFkA9sBIBNO1s1u1V\"><strong><em> WhatsApp channel<\/em><\/strong><\/a><\/div>\n\n\n\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-white-color has-vivid-green-cyan-background-color has-text-color has-background has-link-color wp-element-button\" href=\"https:\/\/play.google.com\/store\/apps\/details?id=bigproperty.in&amp;pcampaignid=web_share\"><strong><em>Download our App<\/em><\/strong><\/a><\/div>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Suggested_Articles\"><\/span><strong>Suggested Articles:<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><a href=\"https:\/\/bigproperty.in\/blog\/\/bangalore-metro-pink-line-phases-routemap-latest-updates\/\">Bangalore Metro Pink Line: Phases, Routemap &amp; Latest Updates<\/a><\/p>\n\n\n\n<p><a href=\"https:\/\/bigproperty.in\/blog\/\/yeshwanthpur-metro-station-in-bangalore-your-ultimate-guide\/\">Yeshwanthpur Metro Station in Bangalore: Your Ultimate Guide<\/a><\/p>\n\n\n\n<p><a href=\"https:\/\/bigproperty.in\/blog\/\/bangalore-metro-phase-2-complete-guide-to-routes-costs-stations-expansion\/\">Bangalore Metro Phase 2: Complete Guide to Routes, Costs, stations &amp; Expansion<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Bangalore Metro Phase 3 Project: Bangalore Metro Phase 3 initiative is in the proposal stage, featuring two planned elevated routes that span a total of 44.65 kilometers across western Bengaluru, and Karnataka. This project is pending final approval from the Central Government Cabinet. Project Development Timeline The Phase 3 project has been under consideration since [&hellip;]<\/p>\n","protected":false},"author":15,"featured_media":17636,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2829,7333],"tags":[9474,9479,9475,9481,9477,9482,9480,9478,9476],"class_list":{"0":"post-17635","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-bangalore","8":"category-city-news","9":"tag-bangalore-metro-phase-3","10":"tag-bengaluru-metro-new-routes","11":"tag-bengaluru-metro-phase-3","12":"tag-bengaluru-metro-phase-3-cost","13":"tag-bengaluru-metro-phase-3-details","14":"tag-bengaluru-metro-phase-3-stations","15":"tag-bengaluru-metro-phase-3-updates","16":"tag-elevated-corridors-bengaluru-metro","17":"tag-namma-metro-phase-3"},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Bangalore metro phase 3: Key Details, Routes, and Latest Updates<\/title>\n<meta name=\"description\" content=\"Bangalore metro phase 3 project: Key details, timeline, and impact of the new 44.65 km network. Discover updates on the Orange,Silver Lines\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Bangalore metro phase 3: Key Details, Routes, and Latest Updates\" \/>\n<meta property=\"og:description\" content=\"Bangalore metro phase 3 project: Key details, timeline, and impact of the new 44.65 km network. Discover updates on the Orange,Silver Lines\" \/>\n<meta property=\"og:url\" content=\"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/\" \/>\n<meta property=\"og:site_name\" content=\"indias Real estate latest News Updates\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/bigpropertyofficial\/\" \/>\n<meta property=\"article:published_time\" content=\"2024-08-05T07:37:01+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-08-05T07:42:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/08\/Bangalore-Metro-Phase-3.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"628\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"rakesh\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\\\/\"},\"author\":{\"name\":\"rakesh\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#\\\/schema\\\/person\\\/64588693152bdd3de9f28586ea69e516\"},\"headline\":\"Bangalore Metro Phase-3: Exploring the New Elevated Lines and Their Impact\",\"datePublished\":\"2024-08-05T07:37:01+00:00\",\"dateModified\":\"2024-08-05T07:42:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\\\/\"},\"wordCount\":1472,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/uploads\\\/2024\\\/08\\\/Bangalore-Metro-Phase-3.png\",\"keywords\":[\"Bangalore metro phase 3\",\"Bengaluru Metro new routes\",\"Bengaluru metro phase 3\",\"Bengaluru Metro Phase-3 cost\",\"Bengaluru Metro Phase-3 details\",\"Bengaluru Metro Phase-3 stations\",\"Bengaluru Metro Phase-3 updates\",\"Elevated corridors Bengaluru Metro\",\"Namma Metro Phase 3\"],\"articleSection\":[\"Bangalore\",\"city news\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\\\/#respond\"]}]},{\"@type\":[\"WebPage\",\"FAQPage\"],\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\\\/\",\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\\\/\",\"name\":\"Bangalore metro phase 3: Key Details, Routes, and Latest Updates\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/uploads\\\/2024\\\/08\\\/Bangalore-Metro-Phase-3.png\",\"datePublished\":\"2024-08-05T07:37:01+00:00\",\"dateModified\":\"2024-08-05T07:42:25+00:00\",\"description\":\"Bangalore metro phase 3 project: Key details, timeline, and impact of the new 44.65 km network. Discover updates on the Orange,Silver Lines\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\\\/#breadcrumb\"},\"mainEntity\":[{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\\\/#faq-question-1722839913150\"},{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\\\/#faq-question-1722839951749\"},{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\\\/#faq-question-1722839974137\"},{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\\\/#faq-question-1722839995654\"},{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\\\/#faq-question-1722840017837\"}],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\\\/#primaryimage\",\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/uploads\\\/2024\\\/08\\\/Bangalore-Metro-Phase-3.png\",\"contentUrl\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/uploads\\\/2024\\\/08\\\/Bangalore-Metro-Phase-3.png\",\"width\":1200,\"height\":628},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Bangalore Metro Phase-3: Exploring the New Elevated Lines and Their Impact\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/\",\"name\":\"India's Real Estate Property Site Buy Sell rent properties portal\",\"description\":\"real estate news updates property portal\",\"publisher\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#organization\",\"name\":\"BIG PROPERTY\",\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/10\\\/BIG-PROPERTY-designed-by-sbvrgroups.in-fotter.png\",\"contentUrl\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/10\\\/BIG-PROPERTY-designed-by-sbvrgroups.in-fotter.png\",\"width\":138,\"height\":50,\"caption\":\"BIG PROPERTY\"},\"image\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/bigpropertyofficial\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#\\\/schema\\\/person\\\/64588693152bdd3de9f28586ea69e516\",\"name\":\"rakesh\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/litespeed\\\/avatar\\\/00145dfc47e9609db0f07ade9812ba9d.jpg?ver=1776488565\",\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/litespeed\\\/avatar\\\/00145dfc47e9609db0f07ade9812ba9d.jpg?ver=1776488565\",\"contentUrl\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/litespeed\\\/avatar\\\/00145dfc47e9609db0f07ade9812ba9d.jpg?ver=1776488565\",\"caption\":\"rakesh\"},\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/author\\\/rakesh\\\/\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\\\/#faq-question-1722839913150\",\"position\":1,\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\\\/#faq-question-1722839913150\",\"name\":\"Q1.What is the total length of Bengaluru Metro Phase-3?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The total length of Bengaluru Metro Phase-3 is 44.65 km, covering two elevated corridors.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\\\/#faq-question-1722839951749\",\"position\":2,\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\\\/#faq-question-1722839951749\",\"name\":\"Q2.How many stations are planned for Bengaluru Metro Phase-3?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"There are 31 stations planned for Bengaluru Metro Phase-3.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\\\/#faq-question-1722839974137\",\"position\":3,\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\\\/#faq-question-1722839974137\",\"name\":\"Q3.What are the key corridors in Bangalore metro phase 3?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The key corridors are from J P Nagar's fourth phase to Kempapura (32.15 km) and from Hosahalli to Kadabgere on Magadi Road (12.5 km).\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\\\/#faq-question-1722839995654\",\"position\":4,\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\\\/#faq-question-1722839995654\",\"name\":\"Q4.When is Bengaluru Metro Phase-3 expected to be completed?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The project is expected to be completed by 2028.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\\\/#faq-question-1722840017837\",\"position\":5,\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\\\/#faq-question-1722840017837\",\"name\":\"Q5.What is the estimated cost of Bengaluru Metro Phase-3?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The estimated cost of Bengaluru Metro Phase-3 is Rs 15,611 crore.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Bangalore metro phase 3: Key Details, Routes, and Latest Updates","description":"Bangalore metro phase 3 project: Key details, timeline, and impact of the new 44.65 km network. Discover updates on the Orange,Silver Lines","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/","og_locale":"en_US","og_type":"article","og_title":"Bangalore metro phase 3: Key Details, Routes, and Latest Updates","og_description":"Bangalore metro phase 3 project: Key details, timeline, and impact of the new 44.65 km network. Discover updates on the Orange,Silver Lines","og_url":"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/","og_site_name":"indias Real estate latest News Updates","article_publisher":"https:\/\/www.facebook.com\/bigpropertyofficial\/","article_published_time":"2024-08-05T07:37:01+00:00","article_modified_time":"2024-08-05T07:42:25+00:00","og_image":[{"width":1200,"height":628,"url":"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/08\/Bangalore-Metro-Phase-3.png","type":"image\/png"}],"author":"rakesh","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#article","isPartOf":{"@id":"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/"},"author":{"name":"rakesh","@id":"https:\/\/bigproperty.in\/blog\/#\/schema\/person\/64588693152bdd3de9f28586ea69e516"},"headline":"Bangalore Metro Phase-3: Exploring the New Elevated Lines and Their Impact","datePublished":"2024-08-05T07:37:01+00:00","dateModified":"2024-08-05T07:42:25+00:00","mainEntityOfPage":{"@id":"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/"},"wordCount":1472,"commentCount":0,"publisher":{"@id":"https:\/\/bigproperty.in\/blog\/#organization"},"image":{"@id":"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#primaryimage"},"thumbnailUrl":"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/08\/Bangalore-Metro-Phase-3.png","keywords":["Bangalore metro phase 3","Bengaluru Metro new routes","Bengaluru metro phase 3","Bengaluru Metro Phase-3 cost","Bengaluru Metro Phase-3 details","Bengaluru Metro Phase-3 stations","Bengaluru Metro Phase-3 updates","Elevated corridors Bengaluru Metro","Namma Metro Phase 3"],"articleSection":["Bangalore","city news"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#respond"]}]},{"@type":["WebPage","FAQPage"],"@id":"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/","url":"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/","name":"Bangalore metro phase 3: Key Details, Routes, and Latest Updates","isPartOf":{"@id":"https:\/\/bigproperty.in\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#primaryimage"},"image":{"@id":"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#primaryimage"},"thumbnailUrl":"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/08\/Bangalore-Metro-Phase-3.png","datePublished":"2024-08-05T07:37:01+00:00","dateModified":"2024-08-05T07:42:25+00:00","description":"Bangalore metro phase 3 project: Key details, timeline, and impact of the new 44.65 km network. Discover updates on the Orange,Silver Lines","breadcrumb":{"@id":"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#breadcrumb"},"mainEntity":[{"@id":"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#faq-question-1722839913150"},{"@id":"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#faq-question-1722839951749"},{"@id":"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#faq-question-1722839974137"},{"@id":"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#faq-question-1722839995654"},{"@id":"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#faq-question-1722840017837"}],"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#primaryimage","url":"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/08\/Bangalore-Metro-Phase-3.png","contentUrl":"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/08\/Bangalore-Metro-Phase-3.png","width":1200,"height":628},{"@type":"BreadcrumbList","@id":"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/bigproperty.in\/blog\/"},{"@type":"ListItem","position":2,"name":"Bangalore Metro Phase-3: Exploring the New Elevated Lines and Their Impact"}]},{"@type":"WebSite","@id":"https:\/\/bigproperty.in\/blog\/#website","url":"https:\/\/bigproperty.in\/blog\/","name":"India's Real Estate Property Site Buy Sell rent properties portal","description":"real estate news updates property portal","publisher":{"@id":"https:\/\/bigproperty.in\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/bigproperty.in\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/bigproperty.in\/blog\/#organization","name":"BIG PROPERTY","url":"https:\/\/bigproperty.in\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/bigproperty.in\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2020\/10\/BIG-PROPERTY-designed-by-sbvrgroups.in-fotter.png","contentUrl":"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2020\/10\/BIG-PROPERTY-designed-by-sbvrgroups.in-fotter.png","width":138,"height":50,"caption":"BIG PROPERTY"},"image":{"@id":"https:\/\/bigproperty.in\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/bigpropertyofficial\/"]},{"@type":"Person","@id":"https:\/\/bigproperty.in\/blog\/#\/schema\/person\/64588693152bdd3de9f28586ea69e516","name":"rakesh","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/bigproperty.in\/blog\/wp-content\/litespeed\/avatar\/00145dfc47e9609db0f07ade9812ba9d.jpg?ver=1776488565","url":"https:\/\/bigproperty.in\/blog\/wp-content\/litespeed\/avatar\/00145dfc47e9609db0f07ade9812ba9d.jpg?ver=1776488565","contentUrl":"https:\/\/bigproperty.in\/blog\/wp-content\/litespeed\/avatar\/00145dfc47e9609db0f07ade9812ba9d.jpg?ver=1776488565","caption":"rakesh"},"url":"https:\/\/bigproperty.in\/blog\/author\/rakesh\/"},{"@type":"Question","@id":"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#faq-question-1722839913150","position":1,"url":"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#faq-question-1722839913150","name":"Q1.What is the total length of Bengaluru Metro Phase-3?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The total length of Bengaluru Metro Phase-3 is 44.65 km, covering two elevated corridors.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#faq-question-1722839951749","position":2,"url":"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#faq-question-1722839951749","name":"Q2.How many stations are planned for Bengaluru Metro Phase-3?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"There are 31 stations planned for Bengaluru Metro Phase-3.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#faq-question-1722839974137","position":3,"url":"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#faq-question-1722839974137","name":"Q3.What are the key corridors in Bangalore metro phase 3?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The key corridors are from J P Nagar's fourth phase to Kempapura (32.15 km) and from Hosahalli to Kadabgere on Magadi Road (12.5 km).","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#faq-question-1722839995654","position":4,"url":"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#faq-question-1722839995654","name":"Q4.When is Bengaluru Metro Phase-3 expected to be completed?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The project is expected to be completed by 2028.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#faq-question-1722840017837","position":5,"url":"https:\/\/bigproperty.in\/blog\/bangaluru-metro-phase-3-exploring-the-new-elevated-lines-and-their-impact\/#faq-question-1722840017837","name":"Q5.What is the estimated cost of Bengaluru Metro Phase-3?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The estimated cost of Bengaluru Metro Phase-3 is Rs 15,611 crore.","inLanguage":"en-US"},"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/posts\/17635","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/users\/15"}],"replies":[{"embeddable":true,"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/comments?post=17635"}],"version-history":[{"count":3,"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/posts\/17635\/revisions"}],"predecessor-version":[{"id":17639,"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/posts\/17635\/revisions\/17639"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/media\/17636"}],"wp:attachment":[{"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/media?parent=17635"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/categories?post=17635"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/tags?post=17635"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}