{"id":17150,"date":"2024-07-29T16:06:30","date_gmt":"2024-07-29T10:36:30","guid":{"rendered":"https:\/\/blog.bigproperty.in\/?p=17150"},"modified":"2024-07-29T16:13:04","modified_gmt":"2024-07-29T10:43:04","slug":"mega-projects-in-andhra-pradesh-2024-that-will-change-the-state","status":"publish","type":"post","link":"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/","title":{"rendered":"Mega Projects in Andhra Pradesh 2024: Shaping the State\u2019s Future"},"content":{"rendered":"<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_81 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #000000;color:#000000\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #000000;color:#000000\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#Introduction\" >Introduction:<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#Top_Upcoming_Mega_Projects_in_Andhra_Pradesh_for_2024\" >Top Upcoming Mega Projects in Andhra Pradesh for 2024<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#1_Amaravati_Capital_City\" >1. Amaravati Capital City<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#2_Visakhapatnam-Chennai_Industrial_Corridor\" >2. Visakhapatnam-Chennai Industrial Corridor<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#3_Visakhapatnam_Light_Metro\" >3. Visakhapatnam Light Metro<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#4_Bangalore-Vijayawada_Expressway\" >4. Bangalore-Vijayawada Expressway<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#5_Vijayawada_Airport_New_Terminal\" >5. Vijayawada Airport New Terminal<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#6_Chittoor-Thatchur_Expressway\" >6. Chittoor-Thatchur Expressway<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#7_Polavaram_Lift_Irrigation_Project\" >7. Polavaram Lift Irrigation Project<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#8_Visakhapatnam_Eye\" >8. Visakhapatnam Eye<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#9_Ramayapatnam_Port\" >9. Ramayapatnam Port<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#10_Energy_Cloud_Storage_Platform_Kurnool\" >10. Energy Cloud Storage Platform, Kurnool<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#11_Khammam-Devarapalli_Highway\" >11. Khammam-Devarapalli Highway<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#Conclusion\" >Conclusion:<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#Frequently_Asked_Questions\" >Frequently Asked Questions:<\/a><\/li><\/ul><\/nav><\/div>\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Introduction\"><\/span><strong>Introduction:<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong>Mega Projects in Andhra Pradesh<\/strong>, often overshadowed by its more prominent neighbor Telangana, is set to make significant strides in development and infrastructure. Since the bifurcation of the state, there has been a marked shift towards modernization and improvement in transportation and urban planning. If you\u2019re interested in the state\u2019s upcoming advancements, here\u2019s a comprehensive look at the major mega projects slated for 2024.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Top_Upcoming_Mega_Projects_in_Andhra_Pradesh_for_2024\"><\/span><strong>Top Upcoming Mega Projects in Andhra Pradesh for 2024<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"1_Amaravati_Capital_City\"><\/span><strong>1. Amaravati Capital City<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><em><a href=\"https:\/\/bigproperty.in\/blog\/\/amaravati-why-select-amaravati-upcoming-ap-capital-2024\/#google_vignette\"><strong><mark style=\"background-color:#ffffff\" class=\"has-inline-color has-luminous-vivid-orange-color\">Amaravati<\/mark><\/strong><\/a><\/em>, the proposed capital of Andhra Pradesh, is set to span 217.23 square kilometers, with an initial seed capital area of 16.94 square kilometers. Located in Guntur district, the city is poised to become a major urban center with an estimated population of 5.8 lakh. The development aims to harness the fertile lands along the Krishna River, boosting the state\u2019s agricultural and economic prospects.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img decoding=\"async\" width=\"585\" height=\"415\" src=\"https:\/\/bigproperty.in\/blog\/\/wp-content\/uploads\/2024\/07\/Screenshot-2024-07-29-151530.png\" alt=\"Amaravati Capital\" class=\"wp-image-17154\" style=\"width:847px;height:auto\" srcset=\"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/Screenshot-2024-07-29-151530.png 585w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/Screenshot-2024-07-29-151530-300x213.png 300w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/Screenshot-2024-07-29-151530-100x70.png 100w\" sizes=\"(max-width: 585px) 100vw, 585px\" \/><\/figure>\n\n\n\n<div style=\"height:32px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>A bigger challenge for Naidu is the Amaravati project and completing it on time. the total project cost was estimated at Rs.51,687 crore&nbsp; Budget 2024: \u20b915,000 crore financial package to develop Andhra Pradesh&#8217;s capital city Amaravati<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<p><strong>Also Read: <a href=\"https:\/\/bigproperty.in\/blog\/\/future-of-andhra-pradesh-the-game-changing-amaravati-orr-with-the-latest-news-2024\/\"><mark style=\"background-color:#ffffff\" class=\"has-inline-color has-vivid-red-color\">Amaravati ORR : Complete Project details &amp; Latest news 2024<\/mark><\/a><\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"2_Visakhapatnam-Chennai_Industrial_Corridor\"><\/span><strong>2. Visakhapatnam-Chennai Industrial Corridor<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The <strong><em><a href=\"https:\/\/bigproperty.in\/blog\/\/visakhapatnam-chennai-industrial-corridor-vcic-impact-of-real-estate-growth-and-nodes\/\"><mark style=\"background-color:#ffffff\" class=\"has-inline-color has-luminous-vivid-orange-color\">Visakhapatnam-Chennai Industrial Corridor (VCIC)<\/mark><\/a><\/em><\/strong> is a key initiative within India\u2019s East Coast Economic Corridor. Stretching 800 km across nine districts in Andhra Pradesh, this corridor will enhance industrial connectivity and support economic growth. With an estimated investment of over $100 billion and the potential to create over 1 million jobs, VCIC is expected to revolutionize regional industry and employment.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"782\" height=\"798\" src=\"https:\/\/bigproperty.in\/blog\/\/wp-content\/uploads\/2024\/07\/Screenshot-2024-07-29-151736.png\" alt=\"Visakhapatnam-Chennai Industrial Corridor\n\" class=\"wp-image-17155\" srcset=\"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/Screenshot-2024-07-29-151736.png 782w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/Screenshot-2024-07-29-151736-294x300.png 294w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/Screenshot-2024-07-29-151736-768x784.png 768w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/Screenshot-2024-07-29-151736-356x364.png 356w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/Screenshot-2024-07-29-151736-696x710.png 696w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/Screenshot-2024-07-29-151736-412x420.png 412w\" sizes=\"(max-width: 782px) 100vw, 782px\" \/><\/figure>\n\n\n\n<p class=\"has-small-font-size\">source: LinkedIn<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"3_Visakhapatnam_Light_Metro\"><\/span><strong>3. Visakhapatnam Light Metro<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The Visakhapatnam Light Metro will feature four corridors covering 79.91 km and include 31 stations. The first phase, comprising two corridors totaling 42.55 km, is scheduled for completion by 2028.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/bigproperty.in\/blog\/\/wp-content\/uploads\/2024\/07\/Mega-Projects-Transforming-Telangana-in-2024-1024x536.jpg\" alt=\"Visakhapatnam Light Metro\" class=\"wp-image-17164\" srcset=\"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/Mega-Projects-Transforming-Telangana-in-2024-1024x536.jpg 1024w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/Mega-Projects-Transforming-Telangana-in-2024-300x157.jpg 300w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/Mega-Projects-Transforming-Telangana-in-2024-768x402.jpg 768w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/Mega-Projects-Transforming-Telangana-in-2024-696x364.jpg 696w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/Mega-Projects-Transforming-Telangana-in-2024-1068x559.jpg 1068w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/Mega-Projects-Transforming-Telangana-in-2024-803x420.jpg 803w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/Mega-Projects-Transforming-Telangana-in-2024.jpg 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<div style=\"height:38px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p> This project will modernize public transportation in the city, alleviate traffic congestion, and improve air quality. Andhra Pradesh government has already decided to complete the 76.9 km metro rail project at an estimated cost of \u20b914,309 crore.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"4_Bangalore-Vijayawada_Expressway\"><\/span><strong>4. Bangalore-Vijayawada Expressway<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img decoding=\"async\" width=\"877\" height=\"1024\" src=\"https:\/\/bigproperty.in\/blog\/\/wp-content\/uploads\/2024\/07\/crossroads2-877x1024.jpg\" alt=\"\" class=\"wp-image-17171\" style=\"width:733px;height:auto\" srcset=\"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/crossroads2-877x1024.jpg 877w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/crossroads2-257x300.jpg 257w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/crossroads2-768x896.jpg 768w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/crossroads2-1316x1536.jpg 1316w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/crossroads2-696x812.jpg 696w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/crossroads2-1068x1246.jpg 1068w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/crossroads2-360x420.jpg 360w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/crossroads2.jpg 1617w\" sizes=\"(max-width: 877px) 100vw, 877px\" \/><\/figure>\n\n\n\n<div style=\"height:40px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>This 518 km expressway will significantly reduce travel time between Bangalore and Vijayawada from 12 hours to 6 hours. Constructed under the Bharatmala Pariyojana Phase 2, the expressway will pass through several key districts and is expected to boost economic relations and connectivity between Karnataka and Andhra Pradesh. The estimated budget for this project is Rs. 19,320 crore.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"5_Vijayawada_Airport_New_Terminal\"><\/span><strong>5. Vijayawada Airport New Terminal<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The expansion of Vijayawada Airport includes a new 35,000 m\u00b2 terminal designed to handle an additional 1,200 passengers. Construction began in 2018, and while 20% of the work is complete, further progress is expected. The expansion will enhance the airport\u2019s capacity and efficiency, supporting both domestic and international travel. The project for the construction of the new integrated terminal building and associated works at the airport at an estimated cost of Rs 611.80 crore&nbsp;&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img decoding=\"async\" width=\"1024\" height=\"626\" src=\"https:\/\/bigproperty.in\/blog\/\/wp-content\/uploads\/2024\/07\/Screenshot-2024-07-29-152101-1024x626.png\" alt=\"Vijayawada Airport New Terminal\" class=\"wp-image-17156\" style=\"width:845px;height:auto\" srcset=\"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/Screenshot-2024-07-29-152101-1024x626.png 1024w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/Screenshot-2024-07-29-152101-300x183.png 300w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/Screenshot-2024-07-29-152101-768x469.png 768w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/Screenshot-2024-07-29-152101-696x425.png 696w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/Screenshot-2024-07-29-152101-1068x653.png 1068w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/Screenshot-2024-07-29-152101-687x420.png 687w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/Screenshot-2024-07-29-152101.png 1347w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"has-small-font-size\">Source :X<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"6_Chittoor-Thatchur_Expressway\"><\/span><strong>6. Chittoor-Thatchur Expressway<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The Chittoor-Thatchur Expressway will be a 117 km greenfield highway, part of the Bharatmala Pariyojana Phase 1. The project will feature extensive infrastructure, including bridges and interchanges, and aims to reduce travel time and enhance economic activity. With a budget of Rs. 3,197.56 crore, the expressway is set to be completed by December 2024.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"7_Polavaram_Lift_Irrigation_Project\"><\/span><strong>7. Polavaram Lift Irrigation Project<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The Polavaram Lift Irrigation Project on the Godavari River aims to irrigate 6.03 lakh acres and generate 1,200 MW of hydroelectricity. This major infrastructure project includes a 2454 m dam and extensive canal systems. Completion is projected for 2025, which will significantly boost agriculture and the economy in the state.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img decoding=\"async\" width=\"332\" height=\"152\" src=\"https:\/\/bigproperty.in\/blog\/\/wp-content\/uploads\/2024\/07\/images-3.jpeg\" alt=\"Polavaram Lift Irrigation Project\" class=\"wp-image-17157\" style=\"width:804px;height:auto\" srcset=\"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/images-3.jpeg 332w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/images-3-300x137.jpeg 300w\" sizes=\"(max-width: 332px) 100vw, 332px\" \/><\/figure>\n\n\n\n<p class=\"has-small-font-size\">Source Facebook<\/p>\n\n\n\n<p>The project cost based on the dam&#8217;s height fixation at 41.15 meters is pegged at nearly Rs 30,636 crore in phase 1 of the works. For this, approval from the Union Cabinet is necessary. The balance amount of Rs 12,157 crore is yet to be released by the Centre.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"8_Visakhapatnam_Eye\"><\/span><strong>8. Visakhapatnam Eye<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Inspired by the London Eye, the Visakhapatnam Eye will be a major tourist attraction offering panoramic views of the city. Located in Kapulauppada, this project will feature dining facilities and will be one of three significant tourism projects in the region.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<p><strong>Also Read: <a href=\"https:\/\/bigproperty.in\/blog\/\/future-of-andhra-pradesh-real-estate-growth-developments-investment\/\"><mark style=\"background-color:#ffffff\" class=\"has-inline-color has-vivid-red-color\">Future of Andhra Pradesh real estate: Growth, Developments &amp; Investment<\/mark><\/a><\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"9_Ramayapatnam_Port\"><\/span><strong>9. Ramayapatnam Port<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Developed on the Bay of Bengal coast, Ramayapatnam Port is expected to be completed by 2025. The project, divided into two phases, will include a breakwater, quay walls, and cargo handling facilities. This deep-water port will facilitate various cargo types and is anticipated to generate thousands of jobs.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img decoding=\"async\" width=\"514\" height=\"720\" src=\"https:\/\/bigproperty.in\/blog\/\/wp-content\/uploads\/2024\/07\/440328015_333138289790763_9053004764992146460_n.jpg\" alt=\"Ramayapatnam Port\" class=\"wp-image-17158\" style=\"width:599px;height:auto\" srcset=\"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/440328015_333138289790763_9053004764992146460_n.jpg 514w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/440328015_333138289790763_9053004764992146460_n-214x300.jpg 214w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/440328015_333138289790763_9053004764992146460_n-300x420.jpg 300w\" sizes=\"(max-width: 514px) 100vw, 514px\" \/><\/figure>\n\n\n\n<p class=\"has-small-font-size\">Source: Facebook<\/p>\n\n\n\n<p>Ramayapatnam Port in Nellore district is being developed under the &#8216;landlord model&#8217; \u2014 the government will own the infrastructure and lease it to private companies \u2014 by the Ramayapatnam Port Development Corporation Ltd at a cost of \u20b93,736 crore.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"10_Energy_Cloud_Storage_Platform_Kurnool\"><\/span><strong>10. Energy Cloud Storage Platform, Kurnool<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Kurnool is set to host the world\u2019s largest clean energy hub, the Energy Cloud Storage Platform (ECSP). This innovative project will support a total capacity of 5,230 MW from solar, wind, and hydropower sources. The ECSP aims to integrate renewable energy into the grid, reduce carbon emissions, and create numerous jobs.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img decoding=\"async\" width=\"680\" height=\"529\" src=\"https:\/\/bigproperty.in\/blog\/\/wp-content\/uploads\/2024\/07\/FrPD6aKWYAAfUvj-1.jpeg\" alt=\"Energy Cloud Storage Platform, Kurnool\" class=\"wp-image-17160\" style=\"width:742px;height:auto\" srcset=\"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/FrPD6aKWYAAfUvj-1.jpeg 680w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/FrPD6aKWYAAfUvj-1-300x233.jpeg 300w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/FrPD6aKWYAAfUvj-1-540x420.jpeg 540w\" sizes=\"(max-width: 680px) 100vw, 680px\" \/><\/figure>\n\n\n\n<p class=\"has-small-font-size\">Source:x<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<p><strong>Also Read: <a href=\"https:\/\/bigproperty.in\/blog\/\/visakhapatnam-chennai-industrial-corridor-vcic-impact-of-real-estate-growth-and-nodes\/\"><mark style=\"background-color:#ffffff\" class=\"has-inline-color has-vivid-red-color\">Visakhapatnam Chennai Industrial Corridor (VCIC): Impact of real estate, growth and Nodes<\/mark><\/a><\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"11_Khammam-Devarapalli_Highway\"><\/span><strong>11. Khammam-Devarapalli Highway<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The Devarapalli-Khammam Highway will connect Andhra Pradesh with Telangana through a 162.12 km four-lane access-controlled road. This highway, part of the Bharatmala Pariyojana Phase 1, will reduce travel time from 3 hours to 1 hour 30 minutes and boost economic activity. Expected completion is by 2024.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img decoding=\"async\" width=\"997\" height=\"1024\" src=\"https:\/\/bigproperty.in\/blog\/\/wp-content\/uploads\/2024\/07\/2020-997x1024.jpg\" alt=\"\" class=\"wp-image-17168\" style=\"width:765px;height:auto\" srcset=\"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/2020-997x1024.jpg 997w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/2020-292x300.jpg 292w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/2020-768x789.jpg 768w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/2020-1496x1536.jpg 1496w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/2020-1995x2048.jpg 1995w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/2020-696x715.jpg 696w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/2020-1068x1097.jpg 1068w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/2020-409x420.jpg 409w\" sizes=\"(max-width: 997px) 100vw, 997px\" \/><\/figure>\n\n\n\n<div style=\"height:39px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>This highway forms a part of the 221 km Suryapet \u2013 Devarapalle Expressway (NH-365BB) or Hyderabad \u2013 Visakhapatnam Expressway being built for Rs. 4939 crore.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">The estimated costs and names of the mega projects in Andhra Pradesh for 2024:<\/h4>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th><strong>Project Name<\/strong><\/th><th><strong>Estimated Cost<\/strong><\/th><\/tr><\/thead><tbody><tr><td>Amaravati Capital City<\/td><td>\u20b951,687 crore (total)<\/td><\/tr><tr><td><\/td><td>\u20b915,000 crore (2024 budget)<\/td><\/tr><tr><td>Visakhapatnam-Chennai Industrial Corridor<\/td><td>Over $100 billion<\/td><\/tr><tr><td>Visakhapatnam Light Metro<\/td><td>\u20b914,309 crore<\/td><\/tr><tr><td>Bangalore-Vijayawada Expressway<\/td><td>\u20b919,320 crore<\/td><\/tr><tr><td>Vijayawada Airport New Terminal<\/td><td>\u20b9611.80 crore<\/td><\/tr><tr><td>Chittoor-Thatchur Expressway<\/td><td>\u20b93,197.56 crore<\/td><\/tr><tr><td>Polavaram Lift Irrigation Project<\/td><td>\u20b930,636 crore (Phase-1)<\/td><\/tr><tr><td><\/td><td>\u20b912,157 crore (Pending)<\/td><\/tr><tr><td>Visakhapatnam Eye<\/td><td>Not specified<\/td><\/tr><tr><td>Ramayapatnam Port<\/td><td>\u20b93,736 crore<\/td><\/tr><tr><td>Energy Cloud Storage Platform, Kurnool<\/td><td>Not specified<\/td><\/tr><tr><td>Khammam-Devarapalli Highway<\/td><td>\u20b94,939 crore<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Conclusion\"><\/span><strong>Conclusion<\/strong>:<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Andhra Pradesh is emerging as a hub of progress and innovation. The state\u2019s commitment to enhancing infrastructure and technological advancements through these mega projects reflects its aspirations for growth. Funded by both state and central governments, these initiatives are set to shape the future of Andhra Pradesh and contribute to the broader national development.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Frequently_Asked_Questions\"><\/span><strong>Frequently Asked Questions:<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-1722245487061\"><strong class=\"schema-faq-question\">Q1.<strong>What are the major projects in Andhra Pradesh for 2024?<\/strong><\/strong> <p class=\"schema-faq-answer\">Key projects include Amaravati Capital City, Visakhapatnam-Chennai Industrial Corridor, and the Bangalore-Vijayawada Expressway.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1722245515637\"><strong class=\"schema-faq-question\">Q2.<strong>How much is the Amaravati Capital City project estimated to cost?<\/strong><\/strong> <p class=\"schema-faq-answer\">The Amaravati project is estimated at \u20b951,687 crore, with \u20b915,000 crore allocated for 2024.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1722245563261\"><strong class=\"schema-faq-question\">Q3.<strong>When is the Visakhapatnam Light Metro expected to be completed?<\/strong><\/strong> <p class=\"schema-faq-answer\">The first phase of the Visakhapatnam Light Metro, covering 42.55 km, is set to be completed by 2028.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1722245583053\"><strong class=\"schema-faq-question\">Q4.<strong>What is the budget for the Bangalore-Vijayawada Expressway?<\/strong><\/strong> <p class=\"schema-faq-answer\">The expressway has an estimated budget of \u20b919,320 crore.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1722245608679\"><strong class=\"schema-faq-question\">Q5.<strong>What is the goal of the Polavaram Lift Irrigation Project?<\/strong><\/strong> <p class=\"schema-faq-answer\">The project aims to irrigate 6.03 lakh acres and generate 1,200 MW of hydroelectricity.<br \/><br \/><\/p> <\/div> <\/div>\n\n\n\n<div class=\"wp-block-buttons has-custom-font-size has-medium-font-size is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-vivid-red-background-color has-background wp-element-button\" href=\"https:\/\/whatsapp.com\/channel\/0029VaAUFkA9sBIBNO1s1u1V\"><strong><em> WhatsApp channel<\/em><\/strong><\/a><\/div>\n\n\n\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-white-color has-vivid-green-cyan-background-color has-text-color has-background has-link-color wp-element-button\" href=\"https:\/\/play.google.com\/store\/apps\/details?id=bigproperty.in&amp;pcampaignid=web_share\"><strong><em>Download our App<\/em><\/strong><\/a><\/div>\n<\/div>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Suggested Articles:<\/strong><\/h3>\n\n\n\n<p><a href=\"https:\/\/bigproperty.in\/blog\/\/visakhapatnam-chennai-industrial-corridor-vcic-impact-of-real-estate-growth-and-nodes\/\">Visakhapatnam Chennai Industrial Corridor (VCIC): Impact of real estate, growth and Nodes<\/a><\/p>\n\n\n\n<p><a href=\"https:\/\/bigproperty.in\/blog\/\/future-of-andhra-pradesh-real-estate-growth-developments-investment\/\">Future of Andhra Pradesh real estate: Growth, Developments &amp; Investment<\/a><\/p>\n\n\n\n<p><a href=\"https:\/\/bigproperty.in\/blog\/\/future-of-andhra-pradesh-the-game-changing-amaravati-orr-with-the-latest-news-2024\/\">Amaravati ORR : Complete Project details &amp; Latest news 2024<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Introduction: Mega Projects in Andhra Pradesh, often overshadowed by its more prominent neighbor Telangana, is set to make significant strides in development and infrastructure. Since the bifurcation of the state, there has been a marked shift towards modernization and improvement in transportation and urban planning. If you\u2019re interested in the state\u2019s upcoming advancements, here\u2019s a [&hellip;]<\/p>\n","protected":false},"author":15,"featured_media":17165,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[51],"tags":[8770,8783,8782,8769,8784,8781,8780,8786,8787,8785,8773,8775,8779,8776,8778,8774,8777,8772,8771],"class_list":{"0":"post-17150","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-latest-upadates","8":"tag-amaravati-capital-city","10":"tag-andhra-pradesh-economic-growth","11":"tag-andhra-pradesh-mega-projects-2024","12":"tag-andhra-pradesh-road-projects","13":"tag-andhra-pradesh-transportation-projects","14":"tag-andhra-pradesh-urban-planning","15":"tag-ap-megaprojects","16":"tag-ap-projects","17":"tag-ap-roads","18":"tag-bangalore-vijayawada-expressway","19":"tag-chittoor-thatchur-expressway","20":"tag-khammam-devarapalli-highway","21":"tag-polavaram-lift-irrigation-project","22":"tag-ramayapatnam-port","23":"tag-vijayawada-airport-new-terminal","24":"tag-visakhapatnam-eye","25":"tag-visakhapatnam-light-metro","26":"tag-visakhapatnam-chennai-industrial-corridor-2"},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Mega Projects in Andhra Pradesh 2024: That Will Change the State<\/title>\n<meta name=\"description\" content=\"Mega Projects in Andhra Pradesh 2024, including the Amaravati Capital City, Visakhapatnam Light Metro, and Bangalore-Vijayawada Expressway.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Mega Projects in Andhra Pradesh 2024: That Will Change the State\" \/>\n<meta property=\"og:description\" content=\"Mega Projects in Andhra Pradesh 2024, including the Amaravati Capital City, Visakhapatnam Light Metro, and Bangalore-Vijayawada Expressway.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/\" \/>\n<meta property=\"og:site_name\" content=\"indias Real estate latest News Updates\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/bigpropertyofficial\/\" \/>\n<meta property=\"article:published_time\" content=\"2024-07-29T10:36:30+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-07-29T10:43:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/Mega-Projects-Transforming-Telangana-in-2024-2.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"628\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"rakesh\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\\\/\"},\"author\":{\"name\":\"rakesh\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#\\\/schema\\\/person\\\/64588693152bdd3de9f28586ea69e516\"},\"headline\":\"Mega Projects in Andhra Pradesh 2024: Shaping the State\u2019s Future\",\"datePublished\":\"2024-07-29T10:36:30+00:00\",\"dateModified\":\"2024-07-29T10:43:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\\\/\"},\"wordCount\":1158,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/uploads\\\/2024\\\/07\\\/Mega-Projects-Transforming-Telangana-in-2024-2.png\",\"keywords\":[\"Amaravati Capital City\",\"Andhra Pradesh clean energy projects\",\"Andhra Pradesh economic growth\",\"Andhra Pradesh mega projects 2024\",\"Andhra Pradesh road projects\",\"Andhra Pradesh transportation projects\",\"Andhra Pradesh urban planning\",\"AP megaprojects\",\"AP Projects\",\"AP Roads\",\"Bangalore-Vijayawada Expressway\",\"Chittoor-Thatchur Expressway\",\"Khammam-Devarapalli Highway\",\"Polavaram Lift Irrigation Project\",\"Ramayapatnam Port\",\"Vijayawada Airport New Terminal\",\"Visakhapatnam Eye\",\"Visakhapatnam Light Metro\",\"Visakhapatnam-Chennai Industrial Corridor\"],\"articleSection\":[\"Latest Upadates\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\\\/#respond\"]}]},{\"@type\":[\"WebPage\",\"FAQPage\"],\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\\\/\",\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\\\/\",\"name\":\"Mega Projects in Andhra Pradesh 2024: That Will Change the State\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/uploads\\\/2024\\\/07\\\/Mega-Projects-Transforming-Telangana-in-2024-2.png\",\"datePublished\":\"2024-07-29T10:36:30+00:00\",\"dateModified\":\"2024-07-29T10:43:04+00:00\",\"description\":\"Mega Projects in Andhra Pradesh 2024, including the Amaravati Capital City, Visakhapatnam Light Metro, and Bangalore-Vijayawada Expressway.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\\\/#breadcrumb\"},\"mainEntity\":[{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\\\/#faq-question-1722245487061\"},{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\\\/#faq-question-1722245515637\"},{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\\\/#faq-question-1722245563261\"},{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\\\/#faq-question-1722245583053\"},{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\\\/#faq-question-1722245608679\"}],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\\\/#primaryimage\",\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/uploads\\\/2024\\\/07\\\/Mega-Projects-Transforming-Telangana-in-2024-2.png\",\"contentUrl\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/uploads\\\/2024\\\/07\\\/Mega-Projects-Transforming-Telangana-in-2024-2.png\",\"width\":1200,\"height\":628},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Mega Projects in Andhra Pradesh 2024: Shaping the State\u2019s Future\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/\",\"name\":\"India's Real Estate Property Site Buy Sell rent properties portal\",\"description\":\"real estate news updates property portal\",\"publisher\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#organization\",\"name\":\"BIG PROPERTY\",\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/10\\\/BIG-PROPERTY-designed-by-sbvrgroups.in-fotter.png\",\"contentUrl\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/10\\\/BIG-PROPERTY-designed-by-sbvrgroups.in-fotter.png\",\"width\":138,\"height\":50,\"caption\":\"BIG PROPERTY\"},\"image\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/bigpropertyofficial\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#\\\/schema\\\/person\\\/64588693152bdd3de9f28586ea69e516\",\"name\":\"rakesh\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/litespeed\\\/avatar\\\/00145dfc47e9609db0f07ade9812ba9d.jpg?ver=1775278554\",\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/litespeed\\\/avatar\\\/00145dfc47e9609db0f07ade9812ba9d.jpg?ver=1775278554\",\"contentUrl\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/litespeed\\\/avatar\\\/00145dfc47e9609db0f07ade9812ba9d.jpg?ver=1775278554\",\"caption\":\"rakesh\"},\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/author\\\/rakesh\\\/\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\\\/#faq-question-1722245487061\",\"position\":1,\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\\\/#faq-question-1722245487061\",\"name\":\"Q1.What are the major projects in Andhra Pradesh for 2024?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Key projects include Amaravati Capital City, Visakhapatnam-Chennai Industrial Corridor, and the Bangalore-Vijayawada Expressway.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\\\/#faq-question-1722245515637\",\"position\":2,\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\\\/#faq-question-1722245515637\",\"name\":\"Q2.How much is the Amaravati Capital City project estimated to cost?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The Amaravati project is estimated at \u20b951,687 crore, with \u20b915,000 crore allocated for 2024.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\\\/#faq-question-1722245563261\",\"position\":3,\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\\\/#faq-question-1722245563261\",\"name\":\"Q3.When is the Visakhapatnam Light Metro expected to be completed?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The first phase of the Visakhapatnam Light Metro, covering 42.55 km, is set to be completed by 2028.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\\\/#faq-question-1722245583053\",\"position\":4,\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\\\/#faq-question-1722245583053\",\"name\":\"Q4.What is the budget for the Bangalore-Vijayawada Expressway?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The expressway has an estimated budget of \u20b919,320 crore.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\\\/#faq-question-1722245608679\",\"position\":5,\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\\\/#faq-question-1722245608679\",\"name\":\"Q5.What is the goal of the Polavaram Lift Irrigation Project?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The project aims to irrigate 6.03 lakh acres and generate 1,200 MW of hydroelectricity.<br \\\/><br \\\/>\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Mega Projects in Andhra Pradesh 2024: That Will Change the State","description":"Mega Projects in Andhra Pradesh 2024, including the Amaravati Capital City, Visakhapatnam Light Metro, and Bangalore-Vijayawada Expressway.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/","og_locale":"en_US","og_type":"article","og_title":"Mega Projects in Andhra Pradesh 2024: That Will Change the State","og_description":"Mega Projects in Andhra Pradesh 2024, including the Amaravati Capital City, Visakhapatnam Light Metro, and Bangalore-Vijayawada Expressway.","og_url":"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/","og_site_name":"indias Real estate latest News Updates","article_publisher":"https:\/\/www.facebook.com\/bigpropertyofficial\/","article_published_time":"2024-07-29T10:36:30+00:00","article_modified_time":"2024-07-29T10:43:04+00:00","og_image":[{"width":1200,"height":628,"url":"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/Mega-Projects-Transforming-Telangana-in-2024-2.png","type":"image\/png"}],"author":"rakesh","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#article","isPartOf":{"@id":"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/"},"author":{"name":"rakesh","@id":"https:\/\/bigproperty.in\/blog\/#\/schema\/person\/64588693152bdd3de9f28586ea69e516"},"headline":"Mega Projects in Andhra Pradesh 2024: Shaping the State\u2019s Future","datePublished":"2024-07-29T10:36:30+00:00","dateModified":"2024-07-29T10:43:04+00:00","mainEntityOfPage":{"@id":"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/"},"wordCount":1158,"commentCount":0,"publisher":{"@id":"https:\/\/bigproperty.in\/blog\/#organization"},"image":{"@id":"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#primaryimage"},"thumbnailUrl":"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/Mega-Projects-Transforming-Telangana-in-2024-2.png","keywords":["Amaravati Capital City","Andhra Pradesh clean energy projects","Andhra Pradesh economic growth","Andhra Pradesh mega projects 2024","Andhra Pradesh road projects","Andhra Pradesh transportation projects","Andhra Pradesh urban planning","AP megaprojects","AP Projects","AP Roads","Bangalore-Vijayawada Expressway","Chittoor-Thatchur Expressway","Khammam-Devarapalli Highway","Polavaram Lift Irrigation Project","Ramayapatnam Port","Vijayawada Airport New Terminal","Visakhapatnam Eye","Visakhapatnam Light Metro","Visakhapatnam-Chennai Industrial Corridor"],"articleSection":["Latest Upadates"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#respond"]}]},{"@type":["WebPage","FAQPage"],"@id":"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/","url":"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/","name":"Mega Projects in Andhra Pradesh 2024: That Will Change the State","isPartOf":{"@id":"https:\/\/bigproperty.in\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#primaryimage"},"image":{"@id":"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#primaryimage"},"thumbnailUrl":"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/Mega-Projects-Transforming-Telangana-in-2024-2.png","datePublished":"2024-07-29T10:36:30+00:00","dateModified":"2024-07-29T10:43:04+00:00","description":"Mega Projects in Andhra Pradesh 2024, including the Amaravati Capital City, Visakhapatnam Light Metro, and Bangalore-Vijayawada Expressway.","breadcrumb":{"@id":"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#breadcrumb"},"mainEntity":[{"@id":"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#faq-question-1722245487061"},{"@id":"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#faq-question-1722245515637"},{"@id":"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#faq-question-1722245563261"},{"@id":"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#faq-question-1722245583053"},{"@id":"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#faq-question-1722245608679"}],"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#primaryimage","url":"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/Mega-Projects-Transforming-Telangana-in-2024-2.png","contentUrl":"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/Mega-Projects-Transforming-Telangana-in-2024-2.png","width":1200,"height":628},{"@type":"BreadcrumbList","@id":"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/bigproperty.in\/blog\/"},{"@type":"ListItem","position":2,"name":"Mega Projects in Andhra Pradesh 2024: Shaping the State\u2019s Future"}]},{"@type":"WebSite","@id":"https:\/\/bigproperty.in\/blog\/#website","url":"https:\/\/bigproperty.in\/blog\/","name":"India's Real Estate Property Site Buy Sell rent properties portal","description":"real estate news updates property portal","publisher":{"@id":"https:\/\/bigproperty.in\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/bigproperty.in\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/bigproperty.in\/blog\/#organization","name":"BIG PROPERTY","url":"https:\/\/bigproperty.in\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/bigproperty.in\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2020\/10\/BIG-PROPERTY-designed-by-sbvrgroups.in-fotter.png","contentUrl":"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2020\/10\/BIG-PROPERTY-designed-by-sbvrgroups.in-fotter.png","width":138,"height":50,"caption":"BIG PROPERTY"},"image":{"@id":"https:\/\/bigproperty.in\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/bigpropertyofficial\/"]},{"@type":"Person","@id":"https:\/\/bigproperty.in\/blog\/#\/schema\/person\/64588693152bdd3de9f28586ea69e516","name":"rakesh","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/bigproperty.in\/blog\/wp-content\/litespeed\/avatar\/00145dfc47e9609db0f07ade9812ba9d.jpg?ver=1775278554","url":"https:\/\/bigproperty.in\/blog\/wp-content\/litespeed\/avatar\/00145dfc47e9609db0f07ade9812ba9d.jpg?ver=1775278554","contentUrl":"https:\/\/bigproperty.in\/blog\/wp-content\/litespeed\/avatar\/00145dfc47e9609db0f07ade9812ba9d.jpg?ver=1775278554","caption":"rakesh"},"url":"https:\/\/bigproperty.in\/blog\/author\/rakesh\/"},{"@type":"Question","@id":"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#faq-question-1722245487061","position":1,"url":"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#faq-question-1722245487061","name":"Q1.What are the major projects in Andhra Pradesh for 2024?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"Key projects include Amaravati Capital City, Visakhapatnam-Chennai Industrial Corridor, and the Bangalore-Vijayawada Expressway.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#faq-question-1722245515637","position":2,"url":"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#faq-question-1722245515637","name":"Q2.How much is the Amaravati Capital City project estimated to cost?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The Amaravati project is estimated at \u20b951,687 crore, with \u20b915,000 crore allocated for 2024.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#faq-question-1722245563261","position":3,"url":"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#faq-question-1722245563261","name":"Q3.When is the Visakhapatnam Light Metro expected to be completed?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The first phase of the Visakhapatnam Light Metro, covering 42.55 km, is set to be completed by 2028.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#faq-question-1722245583053","position":4,"url":"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#faq-question-1722245583053","name":"Q4.What is the budget for the Bangalore-Vijayawada Expressway?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The expressway has an estimated budget of \u20b919,320 crore.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#faq-question-1722245608679","position":5,"url":"https:\/\/bigproperty.in\/blog\/mega-projects-in-andhra-pradesh-2024-that-will-change-the-state\/#faq-question-1722245608679","name":"Q5.What is the goal of the Polavaram Lift Irrigation Project?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The project aims to irrigate 6.03 lakh acres and generate 1,200 MW of hydroelectricity.<br \/><br \/>","inLanguage":"en-US"},"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/posts\/17150","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/users\/15"}],"replies":[{"embeddable":true,"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/comments?post=17150"}],"version-history":[{"count":4,"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/posts\/17150\/revisions"}],"predecessor-version":[{"id":17172,"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/posts\/17150\/revisions\/17172"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/media\/17165"}],"wp:attachment":[{"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/media?parent=17150"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/categories?post=17150"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/tags?post=17150"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}