{"id":12603,"date":"2023-12-06T13:00:13","date_gmt":"2023-12-06T07:30:13","guid":{"rendered":"https:\/\/blog.bigproperty.in\/?p=12603"},"modified":"2023-12-06T13:00:15","modified_gmt":"2023-12-06T07:30:15","slug":"mumbai-metro-updates-2024-new-routes-maps-stations-list-lines","status":"publish","type":"post","link":"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/","title":{"rendered":"Mumbai Metro Updates 2024: New Routes, Maps, Stations List, Lines"},"content":{"rendered":"<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_81 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #000000;color:#000000\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #000000;color:#000000\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#1_Introduction_On_Mumbai_Metro\" >1. Introduction On Mumbai Metro<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#3_Operational_Metro_Lines_of_Mumbai_Metro\" >3. Operational Metro Lines of Mumbai Metro<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#31_Mumbai_Metro_Route_%E2%80%93_Line_1_Blue_Line_Versova-Andheri-Ghatkopar_Route\" >3.1) Mumbai Metro Route &#8211; Line 1: Blue Line : Versova-Andheri-Ghatkopar\u00a0Route<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#4_Mumbai_Metro_Stations_Line_1\" >4. Mumbai Metro Stations Line 1<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#5_Mumbai_Metro_Under_Construction_Lines\" >5. Mumbai Metro Under Construction Lines<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#6_Mumbai_Metro_Line_2_Stations\" >6. Mumbai Metro Line 2 Stations<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#7_Mumbai_Metro_Line_3_Route_Cuffe_Parade_to_Aarey_Colony_Aqua-Line\" >7. Mumbai Metro Line 3 Route: Cuffe Parade to Aarey Colony Aqua-Line<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#8_Mumbai_Metro_Line_3_Stations\" >8. Mumbai Metro Line 3 Stations<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#9_Mumbai_Metro_Route_%E2%80%93_Line_4_Green_Line_Wadala_to_Kasarvadavali\" >9. Mumbai Metro Route &#8211; Line 4: Green Line : Wadala to Kasarvadavali<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#10_Mumbai_Metro_Route_%E2%80%93_Line_5_Orange_Line_Thane-Bhiwandi-Kalyan\" >10. Mumbai Metro Route &#8211; Line 5: Orange Line: Thane-Bhiwandi-Kalyan<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#Read_Also_Our_Articles\" >Read Also Our Articles<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#12_Mumbai_Metro_Route_Dahisar_East_to_Mumbai_Airport_%E2%80%93_Lines_7_and_7A_Red_Line\" >12. Mumbai Metro Route: Dahisar East to Mumbai Airport &#8211; Lines 7 and 7A: Red Line<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#13_Mumbai_Metro_Line_7_Stations\" >13. Mumbai Metro Line 7 Stations<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#14_Mumbai_Metro_Route_%E2%80%93_Line_8_CSIA_to_NMIA_Airport_Connector_on_the_Gold_Line\" >14. Mumbai Metro Route &#8211; Line 8: CSIA to NMIA (Airport Connector) on the Gold Line<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#Latest_Posts\" >Latest Posts<\/a><\/li><\/ul><\/nav><\/div>\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"1_Introduction_On_Mumbai_Metro\"><\/span><strong>1. Introduction On Mumbai Metro<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The Maharashtra government&#8217;s ambitious and expansive infrastructure project is the <em><strong>Mumbai metro.<\/strong><\/em> The Mumbai metro will offer smooth, reasonably priced, and all-inclusive connection options to its residents once it is completely operating. The Mumbai metro project is being carried out by the Mumbai Metropolitan Development Authority (MMRDA). On the other hand, Mumbai Metro Rail Corporation Limited (MMRCL) is in charge of Mumbai Metro Line 3 (MML-3), the portion of the Mumbai Metro that is entirely underground.<\/p>\n\n\n\n<p>The Mumbai local rail system was already overloaded when the Maharashtra government began work on the Mumbai metro project in 2006. However, just one line of the<em><strong> Mumbai metro<\/strong><\/em>\u2014<em><strong>Versova-Andheri-Ghatkopar<\/strong><\/em>\u2014is now in service due to factors like delays in land acquisition, environmental clearances, and project approvals.<\/p>\n\n\n\n<p>Some metro routes, such as Metro 2A and Metro Line 7, are almost finished, and safety testing is ongoing. The building of the other Mumbai metro lines is ongoing. The routes, lines, stations, and specifics of the Mumbai metro system will all be covered in this article.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>2. Mumbai Metro Route Map<\/strong><\/h3>\n\n\n\n<p>The majority of the Mumbai Metro&#8217;s lines are being built in stages. The following is a general route map of the Mumbai Metro:<\/p>\n\n\n\n<p><strong>Mumbai Metro Lines: <\/strong>Corridors, Stations, and Connectivity<\/p>\n\n\n\n<p>The Mumbai Metro Lines may now be divided into three major categories:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Operational Metro Lines<\/li><li>Under Construction Metro Lines<\/li><li>Proposed\/Approved Metro Lines<\/li><\/ul>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img decoding=\"async\" src=\"https:\/\/bigproperty.in\/blog\/\/wp-content\/uploads\/2023\/12\/image1-1.jpg\" alt=\"Mumbai Metro Route Map\" class=\"wp-image-12605\" width=\"554\" height=\"808\" srcset=\"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2023\/12\/image1-1.jpg 587w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2023\/12\/image1-1-206x300.jpg 206w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2023\/12\/image1-1-288x420.jpg 288w\" sizes=\"(max-width: 554px) 100vw, 554px\" \/><figcaption><em>Mumbai Metro Route Map<\/em><\/figcaption><\/figure>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>The Mumbai metro lines are summarised below:<\/strong><\/h4>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Metro Line<\/strong><\/td><td><strong>Colour Code<\/strong><\/td><td><strong>Metro route<\/strong><\/td><td><strong>Total Length (in Km)<\/strong><\/td><td><strong>Number of Stations<\/strong><\/td><td><strong>Construction Status<\/strong><\/td><\/tr><tr><td>Mumbai Metro Line-1<\/td><td>Blue Line<\/td><td>Versova\u00a0\u2013 Andheri \u2013 Ghatkopar<\/td><td>11.4 Km<\/td><td>12<\/td><td>Operational<\/td><\/tr><tr><td>Mumbai Metro Line-2A<\/td><td>Yellow Line<\/td><td>Dahisar (E) to DN Nagar<\/td><td>18.60 Km<\/td><td>17<\/td><td>Operational<\/td><\/tr><tr><td>Mumbai Metro Line-2B<\/td><td>Yellow Line<\/td><td>DN Nagar to Mandale<\/td><td>23.64 Km<\/td><td>22<\/td><td>Under Construction<\/td><\/tr><tr><td>Mumbai Metro Line-3<\/td><td>Aqua Line<\/td><td>Cuffe Parade\u00a0-Bandra Kurla Complex (BKC)- SEEPZ- Aarey Colony<\/td><td>33.50 Km<\/td><td>27<\/td><td>Under Construction<\/td><\/tr><tr><td>Mumbai Metro Line-4<\/td><td>Green Line<\/td><td>Wadala to Kasarawadavali<\/td><td>32.32 Km<\/td><td>32<\/td><td>Under Construction<\/td><\/tr><tr><td>Mumbai Metro Line-4A<\/td><td>Green Line<\/td><td>Kasarvadavali \u2013to Gaimukh<br>(Extension of Line-4)<\/td><td>2.88 Km<\/td><td>2<\/td><td>Under Construction<\/td><\/tr><tr><td>Mumbai Metro Line-5<\/td><td>Orange Line<\/td><td>Thane\u00a0\u2013 Bhiwandi \u2013 Kalyan<\/td><td>24.95 Km<\/td><td>17<\/td><td>12.811 km Under Construction; Rest of the project is on Hold<\/td><\/tr><tr><td>Mumbai Metro Line-6<\/td><td>Pink Line<\/td><td>Swami Samarth Nagar \u2013 Vikhroli<\/td><td>15.18 Km<\/td><td>13<\/td><td>Under Construction<\/td><\/tr><tr><td>Mumbai Metro Line-7<\/td><td>Red Line<\/td><td>Dahisar (E) \u2013 Andheri (E)<\/td><td>16.5 Km<\/td><td>14<\/td><td>Operational<\/td><\/tr><tr><td>The Mumbai Metro Line-7A<\/td><td>Red Line<\/td><td>Andheri (E) Station \u2013 CSI Airport Station<br>(Extension of Line-7)<\/td><td>3.17 Km<\/td><td>2<\/td><td>Under Construction<\/td><\/tr><tr><td>Mumbai Metro Line-8<\/td><td>Gold Line<\/td><td>CSIA \u2013 NMIA<br>(Airport Connector)<\/td><td>35 Km<\/td><td>7<\/td><td>Proposed Line<\/td><\/tr><tr><td>The Mumbai Metro Line-9<\/td><td>Red Line<\/td><td>Dahisar (E) Station \u2013 Mira Bhayander Station<br>(Extension of Line-7)<\/td><td>11.38 Km<\/td><td>8<\/td><td>Under Construction<\/td><\/tr><tr><td>Mumbai Metro Line-10<\/td><td>Green Line<\/td><td>Gaimukh \u2013 Shivaji Chowk in Mira Road<br>(Extension of Line-4)<\/td><td>9.20 Km<\/td><td>4<\/td><td>Approved Line<\/td><\/tr><tr><td>Mumbai Metro Line-11<\/td><td>Green Line<\/td><td>Wadala\u00a0\u00a0\u2013 Chhatrapati Shivaji Maharaj Terminus<br>(Extension of Line-4)<\/td><td>12.77 Km<\/td><td>10<\/td><td>Proposed<\/td><\/tr><tr><td>Mumbai Metro Line-12<\/td><td>Orange Line<\/td><td>Kalyan to Taloja<br>(Extension of Line-5)<\/td><td>20.7 Km<\/td><td>17<\/td><td>Proposed<\/td><\/tr><tr><td>Mumbai Metro Line-13<\/td><td>Purple Line<\/td><td>Shivaji Chowk (Mira Road) to Virar<\/td><td>23 Km<\/td><td>20<\/td><td>Proposed<\/td><\/tr><tr><td>Mumbai Metro Line-14<\/td><td>Magenta Line<\/td><td>Kanjurmarg to Badlapur<\/td><td>45 Km<\/td><td>40<\/td><td>Proposed<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"3_Operational_Metro_Lines_of_Mumbai_Metro\"><\/span><strong>3. Operational Metro Lines of Mumbai Metro<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The majority of the Mumbai Metro Corridors are currently in various stages of development. The Versova-Andheri-Ghatkopar, or Blue Line, is the sole line of the Mumbai metro that is currently in service as of March 2022. This is a comprehensive rundown of the Mumbai Metro&#8217;s many corridors.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"31_Mumbai_Metro_Route_%E2%80%93_Line_1_Blue_Line_Versova-Andheri-Ghatkopar_Route\"><\/span><strong>3.1) Mumbai Metro Route &#8211; Line 1: Blue Line : Versova-Andheri-Ghatkopar\u00a0Route<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Officials from the Mumbai Metropolitan Region Development Authority have stated that the metro on Mumbai Metro Line 1 is now travelling at 80 kmph instead of 65 kmph. The metro could carry eighteen extra passengers daily if it had increased passenger capacity.<\/p>\n\n\n\n<p><strong>Status &#8211;<\/strong> Operational<\/p>\n\n\n\n<p><strong>Length- <\/strong>11.4 km<\/p>\n\n\n\n<p><strong>Number of stations-<\/strong> 12<\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img decoding=\"async\" src=\"https:\/\/bigproperty.in\/blog\/\/wp-content\/uploads\/2023\/12\/pasted-image-0-1024x857.png\" alt=\"Versova-Andheri-Ghatkopar Route Map\" class=\"wp-image-12606\" width=\"618\" height=\"517\" srcset=\"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2023\/12\/pasted-image-0-1024x857.png 1024w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2023\/12\/pasted-image-0-300x251.png 300w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2023\/12\/pasted-image-0-768x643.png 768w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2023\/12\/pasted-image-0-696x583.png 696w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2023\/12\/pasted-image-0-502x420.png 502w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2023\/12\/pasted-image-0.png 1051w\" sizes=\"(max-width: 618px) 100vw, 618px\" \/><figcaption><em>Versova-Andheri-Ghatkopar\u00a0Route Map<\/em><\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"4_Mumbai_Metro_Stations_Line_1\"><\/span><strong>4. Mumbai Metro Stations Line 1<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Sr. No<\/strong><\/td><td><strong>Mumbai Metro Line 1 Stations<\/strong><\/td><\/tr><tr><td>1<\/td><td>Versova<\/td><\/tr><tr><td>2<\/td><td>D N Nagar<\/td><\/tr><tr><td>3<\/td><td>Azad Nagar<\/td><\/tr><tr><td>4<\/td><td>Andheri<\/td><\/tr><tr><td>5<\/td><td>Western Express Highway (WEH)<\/td><\/tr><tr><td>6<\/td><td>Chakala<\/td><\/tr><tr><td>7<\/td><td>Airport Road<\/td><\/tr><tr><td>8<\/td><td>Marol Naka<\/td><\/tr><tr><td>9<\/td><td>Saki Naka<\/td><\/tr><tr><td>10<\/td><td>Asalpha<\/td><\/tr><tr><td>11<\/td><td>Jagruti Nagar<\/td><\/tr><tr><td>12<\/td><td>Ghatkopar<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>The construction of <strong><em>Mumbai Metro Line 1,<\/em><\/strong> which runs from Versova to Ghatkopar, was estimated to have cost Rs 4,300 crore. Mumbai Metro&#8217;s Line 1 is completely elevated. Currently, Mumbai Metro One Operation Pvt Ltd is in charge of running it.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"5_Mumbai_Metro_Under_Construction_Lines\"><\/span><strong>5. Mumbai Metro Under Construction Lines<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The Mumbai metro&#8217;s lines listed below are being built and are in different phases of development.<\/p>\n\n\n\n<p><strong>Mumbai Metro Route &#8211; Line 2 (2A and 2B): Yellow Line: Dahisar to Mandale<\/strong><\/p>\n\n\n\n<p><strong>Status<\/strong>: Under Construction&nbsp;<\/p>\n\n\n\n<p><strong>Length-&nbsp;<\/strong>42 km<\/p>\n\n\n\n<p><strong>Number of stations-&nbsp;<\/strong>37 (2A-17, 2B-20)<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"6_Mumbai_Metro_Line_2_Stations\"><\/span><strong>6. Mumbai Metro Line 2 Stations<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>S. No<\/strong><\/td><td><strong>Mumbai Metro Stations Line 2A<\/strong><\/td><td><strong>Mumbai Metro Stations Line 2B<\/strong><\/td><\/tr><tr><td>1<\/td><td>Dahisar East<\/td><td>ESIC Nagar<\/td><\/tr><tr><td>2<\/td><td>Upper Dahisar Station (Anand Nagar)<\/td><td>Prem Nagar<\/td><\/tr><tr><td>3<\/td><td>Kandarpada (Rushi Sankul)<\/td><td>Indira Nagar<\/td><\/tr><tr><td>4<\/td><td>Mandapeshwar (IC Colony)<\/td><td>Nanavati Hospital<\/td><\/tr><tr><td>5<\/td><td>Eksar (LIC Colony)<\/td><td>Khira Nagar<\/td><\/tr><tr><td>6<\/td><td>Borivali West (Don Bosco)<\/td><td>Saraswat Nagar<\/td><\/tr><tr><td>7<\/td><td>Pahadi Eksar (Shimpoli, Shimpawali)<\/td><td>National College<\/td><\/tr><tr><td>8<\/td><td>Kandivali West (Mahavir Nagar)<\/td><td>Bandra Metro<\/td><\/tr><tr><td>9<\/td><td>Dahanukarwadi (Kamraj Nagar)<\/td><td>ITO Bandra Kurla Complex<\/td><\/tr><tr><td>10<\/td><td>Valnai (Charkop)<\/td><td>IL&amp;FS, Bandra Kurla Complex (BKC)<\/td><\/tr><tr><td>11<\/td><td>Malad West<\/td><td>MTNL, Bandra Kurla Complex (BKC)<\/td><\/tr><tr><td>12<\/td><td>Lower Malad (Kasturi Park)<\/td><td>SG Barve Marg<\/td><\/tr><tr><td>13<\/td><td>Pahadi Goregaon (Bangur Nagar)<\/td><td>Kurla East<\/td><\/tr><tr><td>14<\/td><td>Goregaon West<\/td><td>Eastern Express Highway (EEH)<\/td><\/tr><tr><td>15<\/td><td>Oshiwara (Adarsh Nagar)<\/td><td>Chembur<\/td><\/tr><tr><td>16<\/td><td>Lower Oshiwara (Shastri Nagar)<\/td><td>Diamond Garden<\/td><\/tr><tr><td>17<\/td><td>Andheri West\u00a0(D.N. Nagar)<\/td><td>Shivaji Chowk<\/td><\/tr><tr><td>18<\/td><td><\/td><td>BSNL<\/td><\/tr><tr><td>19<\/td><td><\/td><td>Mankhurd<\/td><\/tr><tr><td>20<\/td><td><\/td><td>Mandala<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"7_Mumbai_Metro_Line_3_Route_Cuffe_Parade_to_Aarey_Colony_Aqua-Line\"><\/span><strong>7. Mumbai Metro Line 3 Route: Cuffe Parade to Aarey Colony Aqua-Line<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img decoding=\"async\" src=\"https:\/\/bigproperty.in\/blog\/\/wp-content\/uploads\/2023\/12\/image2.png\" alt=\"Mumbai Metro Line3\" class=\"wp-image-12607\" width=\"570\" height=\"518\" srcset=\"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2023\/12\/image2.png 856w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2023\/12\/image2-300x273.png 300w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2023\/12\/image2-768x699.png 768w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2023\/12\/image2-696x633.png 696w, https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2023\/12\/image2-462x420.png 462w\" sizes=\"(max-width: 570px) 100vw, 570px\" \/><figcaption><em>Mumbai Metro Line3<\/em><\/figcaption><\/figure>\n\n\n\n<p><strong>Status:\u00a0<\/strong>Under Construction\u00a0<\/p>\n\n\n\n<p><strong>Length-&nbsp;<\/strong>33.5 km<\/p>\n\n\n\n<p><strong>Number of stations-&nbsp;<\/strong>27 stations<\/p>\n\n\n\n<p>An underground rail line called the <em><strong>Colaba-Bandra-SEEPZ <\/strong><\/em>Line is sometimes known as the <em><strong>Mumbai Metro Line 3<\/strong><\/em>, or the Mumbai Metro Aqua Line. The 33.5km route, which connects Cuffe Parade to Aarey Colony, has 27 stops.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button has-custom-width wp-block-button__width-50\"><a class=\"wp-block-button__link has-vivid-cyan-blue-to-vivid-purple-gradient-background has-background\" href=\"https:\/\/www.whatsapp.com\/channel\/0029VaAUFkA9sBIBNO1s1u1V\" target=\"_blank\" rel=\"noreferrer noopener\"><strong><em>Join Now On Our WhatsApp Channel<\/em><\/strong><\/a><\/div>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"8_Mumbai_Metro_Line_3_Stations\"><\/span><strong>8. Mumbai Metro Line 3 Stations<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>S. No<\/strong><\/td><td><strong>Mumbai Metro Line 3 (Aqua Line) Stations List<\/strong><\/td><\/tr><tr><td>1<\/td><td>Cuffe Parade<\/td><\/tr><tr><td>2<\/td><td>Vidhan Bhawan<\/td><\/tr><tr><td>3<\/td><td>Churchgate station<\/td><\/tr><tr><td>4<\/td><td>Hutatma Chowk Statin<\/td><\/tr><tr><td>5<\/td><td>CST Station<\/td><\/tr><tr><td>6<\/td><td>Kalbadevi<\/td><\/tr><tr><td>7<\/td><td>Girgaon Station<\/td><\/tr><tr><td>8<\/td><td>Grant Road<\/td><\/tr><tr><td>9<\/td><td>Mumbai Central<\/td><\/tr><tr><td>10<\/td><td>Mahalaxmi<\/td><\/tr><tr><td>11<\/td><td>Science Museum Station<\/td><\/tr><tr><td>12<\/td><td>Acharya Atrey Chowk<\/td><\/tr><tr><td>13<\/td><td>Worli<\/td><\/tr><tr><td>14<\/td><td>Siddhivinayak Temple<\/td><\/tr><tr><td>15<\/td><td>Dadar<\/td><\/tr><tr><td>16<\/td><td>Shitladevi Temple<\/td><\/tr><tr><td>17<\/td><td>Dharavi<\/td><\/tr><tr><td>18<\/td><td>Income Tax Office BKC<\/td><\/tr><tr><td>19<\/td><td>Vidyanagri<\/td><\/tr><tr><td>20<\/td><td>Santa Cruz Station<\/td><\/tr><tr><td>21<\/td><td>Mumbai Domestic Airport<\/td><\/tr><tr><td>22<\/td><td>Sahar Road<\/td><\/tr><tr><td>23<\/td><td>Mumbai International Airport<\/td><\/tr><tr><td>24<\/td><td>Marol Naka<\/td><\/tr><tr><td>25<\/td><td>MIDC Station<\/td><\/tr><tr><td>26<\/td><td>SEEPZ<\/td><\/tr><tr><td>27<\/td><td>Aarey Colony (At-grade)<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>Also Read: <strong><em><a href=\"https:\/\/bigproperty.in\/blog\/\/maharera-2024-updates-registration-registered-projects-agents\/\">Mumbai MahaRERA<\/a><\/em><\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"9_Mumbai_Metro_Route_%E2%80%93_Line_4_Green_Line_Wadala_to_Kasarvadavali\"><\/span><strong>9. Mumbai Metro Route &#8211; Line 4: Green Line : Wadala to Kasarvadavali<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong>Status:<\/strong>\u00a0Under Construction\u00a0<\/p>\n\n\n\n<p><strong>Length-&nbsp;<\/strong>33.3 km<\/p>\n\n\n\n<p><strong>Number of stations-&nbsp;<\/strong>32 stations<\/p>\n\n\n\n<p><strong>Mumbai Metro Stations Line 4<\/strong><\/p>\n\n\n\n<p>Wadala and Aarey Colony will be served by<em><strong><a href=\"https:\/\/en.wikipedia.org\/wiki\/Mumbai_Metro\"> Mumbai Metro<\/a><\/strong><\/em> Line 4, also known as the Green Line. The Mumbai Metro&#8217;s Greenline will pass through the following stations.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Mumbai Metro Stations on Green Line 4<\/strong><\/td><\/tr><tr><td>Kasarvadavali<\/td><td>Vijay Garden<\/td><td>Dongripada<\/td><td>Tikuji-ni-wadi<\/td><td>Manpada (Thane)<\/td><td>Kapurbawdi<\/td><td>Majiwada<\/td><td>Cadbury Junction<\/td><\/tr><tr><td>Mahapalika Marg<\/td><td>RTO Thane<\/td><td>Teen Haath Naka (Thane)<\/td><td>Mulund Naka<\/td><td>Mulund Fire Station<\/td><td>Sonapur<\/td><td>Shangrila<\/td><td>Bhandup<\/td><\/tr><tr><td>Bhandup Mahapalika<\/td><td>Naval Housing<\/td><td>Gandhi Nagar<\/td><td>Surya Nagar<\/td><td>Vikhroli<\/td><td>Godrej Company<\/td><td>Shreyas Cinema<\/td><td>Laxmi Nagar<\/td><\/tr><tr><td>Pant Nagar<\/td><td>Garodia Nagar<\/td><td>Amar Mahal Junction<\/td><td>Siddarth Colony<\/td><td>Suman Nagar<\/td><td>Anik Nagar Depot<\/td><td>Wadala Truck Terminal<\/td><td><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"10_Mumbai_Metro_Route_%E2%80%93_Line_5_Orange_Line_Thane-Bhiwandi-Kalyan\"><\/span><strong>10. Mumbai Metro Route &#8211; Line 5: Orange Line: Thane-Bhiwandi-Kalyan<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong>Status:\u00a0<\/strong>Under Construction\u00a0<\/p>\n\n\n\n<p><strong>Length-&nbsp;<\/strong>25 km<\/p>\n\n\n\n<p><strong>Number of stations-<\/strong>&nbsp;17 stations&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>11. Mumbai Metro Stations Line 6<\/strong><\/h3>\n\n\n\n<p>The Mumbai Metro Line 5, often known as the Orange Line, would connect Kalyan and Thane City. The Mumbai Metro&#8217;s orange line services the following stations.<\/p>\n\n\n\n<p>The anticipated construction cost of Mumbai Metro&#8217;s Orange Line 5 is Rs 8,417 crore. The orange line will span a distance of 25 km and be entirely elevated. Orange Line 5 will link with Metro Line 4 on the Wadala-Thane route and Metro Line 11 on the Taloja and Kalyan routes to enhance connectivity.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Line 6 of the Mumbai Metro Route: Pink Line on Lokhandwala-Janjurmarg, Jogeshwari<\/strong><\/h4>\n\n\n\n<p><strong>Status:<\/strong>\u00a0Under Construction\u00a0<\/p>\n\n\n\n<p><strong>Length-&nbsp;<\/strong>14.5 km<\/p>\n\n\n\n<p><strong>Number of stations-<\/strong>&nbsp;13 stations&nbsp;<\/p>\n\n\n\n<p><strong>Mumbai Metro Stations Line 6<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Sr. No<\/strong><strong><\/strong><\/td><td><strong>Mumbai Metro Line 6 Stations List<\/strong><\/td><\/tr><tr><td>1<\/td><td>Swami Samarth Nagar (Lokhandwala)<\/td><\/tr><tr><td>2<\/td><td>Adarsh Nagar<\/td><\/tr><tr><td>3<\/td><td>Jogeshwari West<\/td><\/tr><tr><td>4<\/td><td>JVLR Junction<\/td><\/tr><tr><td>5<\/td><td>Shyam Nagar<\/td><\/tr><tr><td>6<\/td><td>Mahakali Caves<\/td><\/tr><tr><td>7<\/td><td>SEEPZ Village<\/td><\/tr><tr><td>8<\/td><td>Saki Vihar Road<\/td><\/tr><tr><td>9<\/td><td>Rambaug (Powai)<\/td><\/tr><tr><td>10<\/td><td>Powai Lake<\/td><\/tr><tr><td>11<\/td><td>IIT Powai<\/td><\/tr><tr><td>12<\/td><td>Kanjurmarg West<\/td><\/tr><tr><td>13<\/td><td>Vikhroli EEH<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>Between Swami Samarth Nagar and the Kanjurmarg route will operate Mumbai Metro Line 6, often known as the Pink Line. The Jogeshwari-Vikhroli Link road will be mostly traversed by the Pink line, which will be entirely elevated. An estimated Rs 6716 crore would be spent on building the entire project.<\/p>\n\n\n\n<div class=\"wp-block-group has-background\" style=\"background-color:#aae3cc\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<h2 class=\"has-text-align-center wp-block-heading\"><span class=\"ez-toc-section\" id=\"Read_Also_Our_Articles\"><\/span><strong><span class=\"has-inline-color has-vivid-red-color\">Read Also Our Articles<\/span><\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-group has-background\" style=\"background-color:#e3e7ea\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\"><ul class=\"wp-block-latest-posts__list is-grid columns-3 wp-block-latest-posts\"><li><div class=\"wp-block-latest-posts__featured-image\"><a href=\"https:\/\/bigproperty.in\/blog\/rental-agreement-rules-india-notice-period-deposit-2026\/\" aria-label=\"Rental Agreement Rules 2026: Notice Period, Security Deposits &amp; Tenant Rights\"><img decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2026\/03\/unnamed-2-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail wp-post-image\" alt=\"rental agreement rules india\" style=\"\" \/><\/a><\/div><a class=\"wp-block-latest-posts__post-title\" href=\"https:\/\/bigproperty.in\/blog\/rental-agreement-rules-india-notice-period-deposit-2026\/\">Rental Agreement Rules 2026: Notice Period, Security Deposits &amp; Tenant Rights<\/a><\/li>\n<li><div class=\"wp-block-latest-posts__featured-image\"><a href=\"https:\/\/bigproperty.in\/blog\/tellapur-vs-kollur-real-estate-investment-comparison-2026\/\" aria-label=\"Tellapur vs. Kollur: Which is the Best Real Estate Investment in 2026?\"><img decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2026\/03\/tellapur-vs-kollur-real-estate-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail wp-post-image\" alt=\"tellapur vs kollur real estate\" style=\"\" \/><\/a><\/div><a class=\"wp-block-latest-posts__post-title\" href=\"https:\/\/bigproperty.in\/blog\/tellapur-vs-kollur-real-estate-investment-comparison-2026\/\">Tellapur vs. Kollur: Which is the Best Real Estate Investment in 2026?<\/a><\/li>\n<li><div class=\"wp-block-latest-posts__featured-image\"><a href=\"https:\/\/bigproperty.in\/blog\/low-budget-middle-class-indian-bedroom-design-ideas\/\" aria-label=\"15 Low-Budget Middle Class Indian Bedroom Design Ideas (2026)\"><img decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2026\/03\/unnamed-1-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail wp-post-image\" alt=\"low budget middle class indian bedroom design\" style=\"\" \/><\/a><\/div><a class=\"wp-block-latest-posts__post-title\" href=\"https:\/\/bigproperty.in\/blog\/low-budget-middle-class-indian-bedroom-design-ideas\/\">15 Low-Budget Middle Class Indian Bedroom Design Ideas (2026)<\/a><\/li>\n<\/ul><\/div><\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"12_Mumbai_Metro_Route_Dahisar_East_to_Mumbai_Airport_%E2%80%93_Lines_7_and_7A_Red_Line\"><\/span><strong>12. Mumbai Metro Route: Dahisar East to Mumbai Airport &#8211; Lines 7 and 7A: Red Line<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong>Status:<\/strong>\u00a0Under Construction\u00a0<\/p>\n\n\n\n<p><strong>Length-&nbsp;<\/strong>33.5 km<\/p>\n\n\n\n<p><strong>Number of stations-&nbsp;<\/strong>16 stations&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"13_Mumbai_Metro_Line_7_Stations\"><\/span><strong>13. Mumbai Metro Line 7 Stations<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Mumbai Metro Red Line (7 &amp; 7A) Stations&nbsp;<\/strong><\/td><\/tr><tr><td>Dahisar East<\/td><td>Ovaripada<\/td><td>National Park<\/td><\/tr><tr><td>Devipada<\/td><td>Magathane<\/td><td>Mahindra and Mahindra<\/td><\/tr><tr><td>Bandongri<\/td><td>Kurar Village<\/td><td>Dindoshi<\/td><\/tr><tr><td>Aarey Road Junction<\/td><td>Mahanand (Goregaon East)<\/td><td>JVLR Junction<\/td><\/tr><tr><td>Shankarwadi\/Mogarpada<\/td><td>Andheri East (Gundavali)<\/td><td>Airport Colony (7A)<\/td><\/tr><tr><td>CSMIA T2 (7A)<\/td><td><\/td><td><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>The Red Line will be more than 33.5 kilometers long overall. The red line, which connects Mumbai&#8217;s international airport, would be beneficial for commuters traveling from all around the city.<\/p>\n\n\n\n<p>On January 19, 2023, Prime Minister Narendra Modi officially opened Metro Line 7. The public might use the queue as of January 20, 2023. It has covered the roughly 16.5 km gap between Andheri East and Dahisar East while reducing traffic on the Western Express Highway and Link Road.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"14_Mumbai_Metro_Route_%E2%80%93_Line_8_CSIA_to_NMIA_Airport_Connector_on_the_Gold_Line\"><\/span><strong>14. Mumbai Metro Route &#8211; Line 8: CSIA to NMIA (Airport Connector) on the Gold Line<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The Gold Line would link the Navi Mumbai Airports and the International Airport of Mumbai once it becomes operational. It is one of the most ambitious and futuristic metro lines. This connectivity project would take more than Rs 15,000 crore to complete. There will be more than eight metro stations throughout the Gold Line&#8217;s whole itinerary.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Mumbai Metro Route &#8211; Line 9: Red Line (Under Construction) from Dahisar East to Mira-Bhayander<\/strong><\/h4>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Mumbai Metro Red Line 9 Stations<\/strong><\/td><\/tr><tr><td>Dahisar East<\/td><td>Pandhurang Wadi<\/td><td>Amar Palace<\/td><td>Zankar Company<\/td><\/tr><tr><td>Sai Baba Nagar<\/td><td>Deepak Hospital<\/td><td>Shaheed Bhagat Singh Garden<\/td><td>Subhash Chandra Bose Station<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>There will be more than eight stations along this Mumbai metro section, all of which will be elevated. The anticipated total cost of the red line length is around Rs 6,518 crore.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>15. Mumbai Metro Route: Lines 10, 11, and (Red Line 4 Extension)<\/strong><\/h3>\n\n\n\n<p>Mumbai Metro Line 4 is extended by Mumbai Metro Lines 10 and 11. The projected Red Line 10, also known as Red Line, will link Shivaji Chowk on Mira Road with the Gaimukh region. There will be nine metro stations throughout a 9 km section of it. The anticipated cost of building Metro line 10 is Rs 5,000 crore.<\/p>\n\n\n\n<p>In the same vein, Wadala and the CSMT region will be linked by red Line 11. There will be about 11 metro stations along this 12.7-kilometre route. The estimated cost of developing this stretch is Rs 8,739 crore.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>16. Orange Line, Mumbai Metro Route &#8211; Line 12<\/strong><\/h3>\n\n\n\n<p>The Mumbai Metro Line 5 (Orange Line) will be extended to include this Mumbai metro segment. Line 12 will go from Taloja to the city of Kalyan. In the Mumbai Metropolitan Area, last-mile connection will be guaranteed via this route.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>17. Purple Line, Mumbai Metro Route &#8211; Line 13<\/strong><\/h3>\n\n\n\n<p>This metro segment will link Mira Bhayander with the Virar region. The estimated cost of construction for the more than 23-kilometre-long length is Rs 6900 crore. The Purple Line metro will be the name given to it. For the section, the number of stations has not yet been determined.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>18. Mumbai Metro: Magenta Line, Line 14<\/strong><\/h3>\n\n\n\n<p>A planned metro line called Mumbai Metro Line 14 will link Mumbai&#8217;s Vikhroli neighborhood with Kanjurmarg. It would link Mumbai with the areas outside of Thane and reach the Ambernath-Badlapur region. The anticipated cost of completing the stretch is Rs 13,500 crore.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>19. Navi Mumbai Metro<\/strong><\/h3>\n\n\n\n<p>The Navi Mumbai metro project is being constructed and managed by the City and Industrial Development Corporation (CIDCO) as part of the rapid transit system for the Navi Mumbai region. The 23-kilometer-long Navi Mumbai metro line would include 20 metro stations. The total cost of the project would be Rs. 4,163 crores.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>20. Andheri Metro Station and Route<\/strong><\/h3>\n\n\n\n<p>Andheri Metro Station serves as a major hub for commuters, facilitating easy access to both Line 1 and Line 2A. Understanding the Andheri Metro Station route is essential for those navigating through the city, as it serves as a crucial interchange point.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>21. Metro 2A Line: Connecting DN Nagar to Dahisar<\/strong><\/h3>\n\n\n\n<p>Metro Line 2A is a vital link in Mumbai&#8217;s metro system, connecting DN Nagar to Dahisar. This line plays a pivotal role in easing congestion and providing a swift commute for residents along its route. From Andheri Metro Station to Ghatkopar Metro Station, Line 2A covers key areas, making it a popular choice for daily commuters.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>22. Ghatkopar Metro: A Gateway to the Eastern Suburbs<\/strong><\/h3>\n\n\n\n<p>Ghatkopar Metro Station, situated on Line 1, serves as a gateway to the eastern suburbs of Mumbai. Understanding the Ghatkopar Metro route and timings is essential for those residing or working in this bustling part of the city.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>23. Jagruti Nagar and Lokmanya Tilak Metro Stations<\/strong><\/h3>\n\n\n\n<p>Exploring Line 1 of the Mumbai Metro introduces us to key stations like Jagruti Nagar and Lokmanya Tilak Metro Station. These stations contribute to the seamless connectivity of the metro network, catering to the diverse needs of Mumbai&#8217;s populace.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>24. The Future of Mumbai Metro: Maha Mumbai Metro<\/strong><\/h3>\n\n\n\n<p>As Mumbai continues to grow, so does its metro network. The Maha Mumbai Metro project is an ambitious initiative set to expand the metro system further, enhancing connectivity and making travel even more convenient for the city&#8217;s residents.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Frequently Asked Questions (FAQ&#8217;s)<\/strong><\/h3>\n\n\n\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-1701846239831\"><strong class=\"schema-faq-question\">1Q: When did the Mumbai Metro start operating?<\/strong> <p class=\"schema-faq-answer\"><strong><em>Ans: <\/em><\/strong>The Mumbai Metro Started on June 8, 2014.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1701846356779\"><strong class=\"schema-faq-question\">2Q: How many stations does Mumbai Metro Line 1 have?<\/strong> <p class=\"schema-faq-answer\"><strong><em>Ans:<\/em><\/strong> There are 12 stations in Mumbai metro line 2.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1701846548454\"><strong class=\"schema-faq-question\">3Q: What is the Total Length of the Mumbai Metro Line 1 (Blue Line)?<\/strong> <p class=\"schema-faq-answer\"><strong><em>Ans:<\/em><\/strong> 11.4 km is the Total Length of the Mumbai Metro Line 1 (Blue Line).<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1701846670280\"><strong class=\"schema-faq-question\">4Q: What is the Total Length of the Mumbai Metro Line 4 (Green Line)?<\/strong> <p class=\"schema-faq-answer\"><strong><em>Ans:<\/em><\/strong> 33.3km is the Total Length of the Mumbai Metro Line 4 (Green Line).<\/p> <\/div> <\/div>\n\n\n\n<div class=\"wp-block-group has-background\" style=\"background-color:#9cd3bd\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<h2 class=\"has-text-align-center wp-block-heading\"><span class=\"ez-toc-section\" id=\"Latest_Posts\"><\/span><strong><span class=\"has-inline-color has-vivid-red-color\">Latest Posts<\/span><\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-group has-background\" style=\"background-color:#e3e9ed\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\"><ul class=\"wp-block-latest-posts__list is-grid columns-3 wp-block-latest-posts\"><li><div class=\"wp-block-latest-posts__featured-image\"><a href=\"https:\/\/bigproperty.in\/blog\/thalapathy-vijay-house-inside-photos-address-and-net-worth\/\" aria-label=\"\u00a0 Thalapathy Vijay House: Inside photos, Address,      and Net Worth\"><img decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/Untitled-design-13-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail wp-post-image\" alt=\"\" style=\"\" \/><\/a><\/div><a class=\"wp-block-latest-posts__post-title\" href=\"https:\/\/bigproperty.in\/blog\/thalapathy-vijay-house-inside-photos-address-and-net-worth\/\">\u00a0 Thalapathy Vijay House: Inside photos, Address,      and Net Worth<\/a><\/li>\n<li><div class=\"wp-block-latest-posts__featured-image\"><a href=\"https:\/\/bigproperty.in\/blog\/12-vastu-plants-to-energize-your-home-and-bring-positive-energy\/\" aria-label=\"\u00a012 Vastu Plants to Energize Your Home and Bring Positive Energy\"><img decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/Untitled-design-7-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail wp-post-image\" alt=\"\" style=\"\" \/><\/a><\/div><a class=\"wp-block-latest-posts__post-title\" href=\"https:\/\/bigproperty.in\/blog\/12-vastu-plants-to-energize-your-home-and-bring-positive-energy\/\">\u00a012 Vastu Plants to Energize Your Home and Bring Positive Energy<\/a><\/li>\n<li><div class=\"wp-block-latest-posts__featured-image\"><a href=\"https:\/\/bigproperty.in\/blog\/creating-a-balanced-home-the-five-elements-of-vastu-shastra-explained\/\" aria-label=\"\u00a0Creating a Balanced Home: The Five Elements of Vastu Shastra Explained\"><img decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2024\/07\/Balancing-the-Five-Elements-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail wp-post-image\" alt=\"Five elements of vastu\" style=\"\" \/><\/a><\/div><a class=\"wp-block-latest-posts__post-title\" href=\"https:\/\/bigproperty.in\/blog\/creating-a-balanced-home-the-five-elements-of-vastu-shastra-explained\/\">\u00a0Creating a Balanced Home: The Five Elements of Vastu Shastra Explained<\/a><\/li>\n<\/ul><\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>1. Introduction On Mumbai Metro The Maharashtra government&#8217;s ambitious and expansive infrastructure project is the Mumbai metro. The Mumbai metro will offer smooth, reasonably priced, and all-inclusive connection options to its residents once it is completely operating. The Mumbai metro project is being carried out by the Mumbai Metropolitan Development Authority (MMRDA). On the other [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":12608,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[18,2951],"tags":[3540,3541,3542,3543,3544,3545,3546,3548,3547,3549,3550,3551,3552,3554,3553,3555,3557,3556,3558,3559,3560,3561,3562,3563,3539,3565,3537,3566,3538,3564],"class_list":{"0":"post-12603","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-locality-news","8":"category-maharashtra","9":"tag-2a-and-7-metro-line","10":"tag-2a-metro-line","11":"tag-all-mumbai-metro-lines","12":"tag-andheri-metro-station","13":"tag-andheri-metro-station-route","14":"tag-app-for-mumbai-metro","15":"tag-book-mumbai-metro-ticket-online","16":"tag-dn-nagar-to-ghatkopar-metro-time","17":"tag-ghatkopar-metro","18":"tag-ghatkopar-metro-route","19":"tag-ghatkopar-metro-station","20":"tag-ghatkopar-metro-timings","21":"tag-huda-city-center","22":"tag-jagruti-nagar-metro-station","23":"tag-last-metro-from-versova","24":"tag-line-1-mumbai-metro","25":"tag-link-road-metro-route","26":"tag-lokmanya-tilak-metro-station","27":"tag-maha-mumbai-metro","28":"tag-maha-mumbai-metro-map","29":"tag-malad-metro-route","30":"tag-map-of-metro-in-mumbai","31":"tag-metro-2a","32":"tag-metro-2a-and-7-route","33":"tag-mumbai-metro-fares","34":"tag-mumbai-metro-green-line","35":"tag-mumbai-metro-map","36":"tag-mumbai-metro-red-line","37":"tag-mumbai-metro-timings","38":"tag-red-line-metro-mumbai"},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Mumbai Metro Updates 2024 : New Routes, Maps, Stations List, Lines<\/title>\n<meta name=\"description\" content=\"The ambitious Mumbai Metro Line project will enhance last-mile and intracity connectivity in Mumbai. View the Mumbai metro map, routes\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Mumbai Metro Updates 2024 : New Routes, Maps, Stations List, Lines\" \/>\n<meta property=\"og:description\" content=\"The ambitious Mumbai Metro Line project will enhance last-mile and intracity connectivity in Mumbai. View the Mumbai metro map, routes\" \/>\n<meta property=\"og:url\" content=\"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/\" \/>\n<meta property=\"og:site_name\" content=\"indias Real estate latest News Updates\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/bigpropertyofficial\/\" \/>\n<meta property=\"article:published_time\" content=\"2023-12-06T07:30:13+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-12-06T07:30:15+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2023\/12\/Navi-Mumbai-metro-Cidco.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"598\" \/>\n\t<meta property=\"og:image:height\" content=\"366\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"sai krishna\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\\\/\"},\"author\":{\"name\":\"sai krishna\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#\\\/schema\\\/person\\\/c8d91bcc5e68b3665ffe9d23da07b832\"},\"headline\":\"Mumbai Metro Updates 2024: New Routes, Maps, Stations List, Lines\",\"datePublished\":\"2023-12-06T07:30:13+00:00\",\"dateModified\":\"2023-12-06T07:30:15+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\\\/\"},\"wordCount\":2245,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/12\\\/Navi-Mumbai-metro-Cidco.jpg\",\"keywords\":[\"2a and 7 metro line\",\"2a metro line\",\"all mumbai metro lines\",\"andheri metro station\",\"andheri metro station route\",\"app for mumbai metro\",\"book mumbai metro ticket online\",\"dn nagar to ghatkopar metro time\",\"ghatkopar metro\",\"ghatkopar metro route\",\"ghatkopar metro station\",\"ghatkopar metro timings\",\"huda city center\",\"jagruti nagar metro station\",\"last metro from versova\",\"line 1 mumbai metro\",\"link road metro route\",\"lokmanya tilak metro station\",\"maha mumbai metro\",\"maha mumbai metro map\",\"malad metro route\",\"map of metro in mumbai\",\"metro 2a\",\"metro 2a and 7 route\",\"mumbai metro fares\",\"mumbai metro green line\",\"mumbai metro map\",\"mumbai metro red line\",\"mumbai metro timings\",\"red line metro mumbai\"],\"articleSection\":[\"Locality news\",\"Maharashtra\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\\\/#respond\"]}]},{\"@type\":[\"WebPage\",\"FAQPage\"],\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\\\/\",\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\\\/\",\"name\":\"Mumbai Metro Updates 2024 : New Routes, Maps, Stations List, Lines\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/12\\\/Navi-Mumbai-metro-Cidco.jpg\",\"datePublished\":\"2023-12-06T07:30:13+00:00\",\"dateModified\":\"2023-12-06T07:30:15+00:00\",\"description\":\"The ambitious Mumbai Metro Line project will enhance last-mile and intracity connectivity in Mumbai. View the Mumbai metro map, routes\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\\\/#breadcrumb\"},\"mainEntity\":[{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\\\/#faq-question-1701846239831\"},{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\\\/#faq-question-1701846356779\"},{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\\\/#faq-question-1701846548454\"},{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\\\/#faq-question-1701846670280\"}],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\\\/#primaryimage\",\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/12\\\/Navi-Mumbai-metro-Cidco.jpg\",\"contentUrl\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/12\\\/Navi-Mumbai-metro-Cidco.jpg\",\"width\":598,\"height\":366,\"caption\":\"mumbai metro map\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Mumbai Metro Updates 2024: New Routes, Maps, Stations List, Lines\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/\",\"name\":\"India's Real Estate Property Site Buy Sell rent properties portal\",\"description\":\"real estate news updates property portal\",\"publisher\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#organization\",\"name\":\"BIG PROPERTY\",\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/10\\\/BIG-PROPERTY-designed-by-sbvrgroups.in-fotter.png\",\"contentUrl\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/10\\\/BIG-PROPERTY-designed-by-sbvrgroups.in-fotter.png\",\"width\":138,\"height\":50,\"caption\":\"BIG PROPERTY\"},\"image\":{\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/bigpropertyofficial\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/#\\\/schema\\\/person\\\/c8d91bcc5e68b3665ffe9d23da07b832\",\"name\":\"sai krishna\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/litespeed\\\/avatar\\\/a820cae1f6295126ae8f700f2b04964d.jpg?ver=1775648023\",\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/litespeed\\\/avatar\\\/a820cae1f6295126ae8f700f2b04964d.jpg?ver=1775648023\",\"contentUrl\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/wp-content\\\/litespeed\\\/avatar\\\/a820cae1f6295126ae8f700f2b04964d.jpg?ver=1775648023\",\"caption\":\"sai krishna\"},\"description\":\"Sai Krishna is a seasoned content management specialist with a rich professional journey exceeding 3 years. Sai Krishna's expertise traverses various realms, from real estate and finance to business, health, taxation, education, and beyond. Passionate about staying abreast of India's evolving real estate landscape, Sai Krishna's interests extend to reading and exploring new destinations.\\\"\",\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/author\\\/sai-krishna\\\/\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\\\/#faq-question-1701846239831\",\"position\":1,\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\\\/#faq-question-1701846239831\",\"name\":\"1Q: When did the Mumbai Metro start operating?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"<strong><em>Ans: <\\\/em><\\\/strong>The Mumbai Metro Started on June 8, 2014.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\\\/#faq-question-1701846356779\",\"position\":2,\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\\\/#faq-question-1701846356779\",\"name\":\"2Q: How many stations does Mumbai Metro Line 1 have?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"<strong><em>Ans:<\\\/em><\\\/strong> There are 12 stations in Mumbai metro line 2.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\\\/#faq-question-1701846548454\",\"position\":3,\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\\\/#faq-question-1701846548454\",\"name\":\"3Q: What is the Total Length of the Mumbai Metro Line 1 (Blue Line)?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"<strong><em>Ans:<\\\/em><\\\/strong> 11.4 km is the Total Length of the Mumbai Metro Line 1 (Blue Line).\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\\\/#faq-question-1701846670280\",\"position\":4,\"url\":\"https:\\\/\\\/bigproperty.in\\\/blog\\\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\\\/#faq-question-1701846670280\",\"name\":\"4Q: What is the Total Length of the Mumbai Metro Line 4 (Green Line)?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"<strong><em>Ans:<\\\/em><\\\/strong> 33.3km is the Total Length of the Mumbai Metro Line 4 (Green Line).\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Mumbai Metro Updates 2024 : New Routes, Maps, Stations List, Lines","description":"The ambitious Mumbai Metro Line project will enhance last-mile and intracity connectivity in Mumbai. View the Mumbai metro map, routes","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/","og_locale":"en_US","og_type":"article","og_title":"Mumbai Metro Updates 2024 : New Routes, Maps, Stations List, Lines","og_description":"The ambitious Mumbai Metro Line project will enhance last-mile and intracity connectivity in Mumbai. View the Mumbai metro map, routes","og_url":"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/","og_site_name":"indias Real estate latest News Updates","article_publisher":"https:\/\/www.facebook.com\/bigpropertyofficial\/","article_published_time":"2023-12-06T07:30:13+00:00","article_modified_time":"2023-12-06T07:30:15+00:00","og_image":[{"width":598,"height":366,"url":"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2023\/12\/Navi-Mumbai-metro-Cidco.jpg","type":"image\/jpeg"}],"author":"sai krishna","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#article","isPartOf":{"@id":"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/"},"author":{"name":"sai krishna","@id":"https:\/\/bigproperty.in\/blog\/#\/schema\/person\/c8d91bcc5e68b3665ffe9d23da07b832"},"headline":"Mumbai Metro Updates 2024: New Routes, Maps, Stations List, Lines","datePublished":"2023-12-06T07:30:13+00:00","dateModified":"2023-12-06T07:30:15+00:00","mainEntityOfPage":{"@id":"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/"},"wordCount":2245,"commentCount":0,"publisher":{"@id":"https:\/\/bigproperty.in\/blog\/#organization"},"image":{"@id":"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#primaryimage"},"thumbnailUrl":"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2023\/12\/Navi-Mumbai-metro-Cidco.jpg","keywords":["2a and 7 metro line","2a metro line","all mumbai metro lines","andheri metro station","andheri metro station route","app for mumbai metro","book mumbai metro ticket online","dn nagar to ghatkopar metro time","ghatkopar metro","ghatkopar metro route","ghatkopar metro station","ghatkopar metro timings","huda city center","jagruti nagar metro station","last metro from versova","line 1 mumbai metro","link road metro route","lokmanya tilak metro station","maha mumbai metro","maha mumbai metro map","malad metro route","map of metro in mumbai","metro 2a","metro 2a and 7 route","mumbai metro fares","mumbai metro green line","mumbai metro map","mumbai metro red line","mumbai metro timings","red line metro mumbai"],"articleSection":["Locality news","Maharashtra"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#respond"]}]},{"@type":["WebPage","FAQPage"],"@id":"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/","url":"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/","name":"Mumbai Metro Updates 2024 : New Routes, Maps, Stations List, Lines","isPartOf":{"@id":"https:\/\/bigproperty.in\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#primaryimage"},"image":{"@id":"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#primaryimage"},"thumbnailUrl":"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2023\/12\/Navi-Mumbai-metro-Cidco.jpg","datePublished":"2023-12-06T07:30:13+00:00","dateModified":"2023-12-06T07:30:15+00:00","description":"The ambitious Mumbai Metro Line project will enhance last-mile and intracity connectivity in Mumbai. View the Mumbai metro map, routes","breadcrumb":{"@id":"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#breadcrumb"},"mainEntity":[{"@id":"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#faq-question-1701846239831"},{"@id":"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#faq-question-1701846356779"},{"@id":"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#faq-question-1701846548454"},{"@id":"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#faq-question-1701846670280"}],"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#primaryimage","url":"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2023\/12\/Navi-Mumbai-metro-Cidco.jpg","contentUrl":"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2023\/12\/Navi-Mumbai-metro-Cidco.jpg","width":598,"height":366,"caption":"mumbai metro map"},{"@type":"BreadcrumbList","@id":"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/bigproperty.in\/blog\/"},{"@type":"ListItem","position":2,"name":"Mumbai Metro Updates 2024: New Routes, Maps, Stations List, Lines"}]},{"@type":"WebSite","@id":"https:\/\/bigproperty.in\/blog\/#website","url":"https:\/\/bigproperty.in\/blog\/","name":"India's Real Estate Property Site Buy Sell rent properties portal","description":"real estate news updates property portal","publisher":{"@id":"https:\/\/bigproperty.in\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/bigproperty.in\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/bigproperty.in\/blog\/#organization","name":"BIG PROPERTY","url":"https:\/\/bigproperty.in\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/bigproperty.in\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2020\/10\/BIG-PROPERTY-designed-by-sbvrgroups.in-fotter.png","contentUrl":"https:\/\/bigproperty.in\/blog\/wp-content\/uploads\/2020\/10\/BIG-PROPERTY-designed-by-sbvrgroups.in-fotter.png","width":138,"height":50,"caption":"BIG PROPERTY"},"image":{"@id":"https:\/\/bigproperty.in\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/bigpropertyofficial\/"]},{"@type":"Person","@id":"https:\/\/bigproperty.in\/blog\/#\/schema\/person\/c8d91bcc5e68b3665ffe9d23da07b832","name":"sai krishna","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/bigproperty.in\/blog\/wp-content\/litespeed\/avatar\/a820cae1f6295126ae8f700f2b04964d.jpg?ver=1775648023","url":"https:\/\/bigproperty.in\/blog\/wp-content\/litespeed\/avatar\/a820cae1f6295126ae8f700f2b04964d.jpg?ver=1775648023","contentUrl":"https:\/\/bigproperty.in\/blog\/wp-content\/litespeed\/avatar\/a820cae1f6295126ae8f700f2b04964d.jpg?ver=1775648023","caption":"sai krishna"},"description":"Sai Krishna is a seasoned content management specialist with a rich professional journey exceeding 3 years. Sai Krishna's expertise traverses various realms, from real estate and finance to business, health, taxation, education, and beyond. Passionate about staying abreast of India's evolving real estate landscape, Sai Krishna's interests extend to reading and exploring new destinations.\"","url":"https:\/\/bigproperty.in\/blog\/author\/sai-krishna\/"},{"@type":"Question","@id":"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#faq-question-1701846239831","position":1,"url":"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#faq-question-1701846239831","name":"1Q: When did the Mumbai Metro start operating?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"<strong><em>Ans: <\/em><\/strong>The Mumbai Metro Started on June 8, 2014.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#faq-question-1701846356779","position":2,"url":"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#faq-question-1701846356779","name":"2Q: How many stations does Mumbai Metro Line 1 have?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"<strong><em>Ans:<\/em><\/strong> There are 12 stations in Mumbai metro line 2.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#faq-question-1701846548454","position":3,"url":"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#faq-question-1701846548454","name":"3Q: What is the Total Length of the Mumbai Metro Line 1 (Blue Line)?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"<strong><em>Ans:<\/em><\/strong> 11.4 km is the Total Length of the Mumbai Metro Line 1 (Blue Line).","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#faq-question-1701846670280","position":4,"url":"https:\/\/bigproperty.in\/blog\/mumbai-metro-updates-2024-new-routes-maps-stations-list-lines\/#faq-question-1701846670280","name":"4Q: What is the Total Length of the Mumbai Metro Line 4 (Green Line)?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"<strong><em>Ans:<\/em><\/strong> 33.3km is the Total Length of the Mumbai Metro Line 4 (Green Line).","inLanguage":"en-US"},"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/posts\/12603","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/comments?post=12603"}],"version-history":[{"count":2,"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/posts\/12603\/revisions"}],"predecessor-version":[{"id":12609,"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/posts\/12603\/revisions\/12609"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/media\/12608"}],"wp:attachment":[{"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/media?parent=12603"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/categories?post=12603"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bigproperty.in\/blog\/wp-json\/wp\/v2\/tags?post=12603"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}