New Bengaluru Metro Yellow Line: Stations, Operating Hours, and Economic Impact”

0
169

The Bangalore Metro, also known as Namma Metro, continues to evolve with ongoing expansions and new lines designed to enhance the city’s urban mobility. Among these developments, the Bengaluru metro Yellow Line extension stands out as a crucial project poised to reshape Bengaluru’s transportation landscape. This comprehensive article delves into the details of the Bengaluru metro Yellow Line, its significance, benefits, and its impact on the city.

Latest updates

The Bangalore Metro Rail Corporation Limited (BMRCL), which oversees Bengaluru’s Namma Metro, has announced the upcoming inauguration of the Bangalore Yellow Line by the end of this year. This significant development will feature at least eight trains running at 15-minute intervals, a notable improvement from the initial plan of six to seven trains at 20-minute intervals, according to a report by the Deccan Herald.

Yellow line bangalore Project Overview:

The Bengaluru Metro Yellow Line project, with a budget of ₹5,745 crore, spans 19.15 kilometers from RV Road to Bommasandra. The major civil and system works for this extensive project are nearing completion. This line will encompass 16 strategically placed stations, including prominent stops such as Jayadeva Hospital, BTM Layout, Silk Board Junction, and Electronics City.

Key Stations and Features:

One of the standout stations on the Yellow Line is Jayadeva Hospital, which will serve as an interchange hub. Remarkably, it will be India’s tallest metro station, standing at 39 meters with a six-level structure. This comprehensive design includes an underpass, road, flyover, Yellow Line platform, concourse, and a Pink Line platform, ensuring seamless connectivity for commuters.

Trial Operations and Launch: Namma Metro Yellow line

The BMRCL commenced full-scale trial operations on the Yellow Line on June 13, using a prototype six-coach train that was imported from China earlier this year.. These trial runs, which include oscillation and safety tests, are expected to conclude by September or October. If the required number of trains are available, commercial services on the Bengaluru Metro Yellow Line are anticipated to commence in December.

China’s CRRC Nanjing Puzhen Co Ltd has been contracted to supply 216 coaches (36 trains) to the Bangalore Metro Rail Corporation Limited (BMRCL) at a cost of Rs 1,578 crore. While the first twelve coaches are manufactured in China, the remaining coaches are being assembled in India by CRRC’s local partner, Titagarh Rail System Ltd (TRSL), based in Bengal. TRSL commenced production on May 18.

BMRCL Managing Director M Maheshwar Rao stated that the first six-coach train from TRSL is expected to arrive in Bengaluru between August 10 and 15.

Per the agreement, CRRC-TRSL is scheduled to deliver two trains every month following the initial delivery. Adhering to this timeline, BMRCL expects to receive two trains each month from September to December, aligning with the projected December deadline for the Yellow Line’s operational commencement.

Impact on Bengaluru’s Transit System:

The launch of the Yellow Line bangalore is poised to significantly enhance Bengaluru’s metro network, providing efficient and reliable transit options for residents. With reduced travel times and improved connectivity across key areas, the Bangalore metro Yellow Line is set to alleviate traffic congestion and contribute to the city’s sustainable urban development goals.

Quick Facts About Bangalore Metro Yellow Line

FeatureDetails
Project Cost₹5,745 crore
Total Length19.15 kilometers
Number of Stations16
Major StationsJayadeva Hospital, BTM Layout, Silk Board Junction, Electronics City
Operating Hours5 AM to 11 PM daily
Peak Hour Frequency4 to 6 minutes
Non-Peak Hour Frequency10 to 15 minutes
Trial Operations BeganJune 13, 2024
Commercial Operations StartExpected in December 2024
Key FeatureJayadeva Hospital Station, tallest metro station in India at 39 meters
Expected BenefitsReduced travel times, improved connectivity, economic growth

Future Prospects:

As the Yellow Line becomes operational, it will not only transform daily commutes but also stimulate economic growth by improving access to business districts and commercial hubs. The BMRCL’s commitment to expanding and upgrading the metro network underscores the ongoing efforts to meet the transportation needs of Bengaluru’s growing population.

For residents and visitors alike, the Yellow Line represents a crucial step toward a more connected and sustainable future for Bengaluru.

Bengaluru Metro yellow line: stations

Station NamePhaseLayoutKey FeatureNearby Landmark
Rashtriya Vidyalaya RoadPhase 2ElevatedClose to educational institutionsRV College
RagiguddaPhase 2ElevatedPopular for Ragigudda TempleRagigudda Temple
Jayadeva HospitalPhase 2ElevatedTallest metro station in IndiaJayadeva Hospital
BTM LayoutPhase 2ElevatedHub for residential and commercialBTM Layout
Central Silk BoardPhase 1ElevatedMajor traffic junctionSilk Board Junction
BommanahalliPhase 1ElevatedProximity to tech companiesTech parks
HongasandraPhase 1ElevatedResidential areaHongasandra
Kudlu GatePhase 1ElevatedNear industrial zoneKudlu Gate
SingasandraPhase 1ElevatedFast-growing residential localitySingasandra
Hosa RoadPhase 1ElevatedConnects to outer ring roadHosa Road
Beratena AgraharaPhase 1ElevatedNear Electronic City Phase 2Beratena Agrahara
Konappana AgraharaPhase 1ElevatedIT hubElectronic City Phase 1
Electronic CityPhase 1ElevatedHeart of IT corridorInfosys, Wipro campuses
Huskuru RoadPhase 1ElevatedAccess to residential areasHuskuru Road
HebbagodiPhase 1ElevatedEmerging residential hubHebbagodi
BommasandraPhase 1ElevatedIndustrial and residential areaBommasandra Industrial Area

Bangalore Metro Yellow Line Operating Hours and Frequency

The Bangalore Metro Yellow Line will operate daily from 5 AM to 11 PM. During peak hours, the trains will run with a frequency of every four to six minutes, ensuring minimal wait times for commuters. In non-peak hours, the frequency will be adjusted to intervals of 10 to 15 minutes.

Weekend and Holiday Schedules

On weekends and public holidays, the Yellow Line’s schedule may vary. For the most current information on timings during these periods, passengers are advised to check updates from the Bangalore Metro Rail Corporation Limited (BMRCL) on their official website or social media channels.

Fare charges

The fare structure for the Bangalore Yellow Line will follow the distance-based system implemented across the Namma Metro network. Here’s what you can expect:

  • Minimum Fare: The minimum fare is likely to be ₹10, applicable for trips up to 2 kilometers.
  • Maximum Fare: For longer distances exceeding 24 kilometers, the maximum fare is expected to be ₹60.

Frequently Asked Questions:

1. What is the Bangalore Metro Yellow Line?

The Yellow Line is an extension of the Namma Metro network in Bengaluru, running from RV Road to Bommasandra. It spans 19.15 kilometers and includes 16 stations.

2. When is the Yellow Line expected to open?

The Yellow Line is anticipated to commence commercial operations in December 2024, following the completion of trial runs and final preparations.

3. What are the operating hours of the Yellow Line?

The Yellow Line will operate daily from 5 AM to 11 PM. During peak hours, trains will run every 4 to 6 minutes, and every 10 to 15 minutes during non-peak hours.

4. How much will it cost to travel on the Yellow Line?

The fare structure is distance-based, with a minimum fare of ₹10 for trips up to 2 kilometers and a maximum fare of ₹60 for distances over 24 kilometers.

5. How will the Yellow Line benefit Bengaluru?

The Yellow Line will reduce travel times, improve connectivity, alleviate traffic congestion, and support economic growth by enhancing access to business districts and commercial areas.

Suggested Articels:

Bengaluru Double Decker Flyover: Stations, Route and Latest news

Bengaluru Double Decker Flyover: Stations, Route and Latest news

Bangalore’s Satellite Town Ring Road (STRR): A Lifeline Under Construction, phases & benefits

Bangalore Metro Route: Gree, pink, yellow, Blue, Purple and Orange line, timings, stations 2024

LEAVE A REPLY

Please enter your comment!
Please enter your name here