Introduction
The Navi Mumbai Metro, an ambitious Mass Rapid Transit System (MRTS) project spearheaded by the City and Industrial Development Corporation (CIDCO), represents a significant leap in urban transportation for Maharashtra. Although it faced numerous delays and challenges, the system is now operational with plans for extensive future expansions.
CIDCO Expands Navi Mumbai Metro Network: Latest Updates
Detailed Project Report (DPR) Preparation
CIDCO has engaged the Urban Mass Transit Company (UMTC) to prepare the Detailed Project Report (DPR) for these proposed extensions, ensuring thorough planning and execution.
The City and Industrial Development Corporation (CIDCO) has unveiled ambitious plans to expand the Navi Mumbai Metro network. This expansion aims to enhance connectivity to the Navi Mumbai International Airport (NMIA) and the broader Navi Mumbai Airport Influence Notified Area (NAINA). The project includes two new routes:
- Ulwe Coastal Road to Ambivali, Raigad
- Kalamboli–Chikhale–Kon Corridor
Category | Details |
---|---|
New Routes | – Ulwe Coastal Road to Ambivali, Raigad – Kalamboli–Chikhale–Kon Corridor |
Current Lines | Line-1: CBD Belapur to Pendhar Length: 11.10 km Inauguration Date: November 17, 2023 Type: Elevated Stations: 11 |
Planned Extensions | – Line-2: Taloja to Airport – Line-3: Airport to Belapur – Line-4: Belapur to Mankhurd |
New Proposals | – Ulwe Coastal Road to Ambivali – Kalamboli–Chikhale–Kon Corridor |
Budget Allocations | ₹539.37 crore for NAINA region development ₹690 crore for metro expansion |
Consultant | Appointed for Comprehensive Mobility Plan (CMP) |
Work on these new routes has commenced, with the tender process already underway and a consultant appointed for the Comprehensive Mobility Plan (CMP). The annual budget includes substantial allocations of ₹539.37 crore for NAINA region development and ₹690 crore for metro expansion
Also read: Mumbai Underground metro: Aqua Line Insights, stations and Latest news
Navi Mumbai Metro Overview
The Navi Mumbai Metro is designed to alleviate traffic congestion and enhance connectivity within the rapidly developing Navi Mumbai region. The initial operational phase, Line-1, stretches 11.1 kilometers from CBD Belapur to Pendhar, offering a crucial link across several key areas.
- Opening Date: November 17, 2023
- Operational Length: 11.1 km
- Future Expansion: Proposed lines totaling 95.30 km
- Current Line: Line-1
System Specifications
- Top Speed: 80 km/h
- Average Speed: 34 km/h
- Track Gauge: Standard Gauge – 1435 mm
- Electrification: 25 kV, 50 Hz AC Overhead Equipment (OHE)
- Signalling System: Cab Signalling/Distance to Go
Key Figures
- Estimated Daily Ridership (2027): 1 lakh
- Rolling Stock: 24 coaches, organized into 8 train sets, each consisting of 3 coaches, supplied by CRRC
- Operational Network: 11.1 km
- Under Construction: 0 km
- Proposed Network: 95.30 km
Navi Mumbai Metro Lines and Routes
Operational Line-1: CBD Belapur to Pendhar
- Length: 11.10 km
- Estimated Cost: ₹3063.63 crore
- Type: Elevated
- Depot: Taloja
- Number of Stations: 11
- Stations: Belapur Terminal, RBI Colony, Belpada, Utsav Chowk, Kendriya Vihar, Khargar Village, Central Park, Pethpada, Amandoot, Panchanand, and Pendhar
Navi mumbai Metro: Lines and Phases
Phase | Route | Length | Cost | Stations | Operational Since |
---|---|---|---|---|---|
Phase 1 | CBD Belapur to Pendhar | 11.10 km | ₹3063.63 crore | 11 | November 17, 2023 |
Phase 2 | Taloja to Khandeshwar | 7.12 km | ₹2820.20 crore | 6 | |
Phase 3 | MIDC to Pendhar (Interlink) | 3.87 km | ₹1750.14 crore | 3 | |
Phase 4 | Khandeshwar to Navi Mumbai Airport | 4.17 km | ₹1270.17 crore |
Navi Mumbai Metro Line 1: Route Map
source: Wikipedia
Navi Mumbai Metro Fares
The fare structure effective from November 16, 2023, is as follows:
Distance | Fare |
---|---|
0 to 2 km | ₹10 |
2 to 4 km | ₹15 |
4 to 6 km | ₹20 |
6 to 8 km | ₹25 |
8 to 10 km | ₹30 |
Beyond 10 km | ₹40 |
CIDCO plans to integrate advanced technologies for fare collection, including Near Field Communication (NFC) and QR codes.
Operating Hours and Frequency
- Operational Hours: 6 am to 10 pm
- Frequency: Every 15 minutes
- Daily Services: 65 up and 65 down
Ridership Statistics
Since its launch, the Navi Mumbai Metro has quickly gained popularity. Key ridership statistics include:
- November 2023: 2.23 lakh passengers, ₹57.52 lakh revenue
- December 2023: 3.77 lakh passengers, ₹1.06 crore revenue
- January 2024: 3.35 lakh passengers, ₹91.72 lakh revenue
- Total Revenue (Nov 2023 – Jan 2024): ₹2.55 crore
Significant Milestones
- November 2023: Inauguration of Line-1 from Belapur to Pendhar.
- June 2023: Clearance from CMRS for commercial operations.
- March 2023: Expected inauguration date, delayed.
- October 2021: RDSO certification received.
- August 2021: First trial run conducted.
- May 2021: Trial run from Kharghar to Taloja.
- March 2019: Arrival of 3-coach metro trains from China.
- May 2011: Foundation stone laid for the project.
Conclusion
The Mumbai Metro is a transformative project for Maharashtra, promising enhanced connectivity and significant urban development. With ongoing expansions and future plans, it is poised to become a key component of Navi Mumbai’s public transport infrastructure, catering to the needs of an expanding city and its residents.
Frequently Asked Questions:
The Navi Mumbai Metro is an urban Mass Rapid Transit System (MRTS) designed to improve transportation within Navi Mumbai. Managed by the City and Industrial Development Corporation (CIDCO), it aims to enhance connectivity in the region.
Navi Mumbai Metro Line-1, connecting CBD Belapur to Pendhar, was inaugurated on November 17, 2023
Line-1 spans 11.10 km and is an elevated metro line with 11 stations
Current Line: Line-1: CBD Belapur to Pendhar
Planned Extensions: Line-2 (Taloja to Airport), Line-3 (Airport to Belapur), Line-4 (Belapur to Mankhurd)
New Proposals: Ulwe Coastal Road to Ambivali, Kalamboli–Chikhale–Kon Corridor
The estimated daily ridership is around 1 lakh passengers by 2027.
Suggested Articles:
Mumbai Metro Line 12 Orange Line: Routes and Complete Guide 2024
Mumbai Underground metro: Aqua Line Insights, stations and Latest news
Delhi-Mumbai Expressway 2024: Everything You Need to Know About India’s Mega Road Project
Mumbai Metro Line 3: Check out the routes, stations, and map