Hyderabad Metro is a rapid transit system that serves the city of Hyderabad in the Indian state of Telangana. It was proposed in 2008 and approved by the Government of India in 2012. The project was implemented by the Hyderabad Metro Rail Limited (HMRL), a joint venture between the Government of Telangana and the Government of India.

Hyderabad Metro Rail
Hyderabad Metro Rail

The construction of the Hyderabad Metro began in 2012, and the first phase of the project was inaugurated on November 28, 2017. The first phase included the opening of the Blue Line, which runs from Nagole to Raidurg, and the Red Line, which runs from Miyapur to LB Nagar. The Green Line, which runs from Jubilee Bus Station to Falaknuma, was opened on February 7, 2020.

Inauguration of Hyderabad Metro

The journey of the Hyderabad Metro Blue Line project began with the groundbreaking ceremony (Bhoomi Puja) and pillar erection on April 26, 2012. The first phase of the project, covering a distance of 16.8 kilometers) and 14 stations between Nagole and Ameerpet, was inaugurated on November 28, 2017, by Prime Minister Narendra Modi. The route was opened to the public on the next day. 

The 8-station stretch spanning 10 kilometers between Ameerpet and HITEC City was inaugurated on March 20, 2019. The remaining three stations on the same section – Peddamma Gudi, Madhapur, and Jubilee Hills Check Post – were subsequently opened on March 30, April 13, and May 18 in the same year, respectively. On November 29, 2019, the final 1.5-kilometer section connecting HITEC City to Raidurg was made available to the public. 

Which Company built Hyderabad Metro?

The Hyderabad Metro Rail project is a public-private partnership (PPP) between the Government of Telangana and a consortium led by the infrastructure development company, Larsen & Toubro (L&T). The Hyderabad Metro Rail Limited (HMRL) is the implementing agency of the project and is responsible for the planning, design, construction, and operation of the metro system.

Budget of Hyderabad Metro

The project was initially estimated to cost around INR 14,132 crores ($2.4 billion USD) and was funded through a mix of equity and debt. The Indian government provided a loan of INR 1,458 crores ($200 million USD) for the project, and the rest of the funding was raised through equity and debt from various sources.

Bidding:

The bidding for the Hyderabad Metro project was conducted in two stages. The first stage involved the pre-qualification of bidders, and the second stage involved the selection of the concessionaire through a competitive bidding process. The consortium led by L&T emerged as the successful bidder for the project.

In September 2018, L&T handed over the operation and maintenance of the Hyderabad Metro to Keolis, a French multinational company that specializes in public transportation. Keolis is responsible for the operation and maintenance of the Hyderabad Metro under a 25-year contract.

Hyderabad Metro Route Maps

Blue Line Route Map

The Blue Line of Hyderabad Metro runs from Nagole in the eastern part of the city to Raidurg in the western part. It covers a distance of approximately 27 kilometers and has 23 stations.

Hyderabad Metro Blue Line Route Map
Hyderabad Metro Blue Line Route Map
  • The Blue Line of Hyderabad Metro is the first operational metro line in the city, which started operations in November 2017.
  • The Blue Line covers a distance of approximately 27 kilometers and has 23 stations.
  • The line starts from Nagole in the eastern part of the city and ends at Raidurg in the western part.
  • Some of the important stations on the Blue Line include Ameerpet, Begumpet, Hitec City, and Madhapur, which are major commercial and residential areas in Hyderabad.
  • The Blue Line intersects with the Red Line at Ameerpet station, which provides easy connectivity for passengers traveling between the two lines.

Hyderabad Metro Blue Line Stations List and Connections

Hyderabad Metro Blue Line starts from Nagole and Ends at Raidurg Metro station connects along with 23 following metro stations

S.NoStation NameConnectionsAlignment
1Nagole Metro StationNoneElevated
2Uppal Metro StationAirport ShuttleElevated
3StadiumNoneElevated
4NGRI Metro StationNoneElevated
5Habsiguda Metro StationNoneElevated
6Tarnaka Metro StationAirport ShuttleElevated
7Mettuguda Metro StationNoneElevated
8Secunderabad East Metro StationJubilee Bus Station

Secunderabad Railway Station

Airport Shuttle
Elevated
9Parade Ground Metro StationGreen LineElevated
10Paradise Metro StationAirport ShuttleElevated
11Rasoolpura Metro StationNoneElevated
12Prakash Nagar Metro StationNoneElevated
13Begumpet Metro StationBegumpet Railway Station

Airport Shuttle
Elevated
14Ameerpet Metro StationRed LineElevated
15Madhura Nagar Metro StationNoneElevated
16Yusufguda Metro StationNoneElevated
17Road No.5 Jubilee Hills Metro StationNoneElevated
18Jubilee Hills Check Post Metro StationNoneElevated
19Peddamma Temple Metro StationNoneElevated
20Madhapur Metro StationNoneElevated
21Durgam Cheruvu Metro StationNoneElevated
22Hitec City Metro StationAirport Shuttle Elevated
23Raidurg Metro StatioAirport Shuttle 
Airport Express Line
Elevated
Hyderabad Blue Line Metro Stops

Green Line Route Map of Hyderabad Metro

Hyderabad Metro Green Line Route Map
Hyderabad Metro Green Line Route Map
  • The Green Line of Hyderabad Metro is the newest operational metro line in the city, which started operations in February 2020.
  • The first phase is 9.6km long and connects JBS to MGBS, and the Second phase covers 5.5km long from MGBS to Falaknuma.
  • It was Inaugurated by Telangana Chief Minister K. Chandrashekar Rao On Feb 07th, 2020.
  • The Green Line covers a distance of approximately 15 kilometers and has 16 stations.
  • The line starts from Jubilee Bus Station in the central part of the city and ends at Falaknuma in the southern part.
  • Some of the important stations on the Green Line include Charminar, Salar Jung Museum, and L.B. Nagar, which are major tourist attractions and residential areas in Hyderabad.
  • The Green Line also has an interchange station with the Red Line at Parade Ground station, which provides easy connectivity for passengers traveling between the two lines.

Hyderabad Metro Green Line Stations List and Connections

Hyderabad Metro Green Line starts from JBS Bustand and Ends at Falaknuma Metro station connects along with 15 following metro stations

S.NoStation NameConnectionsAlignment
1Jubilee Bus Station Metro StationNoneElevated
2Parade Ground Metro StationBlue LineElevated
3Secunderabad East Metro StationNoneElevated
4Gandhi HospitalNoneElevated
5MusheerabadNoneElevated
6R.T.C. Cross RoadsNoneElevated
7ChikkadpallyNoneElevated
8NarayangudaNoneElevated
9Sultan BazaarNoneElevated
10M.G.B.SRed LineElevated
11Salarjung MuseumNoneElevated
12CharminarNoneElevated
13ShalibandaNoneElevated
14ShamsherganjNoneElevated
15JungamettaNoneElevated
16FalaknumaNoneElevated
Hyderabad Green Line Metro Stops

Red Line Route Map of Hyderabad Metro

Hyderabad Metro Red Line Route Map
Hyderabad Metro Red Line Route Map
  • The Red Line of Hyderabad Metro is one of the two operational metro lines in the city, which started operations in November 2017.
  • The Red Line covers a distance of approximately 30 kilometers and has 27 stations.
  • The line starts from Miyapur in the northwestern part of the city and ends at LB Nagar in the southeastern part.
  • Some of the important stations on the Red Line include KPHB Colony, JNTU, Kukatpally, Secunderabad, and Dilsukhnagar, which are major commercial and residential areas in Hyderabad.
  • The Red Line intersects with the Blue Line at Ameerpet station, which provides easy connectivity for passengers traveling between the two lines.
  • The Red Line has several elevated stations, which provide a bird’s-eye view of the cityscape.
  • The line has modern amenities such as elevators, escalators, and platform screen doors to ensure passenger safety and convenience.

Hyderabad Metro Red Line Stations List and Connections

Hyderabad Metro Green Line starts from JBS Bustand and Ends at Falaknuma Metro station connects along with 15 following metro stations

S.NoStation NameConnectionsAlignment
1Miyapur Metro StationNoneElevated
2JNTU College Metro StationNoneElevated
3KPHB Colony Metro StationNoneElevated
4Kukatpally Metro StationNoneElevated
5Balanagar Metro StationNoneElevated
6Moosapet Metro StationNoneElevated
7Bharat Nagar Metro StationBharat Nagar MMTS Railway StationElevated
8Erragadda Metro StationNoneElevated
9ESI Hospital Metro StationNoneElevated
10S R Nagar Metro StationNoneElevated
11Ameerpet Metro StationBlue LineElevated
12Punjagutta Metro StationNoneElevated
13Irrum Manzil Metro StationNoneElevated
14Khairatabad Metro StationNoneElevated
15Lakdikapul Metro StationNoneElevated
16Assembly Metro StationNoneElevated
17Nampally Metro StationNampally Railway StationElevated
18Gandhi Bhavan Metro StationNoneElevated
19Osmania Medical College Metro StationNoneElevated
20MG Bus Station Metro StationRed LineElevated
21Malakpet Metro StationNoneElevated
22New Market Metro StationNoneElevated
23Musarambagh Metro StationNoneElevated
24Dilsukhnagar Metro StationNoneElevated
25Chaitanyapuri Metro StationNoneElevated
26Victoria Memorial Metro StationNoneElevated
27LB Nagar Metro StationNoneElevated
Hyderabad Red Line Metro Stops

Interchanges On Red Line Metro

  • Ameerpet Interchange Station Connects the Red Line with Green Line.
  • Next Parade Ground Interchange Station Connects the Red Line with Blue Line.
  • After the Next MGBS Interchange Station Connects the Red Line with Green Line.

Hyderabad Metro Timings

Hyderabad Green Line Metro Rail Timings
  • The Hyderabad Metro Green Line operates from 6:00 AM to 11:00 PM on all days of the week.
  • The frequency of trains on the Green Line is approximately 8-10 minutes during peak hours and 12-15 minutes during non-peak hours.
  • The first train on the Green Line departs from the Jubilee Bus Station station at 6:00 AM and the last train departs from Falaknuma Station at 11:00 PM.
  • The total traveling time from JBS to Falaknuma is 45-50 minutes.

Hyderabad Blue Line Metro Rail Timings

  • The Hyderabad Metro Blue Line operates from 6:00 AM to 11:00 PM on all days of the week.
  • The frequency of trains on the Blue Line is approximately 8-10 minutes during peak hours and 12-15 minutes during non-peak hours.
  • The first train on the Blue Line departs from Nagole station at 6:00 AM and the last train departs from Raidurg station at 11:00 PM.

Hyderabad Red Line Metro Rail Timings

  • The Hyderabad Metro Red Line operates from 6:00 AM to 11:00 PM on all days of the week.
  • The frequency of trains on the Red Line is approximately 8-10 minutes during peak hours and 12-15 minutes during non-peak hours.
  • The first train on the Red Line departs from the Miyapur station at 6:00 AM and the last train departs from L.B. Nagar station at 11:00 PM.

Hyderabad Metro Ticket Rates

  • The fare for a one-way journey on the Hyderabad Metro ranges from Rs. 10 to Rs. 60, depending on the distance traveled and the type of ticket purchased.
  • The Hyderabad Metro offers various types of tickets, such as single journey tokens, smart cards, and QR code tickets.
  • The Hyderabad Metro also offers group and concessional tickets for senior citizens, students, and differently-abled persons.
  • The QR code ticket system allows passengers to purchase tickets through the Hyderabad Metro app or the TSavaari app, which can be scanned at the ticket gates for entry and exit.
Green Line Metro Ticket Rates:

According to the 2023 Green Line Metro Ticket Rates Mentioned below

Hyderabad Green Line Metro Ticket Rates List
Hyderabad Green Line Metro Ticket Rates List

Red Line Metro Ticket Rates:

According to the 2023 Red Line Metro Ticket Rates Mentioned below link

https://proudly.in/hyderabad-metro-rail-timings-ticket-fare-map/

Blue Line Metro Ticket Rates:

According to the 2023 Blue Line Metro Ticket Rates Mentioned below Pdf

Frequently Asked Questions

Q: When was the First Phase of Hyderabad Metro Started?

A: The First Phase of Hyderabad Metro was Started on November 28, 2017.

Q: How Much distance is Cover Hyderabad Metro Rail?

A: 70km distance is Cover Hyderabad Metro Rail.

Q: What is the Length of the Hyderabad Metro Blue Line?

A: The Length of the Hyderabad Metro Blue Line is approximately 27km.

Q: What are the Timings of the Hyderabad Metro?

A: The Timings of the Hyderabad Metro is 6 AM to 11 PM.

Q: What is the Maximum Speed of the Hyderabad Metro Rail?

A: Approximately 80kmph is the Maximum Speed of the Hyderabad Metro Rail.

Q: What is the Length of the Hyderabad Metro Green Line?

A: The Length of the Hyderabad Metro Green Line is approximately 15km.

Q: How much Cost of Hyderabad Metro Rail Ticket?

A: The Cost is between 10Rs-60Rs based on your traveled distance.