Introduction:

The Bangalore Vijayawada Expressway, designated as NH-544G, is a monumental infrastructure project under construction aimed at transforming connectivity between Bengaluru, Karnataka, and Vijayawada, Andhra Pradesh. This ambitious project is part of the Bharatmala Pariyojana (BMP) Phase 2 initiative, which seeks to enhance national road networks across India. With an estimated length of 624 kilometers, this expressway will be a crucial link in facilitating economic growth, improving transportation efficiency, and integrating regional development.

This article delves into the project’s key aspects, including its design, construction status, and the various tenders and contractors involved. We will explore the expressway’s route, its impact on the regions it traverses, and the broader implications for infrastructure development in India.


Also Read: Hyderabad Amaravati Expressway: Latest news and Project details 2024


Project Overview

AspectDetails
Total Length624 km
Estimated Cost₹19,320 crore
Completion DeadlineTo be determined
Lanes4-6 lanes
Right of Way100 meters
Design Speed120 kmph
OwnerNational Highway Authority of India (NHAI)
StatusUnder construction

The expressway project involves a mix of brownfield upgrades and greenfield development. Approximately 36% of the project will upgrade existing roads, while the remaining 64% will be newly constructed greenfield sections. This dual approach aims to blend modernization with new infrastructure, catering to increasing traffic demands and enhancing road safety and efficiency.

Detailed Corridor Breakdown:

The Bangalore–Vijayawada Expressway is segmented into three primary sections:

Brownfield Upgrade: NH-44 Bengaluru to Kodikonda

  • Length: 73 km
  • Description: This section upgrades the existing NH-44 from Bengaluru to Kodikonda. It involves widening and enhancing the road to accommodate increased traffic and improve safety.

Greenfield Section: Kodikonda to Addanki

Bangalore–Vijayawada Expressway
  • Length: 343 km
  • Description: This greenfield stretch will be newly constructed, connecting Kodikonda to Addanki. It will bypass existing towns and provide a direct route to streamline travel between major urban centers.

Brownfield Upgrade: NH-16 Addanki to Vijayawada

  • Length: 113 km
  • Description: Upgrading the existing NH-16 from Addanki to Vijayawada, this section aims to modernize the road infrastructure and enhance connectivity to the port city of Vijayawada.

Also Read: Pune Bangalore Expressway: Complete Guide & latest updates 2024


Route Map

Bangalore–Vijayawada map

The expressway will traverse significant towns and villages, including:

  • Kodikonda
  • Pulivendula
  • Mallepali
  • Vangapadu
  • Addanki
  • Chilakaluripet
  • Guntur
  • Vijayawada

These connections are crucial for regional integration and will boost economic activities by facilitating easier movement of goods and people.

Design Features:

The expressway’s design incorporates several key features:

  • Lane Width: Lanes are planned to be 3.75 meters wide.
  • Shoulders: Each section will include a 3-meter paved or 2-meter unpaved shoulder.
  • Median: A 19.50-meter depressed median will be included to enhance safety and reduce the likelihood of head-on collisions.

Tenders and Contractors:

The National Highway Authority of India (NHAI) has awarded contracts for the construction of the expressway through a Hybrid Annuity Model (HAM). Below is a detailed list of the tenders and the respective contractors:

PackageChainageContractor
Package 1Kodur (0.000) to Vanavolu (24.300)Dilip Buildcon (DBL)
Package 2Vanavolu (24.300) to Vankarakunta (45.700)Raj Path Infracon
Package 3Vankarakunta (45.700) to Odulapalle (72.000)Raj Path Infracon
Package 4Odulapalle (72.000) to Nallacheruvu palli (96.300)Dilip Buildcon (DBL)
Package 5Nallacheruvu palli (96.300) to Yerragudipadu (129.000)Megha Engineering & Infrastructures (MEIL)
Package 6Yerragudipadu (129.000) to Audireddipalle (160.000)Megha Engineering & Infrastructures (MEIL)
Package 7Audireddipalle (160.000) to Mallapalle (176.000)Dilip Buildcon Ltd. (DBL)
Package 8Mallapalle (176.000) to Kavulakuntla (196.000)Megha Engineering & Infrastructures (MEIL)
Package 9Kavulakuntla (196.000) to Narayanmpet (203.500)Max Infra (I) – Bekem Infra Projects
Package 10Narayanmpet (203.500) to Chandrasekharpuram (228.000)Megha Engineering & Infrastructures (MEIL)
Package 11Chandrasekharapuram (228.000) to Polavaram (260.000)Megha Engineering & Infrastructures (MEIL)
Package 12Polavaram (260.000) to Marripudi (285.500)Megha Engineering & Infrastructures (MEIL)
Package 13Marripudi (285.500) to Somavarappadu (314.600)KNR Constructions
Package 14Somavarappadu (314.600) to Muppavaram (343.240)Megha Engineering & Infrastructures (MEIL)

Also Read: Bangalore-Mysore Expressway: Key Features, Toll, Project Details


Conclusion:

The Bangalore–Vijayawada Expressway represents a significant advancement in India’s road infrastructure. Once completed, it will substantially enhance connectivity between major cities in Karnataka and Andhra Pradesh, facilitate smoother and faster travel, and drive economic growth in the region. The blend of brownfield upgrades and greenfield construction reflects a strategic approach to addressing both existing and future transportation needs.

With a substantial investment of ₹19,320 crore and the involvement of prominent contractors, the project is poised to make a lasting impact on regional development. The expressway will not only improve logistics and reduce travel time but also support local economies by connecting key towns and fostering economic activities.

As construction progresses, the Bangalore–Vijayawada Expressway will emerge as a critical component of India’s national highway network, setting new standards for efficiency, safety, and infrastructure quality in the country.

Frequently Asked Questions:

Q1.What is the Bangalore–Vijayawada Expressway?

The Bangalore–Vijayawada Expressway is a 624-kilometer-long infrastructure project under construction, aimed at improving connectivity between Bengaluru, Karnataka, and Vijayawada, Andhra Pradesh.

Q2.What is the purpose of the Bangalore–Vijayawada Expressway?

The expressway aims to facilitate economic growth, improve transportation efficiency, and integrate regional development as part of the Bharatmala Pariyojana (BMP) Phase 2 initiative.

Q3.How is the Bangalore–Vijayawada Expressway being constructed?

The project involves both brownfield upgrades of existing roads and greenfield development of new sections, with a mix of 36% upgrades and 64% new construction.

Q4.What are the key features of the expressway’s design?

Key design features include 3.75-meter-wide lanes, 3-meter paved or 2-meter unpaved shoulders, and a 19.50-meter depressed median for enhanced safety.

Q5.Who are the main contractors for the expressway project?

Prominent contractors involved include Dilip Buildcon, Raj Path Infracon, Megha Engineering & Infrastructures, and KNR Constructions, among others.

Suggested Articles:

Bangalore-Mysore Expressway: Key Features, Toll, Project Details

Pune Bangalore Expressway: Complete Guide & latest updates 2024

Hyderabad Amaravati Expressway: Latest news and Project details 2024

LEAVE A REPLY

Please enter your comment!
Please enter your name here